
Student ID: | Surname: | First Name: | |
Course Name: | Bachelor of Engineering Technology Civil | ||
Subject Code: | BET407 | Subject Name: | Integrated Management Systems |
Lecturer’s Name: | Nomer Angeles | ||
Assessment Title: | Group Report and Presentation: Critical examination and report on a specific management case | ||
Due Date: | 25/10/2022 (Week 13) | Date submitted: | |
Definitions: | Academic Fraud Form of misconduct that enables a student(s) to obtain an unfair academic or general advantage through false representation. Cheating Behaviour which is engaged in by a student or another person on behalf of a student (and / or students or persons acting in collusion) to provide that student or group of students with an academic advantage to which that student or group of students is not entitled. Plagiarism The use of all or part of another person or entity’s work without appropriate acknowledgment of the author or source. Collusion Agreement between individuals (students / other persons) to act together secretly or without permission to achieve an unfair advantage. Refer to the HigherEducation Academic Integrity Policy and Institute Rule: Student Discipline Rule for further information. | ||
Privacy Statement: | The information on this form is collected for the primary purpose of assessing your assignment. Other purposes of collection include recording your plagiarism and collusion declaration, attending to administrative matters and statistical analyses. You have a right to access personal information that Melbourne Polytechnic holds about you, subject to any exceptions in relevant legislation. Refer to the Student Privacy Statement. | ||
Late Submission: | Assessment items submitted after the due date without an approved extension and / or special consideration will be penalised 5% per day off the mark awarded for a total of ten (10) working days. If the item is submitted after this time or not submitted, the item will not be marked and a fail grade awarded. Higher Education Assessment Policy P/HE/D/3/040 Section 9. Submission of Assessment. | ||
Student Declaration: | I understand that: If there is any doubt as to the authenticity of any piece of my assessment then I can be orally examined. Assignments without cover sheets will not be marked.Cheating, plagiarism and other acts of academic misconduct are subject to Melbourne Polytechnic disciplinary action. Penalties apply for late submission of assessment and that this could result in a fail grade being awarded. | ||
Student Signature: | Date: | ||
Assignment Receipt If you require a receipt for your assignment please complete the section below and have it signed/stamped at the Department Office. |
Student Name: Student Id: |
Subject: |
Assessment Title: |
Group Report and Presentation
Scenario :
You have recently graduated and got a job in a newly formed civil construction company which provides services for civil infrastructure construction of land development projects. The company has won a project for the civil infrastructure works for new housing estates in four growth areas of Metropolitan Melbourne which are Whittlesea Council, Hume Council, Melton Council and Wyndham Council. This project package is in separate sites across the four growth areas.
The project scope is constructing the road network and the water network. The road network will include local residential streets, collector roads, arterial roads with necessary features and facilities like kerb and channel, individual lots access/driveway, footpaths, bus stops, bicycle lanes, street lights, etc. The water network will comprise the water mains, drainage and sewer channels (i.e. from individual house lots to housing subdivision main pipes for drainage and sewer, etc.).
These growth areas are the places mostly chosen by young families and new migrants deciding to reside in Melbourne. Some of them are located on previous agricultural areas and a few are sitting on areas with potential aboriginal and indigenous sensitive areas and listed flora and fauna.
A common characteristic is that because they are on the outer suburban areas of Melbourne, they do not have good public transport facilities and connectivity such as trains and buses.
The client specified that you have to adhere to water sensitive urban design guidelines, and smart and sustainable practices for road construction.
You along with other (i.e. 2 to 3) fresh graduate engineers have been assigned to prepare an Integrated Management Systems (IMS) manual that can be used for these multi-site projects.
The manual should accommodate all relevant concerns (quality, safety, environment, etc.) and action plans to achieve those.
You have to complete this manual by Tuesday, 25 October 2022 (Week 13) and present the outcomes to your management group.
Note: Use the following High Level Structure/Critical examination and report outline
Scope
Normative References
Terms and definitions
4.0 Context of the organisation’
5.0 Leadership
6.0 Planning
7.0 Support
8.0 Operation
9.0 Performance Evaluation
10. Improvement

Get expert help for Critical examination and report and many more. 24X7 help, plag free solution. Order online now!