Academic / Assignment Report Help

DEFINITIONS OF ELEMENTS

PRELIMINARIES

PR PRELIMINARIES

It INCLUDES preliminary items as defined in Section 2 of the Australian Standard Method of Measurement of Building Works (5th Edition), where ascertainable.

SUBSTRUCTURE

SB SUBSTRUCTURE – The structurally sound and watertight base upon which to build.

It INCLUDES basement and foundation excavations; piers, piles, pedestals, beams and strip footings; foundation walls; drop aprons; hardcore filling; work slabs and damp-proofing or other membranes; floor structures; subsoil drainage; ducts, pits, bases and service tunnels; entrance steps, ramps and their finishes; steps and ramps in the one floor level; structural screeds and toppings; covered swimming pools; all other work up to but excluding the lowest floor finish.

It EXCLUDES “Site Preparation” (XP); basement walls (EW); columns above tops of bases (CL, EW, NW); “Floor Finishes (FF); all non-structural work associated with the internal services.

Academic / Assignment Report Help

SUPERSTRUCTURE

CL COLUMNS (FRAMED BUILDINGS) – The upright supports to upper floors and roof forming part of a framed structure.

It INCLUDES internal and external columns from tops of columns to bases; column casings; all protective non-decorative coatings.

It EXCLUDES portal frames (RF); columns to non-framed (load bearing) structures (EW, NW); columns supporting awnings and attached covered ways (RF); columns supporting exposed attached external stairs (SC); all finishes (EW, WF).

Note: Columns below lowest floor finish (eg in filled areas) are included in this element because of the impracticability of splitting a column into two elements.

UF UPPER FLOORS – Floor structures above that at the lowest level.

It includes all beams; concrete, precast and in-situ floors; waffle slab and filler block floors; metal floors; computer floors; timber framed floors; structural screeds and toppings; concealed insulation; balconies; overhangs and sunhoods integral with floors; steps and ramps in the one floor level; all protective non-decorative coatings.

Academic / Assignment Report Help

It EXCLUDES landings and ramps between floor levels (SC); balcony balustrades (EW); internal and external finishes (SC, EW, FF, CF).

SC STAIRCASE – The structural connections between two or more nominal floor levels or to roof, plant rooms and motor rooms together with associated finishes.

It INCLUDES landings; ramps between floor levels; fire escapes; supporting framework; access ladders; spiral staircases; tread, riser, string and soffit finishes; balustrades and handrails.

It EXCLUDES steps and ramps at changes in the one floor level (SB, UF); ground level entrance steps (SB); lifts and escalators (TS).

RF ROOF – To provide a structurally sound and watertight covering over the building.

It INCLUDES portal frames; roof construction; gable and other walls in roof spaces; parapet walls and roof balustrades; thermal insulation rooflights and dormers with their sunscreenings; eaves, verges and fascias; rainwater goods; internal stormwater drainage runs; awnings and open lean-to roofs; all protective non-decorative coatings.

It EXCLUDES rainwater goods to balconies and other unenclosed floor areas (UF); all non-structural work associated with the internal services; independent roofs to exposed attached external stairs (SC).

EXTERNAL FABRIC AND FINISHES

EW EXTERNAL WALLS – The vertical enclosure around the building other than “Windows” and “External Doors” from “Substructure” to “Roof”.

It INCLUDES structural walls; basement walls and tanking above lowest floor finish; spandrel, curtain and window walls; external shop fronts; glazed screen walls; columns and isolated piers to non-framed (load bearing) structures; gallery and balcony walls and balustrades; solar screen walls; plant room air flow screens; all insulation to external walls; all external finishes to all columns, slab edges, beams, projecting overhangs and walls; lintels and flashings at openings; ring beams and stiffening beams not integral with floor, ceiling or roof slabs.

It EXCLUDES all internal finishes to external walls (except screens and the like) and columns (WF); sills, thresholds and linings (WW, ED); walls in “Roof” (RF) and “Substructure (SB) and all doors (ED); sun protection to windows (WW) and sunhoods integral with floors (UF); fire places, hearts, flues and stacks (SH, SS); beams integral with slabs (UF, RF).

Academic / Assignment Report Help

WW WINDOWS – Opening in “External Walls” to provide light and ventilation.

It INCLUDES flyscreens; louvres, guard grilles; remote control gear; sun protection to windows; curtains, blinds, track and pelmets, window sills and linings; hardware; decoration.

It EXCLUDES lintels and flashings (EW); special blackout facilities (SE); rooflights and dormers (RF); window walls and glazed screens (EW); sunhoods integral with floors (UF); solar screen walls (EW); window cleaning equipment (SE).

Note: Includes hardware and decorations, glazing and infill panels within window frames.

Clerestory windows occurring in external walls to clerestorys are included in this element.

ED EXTERNAL DOORS – The access ways into the building both for pedestrians and vehicles.

It INCLUDES frames; linings; glazing; architraves; hardware; panels and highlights over; flydoors; roller shutters; garage doors; fire doors; grille and chain wire doors; gates; service cupboard doors and thresholds; decoration.

It EXCLUDES frames forming an integral part of the wire mesh or glazed screen walls (EW); lintels and flashings (EW); under floor access doors (SB); framing and glazing to sidelights to doors with or without highlights (EW).

Academic / Assignment Report Help

INTERNAL FABRIC

NW INTERNAL WALLS – Permanent division of internal spaces into separate rooms or to enclose duct and other non-usable areas.

It INCLUDES walls; internal columns and isolated piers to non-framed (load bearing) structures; lintels, damp courses and bearing strips; stiffening beams not integral with floor, ceiling or roof slabs; part height solid walls glazed over to ceiling; unducted air-flow grilles; fire walls and smoke screens.

It EXCLUDES “Internal Screens and Borrowed Light” (NS); wall finishes (WF); works in “Roof” (RF) and “Substructure” (SB); part height solid walls (NS); fireplaces, hearths, flues and stacks (SH, SS); beams integral with slabs (UF, RF).

Note: Part height solid walls are screens (by definition) and included in element NS.

NS INTERNAL SCREENS AND BORROWED LIGHTS – To screen off or temporarily divide internal spaces into separate compartments and to allow the transfer of light through “Internal Walls”.

It INCLUDES proprietary type office partitioning; glazed screens; internal shop fronts; fold away and operable walls; overhead frameworks and supporting beams; chain wire and grille screens; toilet partitions and screen walls; borrowed lights; balustrades and rails not associated with staircases; all finishes and decorations.

It EXCLUDES all doors (ND); counters and wall hatches (FT).

ND INTERNAL DOORS – Passage ways through “Internal Walls” internal screens and partitions and to provide access to service cupboards and ducts.

It INCLUDES frames; linings; glazing; architraves; pelmets; hardware and door grilles; chain wire and grille doors; toilet doors; cell and strong room doors; fire doors; roller shutters; service cupboard doors; duct access panels; fanlights and panels over and linings to blank openings; decoration.

It EXCLUDES frames forming integral parts of demountable, wire mesh or glazed screens, etc (NS); lintels (NW); framing and glazing to sidelights to doors (NS).

INTERNAL FINISHES

Note: Re – Finishes Generally:

Where a finish incorporates a special type of formwork, only that cost which is extra over the cost of rough formwork is to be included in the finish. The rough formwork cost is part of the structure.

WF WALL FINISHES – To finish and decorate all interior faces of “Columns”, “External Walls” and “Internal Walls”.

Academic / Assignment Report Help

It INCLUDES finishes to internal faces of external walls and columns; acoustic wall linings; extra costs involved for face bricks, face and coloured blocks and off form concrete; splashbacks, dados and regulation wall vents.

It EXCLUDES finishes to “Internal Screens and Borrowed Lights” (NS); skirtings (FF) and cornices (CF); all external finishes to external walls and columns (EW); finishes to both sides of external screens (EW); all protective non-decorative coatings.

Note: Finishes to “Internal Screens and Borrowed Lights” (NS) are included in that element.

Finishes to internal faces of external screens, etc are included with the relevant sub-elements in “External Walls” (EW).

FF FLOOR FINISHES – To provide a satisfactory finish to “Upper Floors” and “Substructure” for walking on.

It INCLUDES all preparatory work and finishing; balcony floor finishes; skirtings; screeds; timber floor finishes; dividing strips; mats and matwells; duct and pit cover; carpeting used as a permanent floor finish; timber and other finishes to concrete floors; finishes to steps in the one floor level.

It EXCLUDES structural screeds and toppings (SB, UF); landing and stair finishes (SC); trafficable roof covering (RF); timber framed floors (UF, SB); finishes to external thresholds (ED); door sills (ED, ND).

Note: Element includes all floor finishes to areas measured in the “Gross Floor Area” (GFA).

CF CEILING FINISHES – To finish and decorate all internal soffits of “Upper Floors” and “Roof” over rooms and external soffits over unenclosed covered areas.

It INCLUDES preparatory work; suspended false ceilings; proprietary suspended ceiling systems; acoustic ceiling linings; extra costs involved for off form concrete; linings to roof lights; ceiling manholes; framing to bulkheads and cornices.

It EXCLUDES eaves soffits (RF); stair and landing soffits (SC); ceiling joists where not suspended (UF, RF); soffits of projecting overhangs (EW); all protective non-decorative coatings (UF, SC, RF); air conditioning grilles (AC).

FITTINGS

FT FITMENTS – To fit out the building with built-up fitments and fixed items included in the main contract.

It INCLUDES benches; cupboards; shelving; racks; seats; counters; chalkboards; notice boards, signs and name plates; coat rails and hooks; mirrors; wall hatches; daises and stages.

It EXCLUDES loose furniture and furnishings (YY); curtains and blinds (WW); “Special Equipment” (SE); “Internal Screens and Borrowed Lights” (NS).

SE SPECIAL EQUIPMENT – To provide items of equipment of unitary, commercially available type and/or of a type not covered by other elements.

It INCLUDES window cleaning, gymnasium, mortuary and photographic equipment; audio-visual aids; laboratory, laundry, kitchen and central sterile services department (C.S.S.D) type equipment; dental and workshop equipment; boiling water units; sink heaters; laboratory stills; special blackout facilities; bed pan washers; linen and refuse disposal equipment; refrigerators and refrigerated drinking water coolers; incinerators; sanitary macerators; circulating fans; all cold, hot, gas and other valves and cocks, controls, electric wiring and piping integral with this equipment; specified Builders work in connection with this equipment.

It EXCLUDES cool rooms and process cooling, incineration plant of custom design of built-up type, and other “Special Services” (SS) or “External Special Services” (XS); loose equipment not covered in the main contract (YY); fire fighting equipment (FP); “Sanitary Fixtures” (SF); refrigeration plant associated with air conditioning (AC).

Academic / Assignment Report Help

SERVICES

SF SANITARY FIXTURES – To fit out the building with normal fixtures connected to the soil and waste plumbing systems and all associated ancillaries.

It INCLUDES W.C. suites; urinals; basins; sinks and tubs; troughs and runnels; drinking fountains; slop hoppers; showers; hobs; shower curtains and trays; terminals outlets integral with fixtures; flusherette valves; soap and toilet paper holders; towel rails and hand driers.

It EXCLUDES sanitary macerators, bed pan washers, kitchen, laundry and sterilising equipment and refrigerated drinking water coolers (SE); sanitary incinerators (SS); floor wastes and all loose traps (PD); terminal outlets not integral with fixtures (WS).

PD SANITARY PLUMBING – The disposal of all waste and soiled water from fixtures and equipment out to the external face of external walls.

It INCLUDES stacks and vents; all loose traps; floor wastes; internal sewer drainage runs, pumps and ejectors; acid resisting pipes and drains; box ducting and paintwork.

It EXCLUDES rainwater disposal systems (RF); incinerator flues (SE, SS, XS); duct access panels (ND).

WS WATER SUPPLY – Systems to supply water from point of building entry to the points of consumption. The water may be at ambient temperature, heated or cooled and may be treated by clarification, filtration, softening, de-mineralisation, distillation, desalination or other means. The water may be supplied from town mains, bores, rivers, lakes, rainwater tanks, centralised energy systems or other sources.

It INCLUDES storage tanks; pumps; water treatment plants; water heaters and coolers; reticulation pipework including pipeline components; terminal outlets not integral with fixtures and/or equipment; controls other than those associated with water consuming items of equipment; box ducting; insulation; sheathing; painting and identification; building and electrical work forming part of the Contract for water supply.

It EXCLUDES meters, extensions and connections to town mains or other sources (XW); self-contained unitary equipment such as boiling water units, sink heaters and laboratory stills (SE).

GS GAS SERVICES – To supply town, natural, simulated natural and liquified petroleum gas from point of building entry to points of consumption. The gas may be supplied from town mains, storage cylinders, bulk storage tanks or other sources.

It INCLUDES portable gas cylinders; booster compressors; manifolds and regulators; box ducting, painting and identification; building and electrical work forming part of the gas services element; reticulation pipework and pipeline components; terminal outlets not integral with fixtures and/or equipment; gas detection systems.

It EXCLUDES outlet cocks integral with appliances (SE); hot water heaters (SE, WS); space heaters (SH) and other like equipment; meters and extensions and connections to town mains or other sources (XG).

Note: Gas appliances forming part of an air conditioning, space heating water supply system or other system should be included under the appropriate element.

Gas controls, valves, regulators and other pipelines components directly associated with gas fired equipment should be included under the element appropriate to the gas fired equipment.

SH SPACE HEATING – To heat the interior of buildings by means of convection, radiation or any other form of heating.

It INCLUDES unitary heaters; reticulated steam, hot water or hot oil systems; warm air systems; electric floor or ceiling heating systems; fireplaces, hearths and associated work in chimney stacks; boiler plant installed within the heated building and servicing only element (SH) in that building; insulation and painting; controls and associated electrical work.

It EXCLUDES any system which also provides air cooling (“Air Conditioning” (AC) or “Evaporative Cooling” (EC).

Note: Boiler plant and pipe reticulation located outside the building served and serving multiple buildings, or serving other elements such as AC or WS to be included under “Centralised Energy Systems” (CE).

Gas storage and reticulation systems to be included under “External Gas” (XG) if located outside the building served or if serving other elements, or “Gas Service” (GS) if located within the building served, otherwise to be included in SH.

Electric cabling terminates at junction with “Electric Light and Power” (LP).

Controls and electric wiring integral with equipment items to be included with those items.

Academic / Assignment Report Help

VE VENTILATION – To ventilate buildings by means of supply and/or exhaust systems.

It INCLUDES mechanical ventilators; non-mechanical roof ventilators; supply and/or exhaust fans; ducted systems; exhaust hoods; ducting, plant, controls and associated electrical work.

It EXCLUDES any system which also involves heating (SH); “Air-conditioning” (AC); “Evaporative Cooling” (EC); circulating fans (SE); regulation wall vents (WF); door grilles (ND); plant room air flow screens (EW); louvred windows (WW).

Note: Dust extraction to be included under “Special Services” (SS).

Electric cabling terminates at junction with “Electric Light and Power” (LP).

EC EVAPORATIVE COOLING – To cool air within a building by evaporative processes; the system can include ancillary heating.

It INCLUDES evaporative coolers, rock bed regenerative systems and ancillary heating devices; ducting, insulation, painting and associated electrical work.

It EXCLUDES door grilles (ND); “Air Conditioning” (AC); systems which heat (SH) and/or ventilate (VE) only.

Note: Air relief grilles in doors and walls to be included under respective building element.

Electric cabling terminates at junction with “Electric Light and Power” (LP).

AC AIR-CONDITIONING – To maintain and control temperature, humidity and quality of air within predetermined limits within buildings.

It INCLUDES package air conditioners; systems for cooling only; ductwork, plant, controls and associated electrical work; air conditioning grilles.

It EXCLUDES door grilles (ND) and systems which heat (SH) and/or ventilate (VE) only; special cool rooms (SS); special hot rooms (SS); “Evaporative Cooling” (EC).

FP FIRE PROTECTION – To detect and/or extinguish fires.

It INCLUDES sprinklers and other automatic extinguishing systems; fire indicator board; manual and automatic fire alarm installations; fire fighting equipment; hydrant installations and hose reels and cupboards; hand appliances.

It EXCLUDES fire doors (ED, ND); fire proofing (CL, UF, RF, WF, CF, etc).

Academic / Assignment Report Help

LP ELECTRIC LIGHT AND POWER – To provide all light and power and emergency light and power from and including main distribution board to and including power outlets and light fittings.

It INCLUDES main distribution board; sub-mains and distribution boards; emergency lighting systems; power sub-mains to mechanical equipment and sub-mains and/or sub-circuits to other equipment and/or final sub-circuits.

It EXCLUDES other electrical installations listed under other elements such as “Special Services” (SS); “Communications” (CM) and “Centralised Energy Systems” (CE).

*Where the main switchboard supplies only building, it shall be

considered as a main distribution board.

CM COMMUNICATIONS – To provide audio and video communication within a building.

It INCLUDES the following systems – Telecom telephone, internal telephone, public address, call, emergency warning and intercommunication, personal paging, clock and/or bell, TV antenna and closed circuit TV.

It EXCLUDES document hoists and conveyor system (TS); cables between buildings (XC).

Note: Document hoists and conveyor system to be included in TS. cables between buildings to be included in XC.

PABX telephone systems installed and funded separately from the building contract should be included under YY “Other Items”.

TS TRANSPORTATION SYSTEMS – To transport personnel and/or goods from floor to floor or area to area.

It INCLUDES all lifts, hoists and conveyor systems; escalators; all associated equipment and work other than structural building work.

It EXCLUDES such items as walls to shafts and lift wells and machine rooms (EW, WW).

SS SPECIAL SERVICES – To provide services or installations not covered by other elements.

It INCLUDES monitoring systems; cool rooms and process cooling; special conditioned rooms; staircase pressurisation systems; compressed air; medical and industrial gas systems; dust extraction systems; security systems; lightning protection; stage lighting and theatre equipment; reticulated soap dispenser systems; laundry, heat and water reclaim systems and the like.

It EXCLUDES equipment items (SE); communication services (CM).

Academic / Assignment Report Help

CENTRALISED ENERGY SYSTEMS

CE CENTRALISED ENERGY SYSTEMS – To produce and supply steam, heating, hot water, chilled water and/or other cooling or heating media and/or site generated electrical energy to a number of buildings and/or to multiple energy consuming elements.

It INCLUDES the piping reticulation within central plant room or plant house and up to branch off-takes to energy consuming functional elements; sections of the main piping reticulation running to, within or through buildings served; cabling within the central plant room or house and all work which forms part of the energy system element; buildings to house such plant, service tunnels, ducts and/or conduits.

It EXCLUDES emergency generating plant and cabling from central switchboard to other buildings (XE).

Note: Interfaces between element CE and other elements are those points where branches serve single elemental systems or where branches leave common mains within buildings to serve single elemental systems.

Centralised Energy Systems may range from very large boiler and/or chiller and/or electrical generating plants serving large and complex sites such as airports, major hospitals, universities or colleges to small boiler installations supplying energy to say space heating and domestic hot water systems in relatively small single buildings such as school classroom blocks, pavilion type hospital wards and so on.

Where energy generators supply the whole of their production to one functional system only and are contained within the alignment of the building served they are to be considered as part of that functional system.

Engineering systems serving the central plant room or plant house are to be included under appropriate elements for the building housing the centralised energy plant.

ALTERATIONS

AR ALTERATIONS AND RENOVATIONS – To alter or renovate any existing building including works to the substructure, finishes, fittings and internal services.

It INCLUDES work in connecting a new building to an existing; redecorations; refitting out and all mechanical and electrical services in connection therewith; underpinning to existing buildings for alteration works.

It EXCLUDES complete demolitions of existing buildings, site clearance and removal of any paving, fences and outbuildings (XP); alterations and renovations to external services and site works (XX); any work involved in connecting new services to old in existing buildings (XW, XG, XE, etc)

SITE WORKS

XP SITE PREPARATION – All basic work necessary prior to proceeding with buildings and external works.

It INCLUDES demolitions; site clearance; general levelling and filling; hoardings; retaining walls; removal of any paving, fences, trees and services; temporary diversions of services; underpinning to adjacent buildings.

It EXCLUDES alterations and permanent diversion of services (XX); alterations to buildings (AR) and existing site works (XX); any work involved in permanent connections of new services to existing (XW, XG, XE, etc)

XR ROADS FOOTPATHS AND PAVED AREAS – Trafficable areas between and around buildings (outside “Fully Enclosed Covered Areas” and “Unenclosed Covered Areas” as defined, outbuildings, etc) for vehicles and pedestrians.

It INCLUDES car parks; playgrounds; kerbs; crossovers; bollards; steps and associated balustrades; weed poisoning.

It EXCLUDES uncovered bridge links (XB); sports pitches, lawns, site landscaping and improvements (XL); cut and fill (XP).

XN BOUNDARY WALLS, FENCING AND GATES – To enclose or define the extent of the site.

It INCLUDES all walls, fences and gates at the site boundary.

It EXCLUDES all walls, fences and gates that subdivide the site (XL); all retaining walls (XP).

XB OUTBUILDING AND COVERED WAYS – To provide small buildings supplementary to the main buildings(s) and covered areas or bridge links for pedestrian or vehicular site circulation.

It INCLUDES detached covered ways not alongside buildings; garages; bicycle sheds; incinerator buildings; residential and gatekeepers cottages; garbage shelters; workshops; chapels; stores; sheds; stair blocks; all electrical, mechanical and other services in connection therewith.

It EXCLUDES attached covered ways alongside buildings; boiler and plant houses (CE); water towers (XW); gas meter (XG) and water meter (XW) shelters; pump houses (XW), substations (XE) and similar engineering services buildings.

XL LANDSCAPING AND IMPROVEMENTS – To improve the appearance of the site and provide incidental site facilities for the use of the occupants.

It INCLUDES grassing and turfing; garden plots and planting; trees, screen, dwarf, play and entrance walls; seats; fountains; petrol bowsers (pumps) and tanks; sculptures; flagpoles; signs and notices; cricket nets and basketball posts; sports pitches and goal posts; open air swimming pools.

It EXCLUDES paving (XR); site clearance (XP); “Boundary Walls, Fencing and Gates” (XN); walls required to retain the site (XP)

Academic / Assignment Report Help

EXTERNAL SERVICES

XK EXTERNAL STORMWATER DRAINAGE – To dispose of rain and surface water from the site.

It INCLUDES pipe runs from the external face of buildings; inspection pits; sumps; road gullies; culverts; box drains; grated trenches; runs from pools and fountains; outfalls and head walls; agricultural and sub-soil drains; connections to existing runs and pits.

It EXCLUDES pipe runs, pits, etc under buildings from internal downpipes (RF); road gutters (XR); temporary drainage as site preparation (XP); diversions to existing runs (XX).

XD EXTERNAL SEWER DRAINAGE – To dispose of soil and waste water from the site.

It INCLUDES pipe runs from the external face of buildings; grease gullies; inspection pits and manholes; acid resisting and special drains; dilution pits; petrol and plaster arrestors; septic tanks; collection and holding wells; absorption trenches; transpiration areas; pumps and ejectors; connections to existing runs, pits and mains.

It EXCLUDES pipe runs, pits, etc beneath buildings (PD); diversions to existing runs (XX).

Academic / Assignment Report Help

XW EXTERNAL WATER SUPPLY – Systems to supply water up to the external faces of new buildings and up to other major consuming points such as swimming pools, fountains, artificial ponds, irrigation and ground watering outlets. The water may be at ambient temperature, heated or cooled and may be treated by clarification, filtration, softening, demineralisation, distillation, desalination or other means. The water may be supplied from town mains, bores, rivers, lakes, rainwater tanks, centralised energy systems or other sources.

It INCLUDES storage tanks; water towers; pumps; water treatment plants; water heaters and coolers; reticulation pipework including pipeline components; terminal outlets not integral with fixtures and/or equipment; insulation; sheathing; painting and identification; meters and meter enclosures included under the contract; water bores; irrigation and ground watering systems; building and electrical work forming part of this element.

It EXCLUDES diversion to existing runs (XX).

XG EXTERNAL GAS – To supply town, natural, simulated natural and liquified petroleum gas up the external faces of new buildings and other consuming points. The gas may be supplied from town mains, storage cylinders, bulk storage tanks or other sources.

It INCLUDES storage cylinders and tanks, meters and regulators forming part of the contract; meter enclosures; reticulation pipework and pipeline components; building and electrical work forming part of the external gas supply Contract.

It EXCLUDES diversions to existing runs (XX).

XF EXTERNAL FIRE PROTECTION – To supply fire hydrant and gas or vapourising agent runs up to external faces of new buildings, external sprinkler systems, and for site connections and connection of fire detection systems between buildings. Also to detect and/or extinguish fires in fixed plant or equipment located in the open air.

It INCLUDES standby and booster pumps; pipe runs; storage and reticulation of gas and vapourising agents; hydrant points; overhead and underground cables and fire detection systems.

It EXCLUDES trenches for cabling (XE).

XE EXTERNAL ELECTRIC LIGHT AND POWER – To supply electric power to main distribution boards of buildings and to provide lighting and power to external site areas.

It INCLUDES connections to source of power supply; consumers mains; substation equipment; emergency generating plant; main switchboard, under-ground and overhead cables; pylons and all trenches for cabling; street and area lighting; illuminated signs and building flood lighting.

It EXCLUDES communications cables (XC); work to existing electrical work (XX).

Note: Communications cables to be included in XC.

Fire Alarm cables to be included in XF.

* Where the main switchboard supplies only one building, it shall be considered as a main distribution board and included in LP.

XC EXTERNAL COMMUNICATIONS – To provide external communication cables to terminating frames of buildings and to provide communication systems between buildings and to external site areas.

It INCLUDES Telecom Australia work; underground and overhead cables; pylons; connections to existing cables; external speakers; hooters; clocks; bells; closed circuit TV; community antenna systems.

It EXCLUDES trenches for cabling (XE).

Academic / Assignment Report Help

XS EXTERNAL SPECIAL SERVICES – To provide external service or installations not included in other elements.

It INCLUDES external connections to items included in “Special Services” (SS); service tunnels, ducts and conduits in connection with external reticulation of Services elements; dust extraction plant; incineration plant; bulk storage for medical and industrial gases.

EXTERNAL ALTERATIONS

XX EXTERNAL ALTERATIONS AND RENOVATIONS – To alter or renovate any existing site works and external services.

It INCLUDES resurfacing paved and grassed areas; renovating outbuildings; renewing fencing and gates; permanent diversion of drainage, cold water and other external service runs.

It EXCLUDES renovating existing buildings (AR).

SPECIAL PROVISIONS

YY – PF SPECIAL PROVISIONS – Items not included in the Net Project Cost but which need to be included to make up the Gross Project Cost.

Note: These items must be estimated by the project Cost Planner in consultation with the Client and the Project Manager.

ET ESCALATION TO TENDER – An appropriate allowance for future cost increases from the date of estimate to the anticipated tender date.

Academic / Assignment Report Help

Order Now
Universal Assignment (November 21, 2026) Academic / Assignment Report Help. Retrieved from https://universalassignment.com/academic-assignment-report-help/.
"Academic / Assignment Report Help." Universal Assignment - November 21, 2026, https://universalassignment.com/academic-assignment-report-help/
Universal Assignment November 21, 2026 Academic / Assignment Report Help., viewed November 21, 2026,<https://universalassignment.com/academic-assignment-report-help/>
Universal Assignment - Academic / Assignment Report Help. [Internet]. [Accessed November 21, 2026]. Available from: https://universalassignment.com/academic-assignment-report-help/
"Academic / Assignment Report Help." Universal Assignment - Accessed November 21, 2026. https://universalassignment.com/academic-assignment-report-help/
"Academic / Assignment Report Help." Universal Assignment [Online]. Available: https://universalassignment.com/academic-assignment-report-help/. [Accessed: November 21, 2026]

Please note along with our service, we will provide you with the following deliverables:

Please do not hesitate to put forward any queries regarding the service provision.

We look forward to having you on board with us.

Most Frequent Questions & Answers

Universal Assignment Services is the best place to get help in your all kind of assignment help. We have 172+ experts available, who can help you to get HD+ grades. We also provide Free Plag report, Free Revisions,Best Price in the industry guaranteed.

We provide all kinds of assignmednt help, Report writing, Essay Writing, Dissertations, Thesis writing, Research Proposal, Research Report, Home work help, Question Answers help, Case studies, mathematical and Statistical tasks, Website development, Android application, Resume/CV writing, SOP(Statement of Purpose) Writing, Blog/Article, Poster making and so on.

We are available round the clock, 24X7, 365 days. You can appach us to our Whatsapp number +1 (613)778 8542 or email to info@universalassignment.com . We provide Free revision policy, if you need and revisions to be done on the task, we will do the same for you as soon as possible.

We provide services mainly to all major institutes and Universities in Australia, Canada, China, Malaysia, India, South Africa, New Zealand, Singapore, the United Arab Emirates, the United Kingdom, and the United States.

We provide lucrative discounts from 28% to 70% as per the wordcount, Technicality, Deadline and the number of your previous assignments done with us.

After your assignment request our team will check and update you the best suitable service for you alongwith the charges for the task. After confirmation and payment team will start the work and provide the task as per the deadline.

Yes, we will provide Plagirism free task and a free turnitin report along with the task without any extra cost.

No, if the main requirement is same, you don’t have to pay any additional amount. But it there is a additional requirement, then you have to pay the balance amount in order to get the revised solution.

The Fees are as minimum as $10 per page(1 page=250 words) and in case of a big task, we provide huge discounts.

We accept all the major Credit and Debit Cards for the payment. We do accept Paypal also.

Popular Assignments

Developing Asia-Pacific Nations Assignment Help

A Survey Assessment 1  Assessment Overview A survey of key features of strategies used by chosen developing Asia-Pacific nations.    1000-1250 words  30% Session 3 Developing Asia-Pacific Nations Assignment Help  Details Choose a middle or upper income country in Asia or Pacific. Examine from the UNDP’s HDI index  between the years 2000 and 2018 for the chosen

Read More »

Marketing a property for lease: Assignment Help

Points to note: Marketing a property for lease: Assignment Help Task 1: Prepare a marketing plan In this part of your Workplace Project, you are to prepare a marketing plan for a property for lease. You must use the template provided to create your marketing plan. Your marketing plan must

Read More »

Academic & Formal Assignment Help

 Assessment Overview This assessment involves writing a reflective journal capturing your learning experience as you carry out assigned tasks and roles. It is not just a record of what you do at the workplace, but a discussion of skills, practices, and tools you have learned in relation to the learning

Read More »

Science Communication Blog Post Assignment Help

Your TaskAssessment 4 (the end-of-semester assignment) assesses concepts from across Weeks 1 to 12. Throughout these weekly modules, you have completed individual tasks and collaboratively explored (on Ed Discussion) the process and methods of science. These activities will help prepare you to complete the end-of-semester assignment below. Purpose 🎯In this

Read More »

Planning and Learning in Early Childhood Education Assignment Help

Planning and Learning in Early Childhood Education Assignment Help Here is the combined text transcribed from the two screenshots of Assessment 1, arranged in reading order from top to bottom: 1. Assessment 1 Overview Programming (40%) (1500 words) Step 1: Designing your learning experiencesFor this assessment task, you will use

Read More »

Learning Development Presentation Assignment Help

1. Assessment 2 Overview Individual/Group Presentation (30%) (10 min/1500 words). Due: Week Learning Development Presentation Assignment Help Individually or as a small group (2 or 3 participants) imagine you have been asked to present an professional development session to your colleagues in an Early Childhood Service on the EYLFV2.0 assessment

Read More »

Critical Evaluation of Mental Health

Assessment Brief: Subject: Mental Health in Practice Assessment Task: Critical evaluation of an AI-generated supportive conversation script – Written critique Length 2500 words (+/- 10) Appendix: Screenshot Generative AI script (not included in the word count) Due date: 06/11/2026 @8pm Melbourne Time Assessment Task In this assessment, you will create

Read More »

The Climate Crisis in Asia: Who Pays the Price? Assignment Help

A response to debatable and controversial socio-cultural, political and environmental issues confronting a specific country or countries in Asia or the Pacific.  5–8-minute presentation with supporting resources including: Part A) an interactive poster and Part B) an individual report (500 words) Part A 25%Part B 10% 35% Session 7 & 9  Details Choose

Read More »

ATC401A Advanced Therapeutic Communication Assignment Help

ATC401_Assessment 3_15072026 Page 1 ofASSESSMENT 3 BRIEF Subject Code and TitleATC401 Advanced Therapeutic Communication AssessmentCase Study (Report) Individual/GroupIndividual Length2500 +/- 10% Learning OutcomesThe Subject Learning Outcomes demonstrated by successful completion of the task below include:SLO b), SLO e), SLO f) SubmissionDue by 11:55pm AEST Sunday end of Module 11 (Week

Read More »

ATC401A Advanced Therapeutic Communication Assignment Help

ATC401A Advanced Therapeutic Communication Assignment Help ATC401_Assessment 3_15072026 Page 1 ofASSESSMENT 3 BRIEF Subject Code and TitleATC401 Advanced Therapeutic Communication AssessmentCase Study (Report) Individual/GroupIndividual Length2500 +/- 10% Learning OutcomesThe Subject Learning Outcomes demonstrated by successful completion of the task below include:SLO b), SLO e), SLO f) SubmissionDue by 11:55pm AEST

Read More »

ATC401A Advanced Therapeutic Communication Assignment Help

ATC401_Assessment 2_20240603 Page 1 of 10ASSESSMENT 2 BRIEF Subject Code and TitleATC401A Advanced Therapeutic Communication AssessmentReflective Journal Individual/GroupIndividual Length2000 words +/- 10% Learning OutcomesThe Subject Learning Outcomes demonstrated by successful completion of the task below include: SLO a), SLO b), SLO c), SLO d), SLO e) SubmissionDue by 11:55pm AEST

Read More »

ATC401 Advanced Therapeutic Communication Assignment Help

ATC401_Assessment_1_ DueModule_6_17062026 Page 1 of 9three ASSESSMENT 1 BRIEF Subject Code and TitleATC401 Advanced Therapeutic Communication AssessmentDemonstration and Reflection Individual/GroupIndividual Length5 minutes and 500 words +/- 10% Learning OutcomesThe Subject Learning Outcomes demonstrated by successful completion of the task below include:SLO a), SLO b), SLO c), SLO d) SubmissionDue by

Read More »

Laura Medical Case Study Assignment Help

Laura Ash, 65 years old, was brought by her son, Jack, a 40-year-old gentleman, to the local ED at 23:00 hrs. Jack described his mom to the ED nurses as having abdominal pain this morning. Still, the pain progressively worsened throughout the day, even though she took two tablets of

Read More »

HOS302 Managing Customer Experience and Ethical Practice Assignment help

 HOS302 Managing Customer Experience and Ethical Practice  Assessment 1 – Individual Assessment: Guest Experience  Submission Deadline: Sunday, XX November XXXX, at 11:59 pm (Week 5)  Assessment Weighting: 25%  Overview of this Assignment  Students will describe a recent customer experience they have had in the hospitality sector and identify strategies for

Read More »

Preschool Weekly Curriculum Plan Assignment Help

Learning Intentions – Individual child Interest/Group Interests/Short term goals for learning/Long term goals for learning Link to Service Philosophy and EYLF Learning Outcomes/ Teacher Standards/UN Convention on the Rights of the Child. 1. 2. 3.     (Include link to EYLF outcomes that reflect this week’s learning intentions and/or the

Read More »
Discursive Writing Essay:
Uncategorized
prashantsinha567@gmail.com

Discursive Writing Essay: Complete Guide to Structure, Format & Tips

Introduction Discursive writing is a form of academic writing that explores an issue from different perspectives before reaching a balanced and reasoned conclusion. A discursive essay does not simply tell the reader what the writer believes. Instead, it examines relevant viewpoints, considers supporting evidence, acknowledges opposing ideas, and evaluates the

Read More »

Assessment 1

Helpful Tools for ReflectionDuring the reflective journal process, you may wish to use these helpful templates and decision wheel tools to consolidate thoughts and ideas.Regardless of which framework is chosen, all areas of reflection are to be attempted to complete the full reflective cycle. It is important that any template,

Read More »

Professional Nursing Assignment Help for Students: Achieve Academic Excellence with Expert Support

Introduction Nursing is a demanding field that combines theoretical knowledge with practical skills. Students pursuing nursing courses often face challenges in completing assignments that require accuracy, critical thinking, and real-world application. This is where nursing assignment help becomes an essential academic support system. With increasing academic pressure and clinical responsibilities,

Read More »

Economics Assignment Help: A Complete Guide for Students

Introduction Economics is a fundamental subject that helps students understand how markets, governments, and individuals make decisions regarding resources. While it is highly relevant in today’s world, many students find economics assignments challenging due to complex theories, graphs, and data analysis. This is where economics assignment help becomes extremely useful.

Read More »

Law Assignment Help: A Complete Guide for Students

Introduction Law is a complex and intellectually demanding field that requires critical thinking, analytical skills, and a deep understanding of legal principles. Students pursuing law often face challenges in completing assignments due to extensive research requirements and intricate case analysis. This is where law assignment help becomes highly beneficial. With

Read More »

Can't Find Your Assignment?