PROJ 6002: Project Planning and Budgeting – Scope and Time Management Plan

ASSESSMENT BRIEF
Subject Code and TitlePROJ 6002: Project Planning and Budgeting
AssessmentAssessment 1 – Scope and Time Management Plan (2 parts) Part A: Module 2 Discussion ActivityPart B: Scope and Time Management Plan
Individual/GroupIndividual/Group
LengthPart A: 750 words/student Part B: 1500 words/student
Learning OutcomesSuccessful completion of this assessment will result in achievement of the following subject learning outcomes:   Evaluate and apply a range of project scope, cost and time management planning techniques and practices to address the needs of complex project briefs, including global, paying particular attention to issues impacting project outcomes.Present and justify budgetary and planning outcomes to a globally diverse range of stakeholders who represent competing interests in order to obtain agreement and commitment to action
SubmissionPart A: Initial discussion by first half of Module 2. Response by 11:55pm AEST/AEDT Sunday End of Module 2 Part B: By 11:55pm AEST/AEDT Sunday End of Module 3
Weighting50% (Part A: 10%; Part B: 40%)
Total MarksPart A: 10 marks Part B: 40 marks

Context:

The backbone of a project manager’s work is the Project Management Plan. This plan is the document which describes how the project will be executed, monitored and controlled. It integrates and consolidates all of the subsidiary plans and baselines from the planning processes. In this subject, you will be creating components of a Project Management Plan for your selected Case Study.

Project Scope Management includes the processes required to ensure that the project includes all the work required, and only the work required, to complete the project successfully. Managing the project scope is primarily concerned with defining and controlling what is and is not included in the project.

Project Time Management includes the processes required to manage the timely completion of the project. Plan Time Management is the process of establishing the policies, procedures, and documentation for planning, developing, managing, executing, and controlling the project schedule.

Effective scope management is one of the key factors determining project success. Failure to accurately interpret a client’s needs or problems will produce a misleading definition (scope of work). If this causes rework and additional effort, there may be project cost and time implications. Therefore project success will be self-limiting if the scope of work is not adequately defined.

Instructions:

This assessment has two parts: Module 2 Discussion Activity (Part A) and Scope and Time Management documentation (Part B).

Part A – Module 2 Discussion Activity

Schedule Management.

How might changes to project scope affect the project’s schedule, and how would a project manager formally communicate such variances to project stakeholders? Illustrate some examples from the given case study to support your discussion.

Output

Provide an initial discussion of approximately 500 words by the first half of Module 2. Respond with approximately 250 words for each feedback/comment to at least one fellow student’s discussion by the end of Module 2 (Total 750 words for Assessment 1 Part A).

Part B – Scope and Time Management Plans

In this subject, you will be creating subsidiary management plans of a Project Management Plan using the information found in the case study provided by your learning facilitator at the commencement of the subject.

In modules 1, 2 and 3, you will work individually or in a group of 2-3 students on the given case study. For Assessment 1 Part B, you are responsible for submitting the project scope and time management plans for the case study. The plans must contain, but not limited to, the following plan components:

  • Project goals and objectives
  • Project scope statement
  • Work Breakdown Structure (WBS)
  • Project schedule

For the project scope statement and WBS, you can use the templates found in this module’s Learning Resources or a format of your own. For the project schedule, you are responsible for submitting a schedule and a network diagram using the critical path method (CPM). Your schedule can be created using scheduling software e.g. ProjectLibre or Microsoft Project. Your network diagram can be hand- drawn and scanned or created using drawing tools e.g. in Microsoft Word or PowerPoint.

Your written project goals, project objectives and scope statement should consist of 1500 words/student.

Output:

Complete and submit your Scope and Time Management Plan individually or in a group of 2 to 3 students by the end of Module 3. If your submission is in group, only one group member to submit the assessment. Each group member is required to submit a contribution form.

Learning Resources

Heldman, K. (2013). PMP Project Management Professional Exam Study Guide (7th ed.). Indianapolis, IN: Wiley.

  • Chapter 3: Planning the Project Scope Statement
  • Chapter 4: Creating the Project Schedule

Kheder, M. (2014). Project Scope Management (Streaming video). Retrieved from https://www.youtube.com/watch?v=7wvk9DZEgtw

ProjectLibre. (n.d.). ProjectLibre: Open source replacement of Microsoft Project [Software download]. Retrieved from http://www.projectlibre.org/

Project Management Institute. (2017). A guide to the project management body of knowledge (PMBOK Guide®) (6th ed.). Newtown Square, Pennsylvania: Project Management Institute.

Project Management Institute. (2013). A guide to the project management body of knowledge (PMBOK Guide®) (5th ed.). Newtown Square, Pennsylvania: Project Management Institute.

  • Section 1.5: Relationship Between Project Management, Operations Management and Organizational Strategy
  • Section 1.6: Business Value
  • Section 1.7: Role of the Project Manager
  • Section 4.2: Develop Project Management Plan
  • Section 5.1: Plan Scope Management
  • Section 5.2: Collect Requirements
  • Section 5.3: Define Scope
  • Section 5.4: Create WBS
  • Section 6.1: Plan Schedule Management
  • Section 6.2: Define Activities
  • Section 6.3: Sequence Activities
  • Section 6.4: Estimate Activity Resources
  • Section 6.5: Estimate Activity Durations
  • Section 6.6: Develop Schedule

Snyder, C. S. (2013). A project manager’s book of forms: A companion to the PMBOK guide (2nd ed.). Indianapolis, IN: Wiley Publishing.

  • Document: Network Diagram Template and Example (Word document)
  • Document: Project Scope Statement Template (Word document)
  • Document: Work Breakdown Structure Template and Example (Word document)

Thayer School of Engineering at Dartmouth (2014). Project Scheduling (Streaming video). Retrieved from https://www.youtube.com/watch?v=Rq19ga0U_jQ

Wysocki, R. K. (2014). Effective Project Management: Traditional, Agile, Extreme (7th ed.). Indianapolis, IN: Wiley.

  • Chapter 4: How to Scope a TPM Project
  • Chapter 5: How to Plan a TPM Project (Read the sections from ‘Building the WBS’ through to ‘Constructing the Project Network Diagram’)

Document: ProjectLibre Student Guide (PDF)

Assessment Criteria:

Submitted assessments will be marked using the Learning Rubrics enclosed.

Learning Rubric: Part A – Module Discussion Activity

Assessment AttributesFail (0-49)Pass (50-64)Credit (65-74)Distinction (75-84)High Distinction (85-100)
Evaluation and application of a range of project scope, cost and time management planning techniques and practices to address project briefs and stakeholder needs   60%Fails to evaluate or apply project scope, cost and time management planning techniques/practices to address project briefs and/or stakeholder needs.Evaluates and applies project scope, cost and time management planning techniques and practices to address project briefs.   Understands stakeholders and communication management principles and processes.Evaluates and applies a range of project scope, cost and time management planning techniques and practices to address project briefs.   Identifies key stakeholders’ communication processes.Evaluates and applies a range of project scope, cost and time management planning techniques and practices to address project briefs and issues impacting project outcomes and success.   Identifies key stakeholders’ communication processes and articulates strategies to communicate project status.   Identifies options to satisfy changes and their impact on project outcomes.Critically evaluates and applies a range of project scope, cost and time management planning techniques and practices to address project briefs and issues impacting project outcomes and success.   Identifies key stakeholders’ communication processes and articulates strategies to communicate project status and risk analysis result with key stakeholders.   Formulates a process to forecast potential change to project to minimise it and develops a strategy to manage the change.
Constructive feedback to peers   30%Fails to offer any feedback.   No support or encouragement to peers.   No awareness or sensitivity to diversity amongst peers.Offers feedback but rarely constructive or useful.   Feedback is not always clear or specific to guide peers.   Little support or encouragement to peers.   Demonstrates little awareness of and/or sensitivity to diversity amongst peers.Offers feedback that is sometimes constructive or useful.   Feedback is provided with examples to guide peers.   Some support and encouragement to peers.   Demonstrates some level of awareness of and sensitivity to diversity amongst peers.Offers constructive feedback regularly.   Formulates the merits of alternative ideas or proposals and communicates them to peers.   Offers support and encouragement to peers.   Demonstrates a high level of awareness of and sensitivity to diversity amongst peers.Always offers detailed constructive feedback that is specific and appropriate.   Expertly articulates the merits of alternative ideas or proposals and communicates them effectively to peers.   Provides expert assistance, support, and encouragement to peers.   Consistently demonstrates a high level of awareness of and sensitivity to diversity amongst peers.
Use of academic and discipline conventions and sources of evidence   10%Poorly written with errors in spelling, grammar.   Demonstrates inconsistent use of good quality, credible and relevant research sources to support and develop ideas.Is written according to academic genre (e.g. with introduction, conclusion or summary) and has accurate spelling, grammar, sentence and paragraph construction.   Demonstrates consistent use of credible and relevant researchIs well-written and adheres to the academic genre (e.g. with introduction, conclusion or summary).   Demonstrates consistent use of high quality, credible and relevant research sources to support and develop ideas.Is very well-written and adheres to the academic genre.   Consistently demonstrates expert use of good quality, credible and relevant research sources to support and develop appropriate arguments and statements. ShowsExpertly written and adheres to the academic genre.   Demonstrates expert use of high-quality, credible and relevant research sources to support and develop arguments and position statements. Shows extensive evidence of
There are mistakes in using the APA style.sources to support and develop ideas, but these are not always explicit or well developed. There are no mistakes in using the APA style.  There are no mistakes in using the APA style.evidence of reading beyond the key reading   There are no mistakes in using the APA style.reading beyond the key reading   There are no mistakes in using the APA Style.

Learning Rubric: Part B – Scope and Time Management Plans

Assessment AttributesFail (0-49)Pass (50-64)Credit (65-74)Distinction (75-84)High Distinction (85-100)
Knowledge and understanding of scope and time management planning techniques   60%Neglects one or more elements of project scope and time management planning techniques.   Key components of the plan are not addressed.Completes all elements of project scope and time management planning techniques.   Resembles a recall or summary of key ideas.   Often conflates/confuses assertion of personal opinion with information substantiated by evidence from the research/course materials.Elaborates all elements of project scope and time management planning techniques.   Supports personal opinion and information substantiated by evidence from the research/course materials. Demonstrates a capacity to explain and apply relevant concepts.Elaborates all elements of project scope and time management planning techniques and identifies the issues impacting scope and time management planning as they effect project outcomes.     Discriminates between assertion of personal opinion and information substantiated by robust evidence from the research/course materials.   Well demonstrated capacity to explain and apply relevant concepts.Critically evaluates and applies a range of scope and time management planning tools and techniques to address project briefs and elaborates the issues impacting project outcomes and success.   Critically discriminates between assertion of personal opinion and information substantiated by robust evidence from the research and course materials.   Mastery of concepts and application to new situations/further learning.
Use of academic and discipline conventions and sources of evidencePoorly written with errors in spelling, grammar.   Demonstrates inconsistent use of good quality, credibleIs written according to academic genre (e.g. with introduction, conclusion or summary) and has accurateIs well-written and adheres to the academic genre (e.g. with introduction, conclusion or summary).Is very well-written and adheres to the academic genre.Expertly written and adheres to the academic genre.
10%and relevant research sources to support and develop ideas.   There are mistakes in using the APA style.spelling, grammar, sentence and paragraph construction.   Demonstrates consistent use of credible and relevant research sources to support and develop ideas, but these are not always explicit or well developed.   There are no mistakes in using the APA style.  Demonstrates consistent use of high quality, credible and relevant research sources to support and develop ideas.   There are no mistakes in using the APA style.Consistently demonstrates expert use of good quality, credible and relevant research sources to support and develop appropriate arguments and statements. Shows evidence of reading beyond the key reading   There are no mistakes in using the APA style.Demonstrates expert use of high-quality, credible and relevant research sources to support and develop arguments and position statements. Shows extensive evidence of reading beyond the key reading   There are no mistakes in using the APA Style.
Effective communication   30%Difficult to understand for audience, no logical/clear structure, poor flow of ideas, argument lacks supporting evidence.   No effort is made to keep audience engaged, audience cannot follow the line of reasoning.   Little use of presentation aids, or the presentation aids and material used are irrelevant.Information, arguments and evidence are presented in a way that is not always clear and logical.   Attempts are made to keep the audience engaged, but not always successful. Line of reasoning is often difficult to follow.   Presentation aids are used more for effect than relevance.Information, arguments and evidence are well presented, mostly clear flow of ideas and arguments.   The audience is mostly engaged, line of reasoning is easy to follow.   Effective use of presentation aids.Information, arguments and evidence are very well presented, the presentation is logical, clear and well supported by evidence.   Engages the audience, demonstrates cultural sensitivity.   Carefully and well prepared presentations aids are used.Expertly presented; the presentation is logical, persuasive, and well supported by evidence, demonstrating a clear flow of ideas and arguments.   Engages and sustains audience’s interest in the topic, demonstrates high levels of cultural sensitivity   Effective use of diverse presentation aids, including graphics and multi-media.
Order Now

Get expert help for PROJ6002 – Project Planning and Budgeting and many more. 24X7 help, plag free solution. Order online now!

Universal Assignment (March 28, 2024) PROJ 6002: Project Planning and Budgeting – Scope and Time Management Plan. Retrieved from https://universalassignment.com/proj-6002-project-planning-and-budgeting-scope-and-time-management-plan/.
"PROJ 6002: Project Planning and Budgeting – Scope and Time Management Plan." Universal Assignment - March 28, 2024, https://universalassignment.com/proj-6002-project-planning-and-budgeting-scope-and-time-management-plan/
Universal Assignment October 10, 2022 PROJ 6002: Project Planning and Budgeting – Scope and Time Management Plan., viewed March 28, 2024,<https://universalassignment.com/proj-6002-project-planning-and-budgeting-scope-and-time-management-plan/>
Universal Assignment - PROJ 6002: Project Planning and Budgeting – Scope and Time Management Plan. [Internet]. [Accessed March 28, 2024]. Available from: https://universalassignment.com/proj-6002-project-planning-and-budgeting-scope-and-time-management-plan/
"PROJ 6002: Project Planning and Budgeting – Scope and Time Management Plan." Universal Assignment - Accessed March 28, 2024. https://universalassignment.com/proj-6002-project-planning-and-budgeting-scope-and-time-management-plan/
"PROJ 6002: Project Planning and Budgeting – Scope and Time Management Plan." Universal Assignment [Online]. Available: https://universalassignment.com/proj-6002-project-planning-and-budgeting-scope-and-time-management-plan/. [Accessed: March 28, 2024]

Please note along with our service, we will provide you with the following deliverables:

Please do not hesitate to put forward any queries regarding the service provision.

We look forward to having you on board with us.

Categories

Get 90%* Discount on Assignment Help

Most Frequent Questions & Answers

Universal Assignment Services is the best place to get help in your all kind of assignment help. We have 172+ experts available, who can help you to get HD+ grades. We also provide Free Plag report, Free Revisions,Best Price in the industry guaranteed.

We provide all kinds of assignmednt help, Report writing, Essay Writing, Dissertations, Thesis writing, Research Proposal, Research Report, Home work help, Question Answers help, Case studies, mathematical and Statistical tasks, Website development, Android application, Resume/CV writing, SOP(Statement of Purpose) Writing, Blog/Article, Poster making and so on.

We are available round the clock, 24X7, 365 days. You can appach us to our Whatsapp number +1 (613)778 8542 or email to info@universalassignment.com . We provide Free revision policy, if you need and revisions to be done on the task, we will do the same for you as soon as possible.

We provide services mainly to all major institutes and Universities in Australia, Canada, China, Malaysia, India, South Africa, New Zealand, Singapore, the United Arab Emirates, the United Kingdom, and the United States.

We provide lucrative discounts from 28% to 70% as per the wordcount, Technicality, Deadline and the number of your previous assignments done with us.

After your assignment request our team will check and update you the best suitable service for you alongwith the charges for the task. After confirmation and payment team will start the work and provide the task as per the deadline.

Yes, we will provide Plagirism free task and a free turnitin report along with the task without any extra cost.

No, if the main requirement is same, you don’t have to pay any additional amount. But it there is a additional requirement, then you have to pay the balance amount in order to get the revised solution.

The Fees are as minimum as $10 per page(1 page=250 words) and in case of a big task, we provide huge discounts.

We accept all the major Credit and Debit Cards for the payment. We do accept Paypal also.

Popular Assignments

Bsc Public Health and Health Promotion (Top up) LSC LONDON

Health and Work Assignment Brief.                 Assessment brief: A case study of 4,000 words (weighted at 100%) Students will present a series of complementary pieces of written work that:   a) analyse the key workplace issues; b) evaluate current or proposed strategies for managing them from a public health/health promotion perspective

Read More »

6HW109 Environmental Management and Sustainable Health

ASSESSMENT BRIEF MODULE CODE: 6HW109 MODULE TITLE: Environmental Management and Sustainable Health MODULE LEADER: XXXXXXXXX ACADEMIC YEAR: 2022-23 1        Demonstrate a critical awareness of the concept of Environmental Management linked to Health 2        Critically analyse climate change and health public policies. 3        Demonstrate a critical awareness of the concept of

Read More »

PROFESSIONAL SECURE NETWORKS COCS71196

PROFESSIONAL SECURE NETWORKS– Case Study Assessment Information Module Title: PROFESSIONAL SECURE NETWORKS   Module Code: COCS71196 Submission Deadline: 10th May 2024 by 3:30pm Instructions to candidates This assignment is one of two parts of the formal assessment for COCS71196 and is therefore compulsory. The assignment is weighted at 50% of

Read More »

CYBERCRIME FORENSIC ANALYSIS – COCS71193

CYBERCRIME FORENSIC ANALYSIS – COCS71193 Assignment Specification Weighted at 100% of the module mark. Learning Outcomes being assessed by this portfolio. Submission Deadline: Monday 6th May 2024, 1600Hrs. Requirements & Marking Scheme General Guidelines: This is an individual assessment comprised of four parts and is weighted at 100% of the

Read More »

Social Media Campaigns (SMC) Spring 2024 – Winter 2024

Unit: Dynamic Websites Assignment title: Social Media Campaigns (SMC) Spring 2024 – Winter 2024 Students must not use templates that they have not designed or created in this module assessment. This includes website building applications, free HTML5 website templates, or any software that is available to them to help with

Read More »

ABCJ3103 NEWS WRITING AND REPORTING Assignment

ASSIGNMENT/ TUGASAN _________________________________________________________________________ ABCJ3103 NEWS WRITING AND REPORTING PENULISAN DAN PELAPORAN BERITA JANUARY 2024 SEMESTER SPECIFIC INSTRUCTION / ARAHAN KHUSUS Jawab dalam bahasa Melayu atau bahasa Inggeris. Jumlah patah perkataan: 2500 – 3000 patah perkataan tidak termasuk rujukan. Hantar tugasan SEKALI sahaja dalam PELBAGAIfail. Tugasan ini dihantar secara ONLINE. Tarikh

Read More »

ABCM2103 INFORMATION TECHNOLOGY, MEDIA AND SOCIETY Assignment

ASSIGNMENT/ TUGASAN _________________________________________________________________________ ABCM2103 INFORMATION TECHNOLOGY, MEDIA AND SOCIETY TEKNOLOGI MAKLUMAT, MEDIA DAN MASYARAKAT JANUARY 2021 SPECIFIC INSTRUCTION / ARAHAN KHUSUS Jawab dalam Bahasa Melayu atau Bahasa Inggeris. Jumlah patah perkataan : 2500 – 3000 patah perkataan tidak termasuk rujukan. Hantar tugasan SEKALI sahaja dalam SATU fail. Tugasan ini dihantar

Read More »

ABCR3203 COMMUNICATION LAW Assignment

ASSIGNMENT/ TUGASAN _________________________________________________________________________ ABCR3203 COMMUNICATION LAW UNDANG-UNDANG KOMUNIKASI JANUARY 2024 SEMESTER SPECIFIC INSTRUCTION / ARAHAN KHUSUS Jawab dalam Bahasa Melayu atau Bahasa Inggeris. Jumlah patah perkataan : 2500 – 3000 patah perkataan tidak termasuk rujukan. Hantar tugasan SEKALI sahaja dalam SATU fail. Tugasan ini dihantar secara ONLINE. Tarikh penghantaran        :

Read More »

ORGANISATIONAL STRATEGY PLANNING AND MANAGEMENT ASSIGNMENT

POSTGRADUATE DIPLOMA IN BUSINESS MANAGEMENT ORGANISATIONAL STRATEGY PLANNING AND MANAGEMENT ASSIGNMENT NOTE: At postgraduate level, you are expected to substantiate your answers with evidence from independent research. INTRODUCTION TO THE ASSIGNMENT • This assignment consists of FOUR compulsory questions. Please answer all of them. • When you answer, preferably use

Read More »

Solution: Scenario 1, Mirror therapy in patients post stroke

Title: Scenario 1, Mirror therapy in patients post stroke Part 1 : Summary Ramachandran and colleagues developed mirror therapy to treat amputees’ agony from phantom limbs. Patients were able to feel their amputated limb without experiencing any pain by presenting them a mirror image of their healthy arm. Since then,

Read More »

Solution: Exploring the Dominance of Silence

Slide 1: Title – Exploring the Dominance of Silence The title, “Exploring the Dominance of Silence,” sets the stage for a deep dive into the portrayal of silence in Philip K. Dick’s “Do Androids Dream of Electric Sheep?” Our presentation will dissect the literary techniques used by the author to

Read More »

Solution: Assessment: Critical Reflection S2 2023

The policies that hampered the cultural survival of Indigenous groups have a major effect on their health (Coffin, 2007). Cultural isolation can cause an identity crisis and a sense of loss, which can exacerbate mental health problems. Indigenous people have greater rates of chronic illness and impairment due to historical

Read More »

Solution: The Market – Product and Competition Analysis

Section 1: The Market – Product and Competition Analysis Industry and Competition Analysis: The baking mix market is very competitive, but My Better Batch is entering it anyhow. The prepackaged baking mixes sold in this market allow busy people to have bakery-quality products on the table quickly without sacrificing quality

Read More »

Solution: PDCA model for Riot

Student Name: Student ID: University Name: Date: Learning Outcome 1: Engage actively in recognizing a new product/service for Riot and detect the vital tasks required for its effective growth. In this comprehensive learning outcome, Riot’s progress towards innovation superiority is characterized by a deliberate scheme that draws on components from

Read More »

Solution: EDEN 100 – ASSIGNMENT 1

Part 1: Reflections on the Register Variables Use the questions in Column 1 and analyse the sample oral interactions provided under the assessment tile. The transcript for Viv’s conversation is provided on pages 4-5. Probe Questions  Link to readings and theory Interaction 1 Interaction 2 PART 1 – ANALYSING THE

Read More »

Solution: TCP/IP Questions

Table of Contents Question 1. 1 1. IPSec datagram protocol 1 2. Source and destination IP addresses in original IP datagram.. 1 3. Source and destination IP addresses in new IP header 2 4. Protocol number in the protocol field of the new IP header 2 5. Information and Bob.

Read More »

Solution: Fundamentals of Employment Assistance Program and Counselling

ASSESSMENT 3 Subject: Fundamentals of Employment Assistance Program and Counselling Case study Question 1 a)     Major Issues for Theo that could be addressed in counselling: b)    Issues to Address First in Short-Term Counselling:             The cognitive processes of memory, focus, and decision-making are all impacted by insufficient sleep. Such cognitive

Read More »

Solution: EQUITY AND INCLUSION IN EARLY CHILDHOOD IN AUSTRALIA

Written Policy Recommendation Name: Student Number: Email: Date: Introduction: The early years of a child’s life are important for their holistic development, making early childhood education a foundation for their future accomplishments. Nevertheless, guaranteeing equality and inclusion in early childhood education stays a major problem in our society. This policy

Read More »

Solution: Report Health Issue

Table of Contents Executive Summary                                                                                                   3 Introduction                                                                                                                5 Examination of the Chosen Health Issue in the Context of Lambeth                        5 Application of Health Inequality Framework and Analysis of Determinants: Psychotropic Drug Use in Lambeth                                                                           6 Exploration and Discussion of Strategies to Manage Psychotropic Drug Use in Lambeth                                                                                                                        7 Conclusion                                                                                                                  8

Read More »

Solution: Section III: Marketing

Section III: Marketing Channels for Advertising: Understanding Who Makes Baking Product Purchase Decisions is Crucial for My Better Batch’s Business Success (Sampson et al, 2017). Home bakers may make up a disproportionate share of the decision-makers in the UK. As a result, My Better Batch has to target people, especially

Read More »

Solution: Analytics Project Project Management Plan

Analytics Project Project Management Plan Date: 22-10-2023 Author: Name Here Version: 2.0 Project Management Plan (PMP) This project management plan will outline the strategies and plans used to manage ‘analytics project’ for the Style-Hub organization. It will include the tasks such as project governance, management, planning, budget and controlling. It

Read More »

Solution: Report Health Issue

Table of Contents Executive Summary                                                                                                   3 Introduction                                                                                                                5 Examination of the Chosen Health Issue in the Context of Lambeth                        5 Application of Health Inequality Framework and Analysis of Determinants: Psychotropic Drug Use in Lambeth                                                                           6 Exploration and Discussion of Strategies to Manage Psychotropic Drug Use in Lambeth                                                                                                                        7 Conclusion                                                                                                                  8

Read More »

Solution: Mirror therapy in patients post stroke

Title: Scenario 1, Mirror therapy in patients post stroke Part 1 : Summary Ramachandran and colleagues developed mirror therapy to treat amputees’ agony from phantom limbs. Patients were able to feel their amputated limb without experiencing any pain by presenting them a mirror image of their healthy arm. Since then,

Read More »

Can't Find Your Assignment?

Open chat
1
Free Assistance
Universal Assignment
Hello 👋
How can we help you?