Truck Cycle time and productivity DESIGN ASSIGNMENT
DESIGN ASSIGNMENT Truck Cycle time and productivity A limestone Quarry is being exploited for the refurbishing of an existing hydroelectric dam. The construction site is located 3.6 miles away from quarry. The first 1.1 miles near the quarry are on a 12% graded slope (down towards the quarry). The remaining