Develop a work breakdown structure (WBS)

Develop a work breakdown structure

Instructions  | Part 2 |

  1. Develop a work breakdown structure (WBS) using the WBS Template [DOWNLOAD].
    • Order the tasks using logical phases. 
    • Number the tasks with an ID number to be used for the predecessor assignments.
  2. Using the WBS that you just developed, create the project schedule.
    •  Assign resources to tasks. 
    • Assign task predecessors. 
  3. Analyze and determine the project’s critical path.
    • Highlight the tasks on the critical path in yellow. 
  4. Using the WBS, develop the project budget.
    • Include a “Total” line at the bottom of the sheet to show the total budget. 
  5. Submit your WBS spreadsheet.

REQUIREMENTS

  • Development of a work breakdown structure (WBS)
  • Development of the project schedule
    • Assignment of resources to tasks
    • Assignment of task predecessors
  • Analysis of the project’s critical path
  • Development of the project budget
  • Completed WBS, Schedule, and Budget
  • Completed Critical Path (to be created in the “Gantt Chart” section of your “WBS_GANTT_template)
  • Completed written analysis in complete APA formatting
  • Citation requirements: 3 authoritative sources

Top of Form

Bottom of Form

Submission status / Rubrics

Grading criteria

WBS, Schedule, and Budget (see rubric in Syllabus for evaluation guidelines) Beginning (0-41); Developing (42-47); Accomplished (48-53); Exemplary (54-60) Comprehensively details a task list that is compiled into logical phases with appropriate task IDs, milestones, schedule, and budget Maximum score 60
Critical Path (see rubric in Syllabus for evaluation guidelines) Beginning (0-27); Developing (28-31); Accomplished (32-35); Exemplary (36-40) The critical path is correctly identified and highlighted appropriately. Maximum score 40
Content Development (see rubric in Syllabus for evaluation guidelines) Beginning (0-27); Developing (28-31); Accomplished (32-35); Exemplary (36-40) Uses appropriate, relevant, and compelling content to illustrate mastery of the subject, conveying the writer’s understanding, and shaping the whole work. Maximum score 40
Analysis (see rubric in Syllabus for evaluation guidelines) Beginning (0-27); Developing (28-31); Accomplished (32-35); Exemplary (36-40) Organizes and synthesizes evidence to reveal insightful patterns, differences, or similarities related to focus. Maximum score 40
Control of Syntax, Mechanics, and APA Format (see rubric in Syllabus for evaluation guidelines) Beginning (0-13); Developing (14-15); Accomplished (16-17); Exemplary (18-20) Uses collegiate-level language that communicates meaning to readers with clarity and fluency, and is virtually error-free. Rarely makes errors in grammar, spelling, and other aspects of writing and referencing. Consistently applies APA formatting when necessary and includes a complete reference list of works cited. Maximum score 20
Order Now

Get expert help for Develop a work breakdown structure and many more. 24X7 help, plag free solution. Order online now!

Universal Assignment (March 12, 2026) Develop a work breakdown structure (WBS). Retrieved from https://universalassignment.com/develop-a-work-breakdown-structure-wbs/.
"Develop a work breakdown structure (WBS)." Universal Assignment - March 12, 2026, https://universalassignment.com/develop-a-work-breakdown-structure-wbs/
Universal Assignment August 2, 2023 Develop a work breakdown structure (WBS)., viewed March 12, 2026,<https://universalassignment.com/develop-a-work-breakdown-structure-wbs/>
Universal Assignment - Develop a work breakdown structure (WBS). [Internet]. [Accessed March 12, 2026]. Available from: https://universalassignment.com/develop-a-work-breakdown-structure-wbs/
"Develop a work breakdown structure (WBS)." Universal Assignment - Accessed March 12, 2026. https://universalassignment.com/develop-a-work-breakdown-structure-wbs/
"Develop a work breakdown structure (WBS)." Universal Assignment [Online]. Available: https://universalassignment.com/develop-a-work-breakdown-structure-wbs/. [Accessed: March 12, 2026]

Please note along with our service, we will provide you with the following deliverables:

Please do not hesitate to put forward any queries regarding the service provision.

We look forward to having you on board with us.

Most Frequent Questions & Answers

Universal Assignment Services is the best place to get help in your all kind of assignment help. We have 172+ experts available, who can help you to get HD+ grades. We also provide Free Plag report, Free Revisions,Best Price in the industry guaranteed.

We provide all kinds of assignmednt help, Report writing, Essay Writing, Dissertations, Thesis writing, Research Proposal, Research Report, Home work help, Question Answers help, Case studies, mathematical and Statistical tasks, Website development, Android application, Resume/CV writing, SOP(Statement of Purpose) Writing, Blog/Article, Poster making and so on.

We are available round the clock, 24X7, 365 days. You can appach us to our Whatsapp number +1 (613)778 8542 or email to info@universalassignment.com . We provide Free revision policy, if you need and revisions to be done on the task, we will do the same for you as soon as possible.

We provide services mainly to all major institutes and Universities in Australia, Canada, China, Malaysia, India, South Africa, New Zealand, Singapore, the United Arab Emirates, the United Kingdom, and the United States.

We provide lucrative discounts from 28% to 70% as per the wordcount, Technicality, Deadline and the number of your previous assignments done with us.

After your assignment request our team will check and update you the best suitable service for you alongwith the charges for the task. After confirmation and payment team will start the work and provide the task as per the deadline.

Yes, we will provide Plagirism free task and a free turnitin report along with the task without any extra cost.

No, if the main requirement is same, you don’t have to pay any additional amount. But it there is a additional requirement, then you have to pay the balance amount in order to get the revised solution.

The Fees are as minimum as $10 per page(1 page=250 words) and in case of a big task, we provide huge discounts.

We accept all the major Credit and Debit Cards for the payment. We do accept Paypal also.

Popular Assignments

Assignment Quantitative CASP RCT Checklist

CASP Randomised Controlled Trial Standard Checklist:11 questions to help you make sense of a randomised controlled trial (RCT)Main issues for consideration: Several aspects need to be considered when appraising arandomised controlled trial:Is the basic study design valid for a randomisedcontrolled trial? (Section A)Was the study methodologically sound? (Section B)What are

Read More »

Assignment Qualitative CASP Qualitative Checklist

CASP Checklist: 10 questions to help you make sense of a Qualitative researchHow to use this appraisal tool: Three broad issues need to be considered when appraising a qualitative study:Are the results of the study valid? (Section A)What are the results? (Section B)Will the results help locally? (Section C) The

Read More »

Assignment Topics

PS3002 Assignment TopicsDear studentsPlease choose one of the topics below. Please note that if you are repeating this subject, you cannot choose the same topic that you did previously in this subject.patellar tendinopathyinstability of the lumbar spinehamstring strainperoneal tendinopathyhip – labral tear.hip osteoarthritispatellofemoral instabilityankylosing spondylitisanterior cruciate ligament rupture (conservative management)quadriceps

Read More »

Assessment 2 – Report

Assessment 2 – Report (1200 words, 30%)PurposeTo demonstrate an understanding of the purpose and application of evidence-based dietary advice and guidelinesLearning objectives1.Review and analyse the role and function of macronutrients, micronutrients and functional components of food in maintaining health2.Understand digestion, absorption and metabolism of food in the human body and

Read More »

Assessment 2 – Individual Case Study Analysis Report

Southern Cross Institute,Level 2, 1-3 Fitzwilliam Street, PARRAMATTA NSW 2150 & Level 1, 37 George Street PARRAMATTA NSW 2150Tel: +61 2 9066 6902 Website: www.sci.edu.auTEQSA Provider No: PRV14353 CRICOS Provider No: 04078ªPage 1 of 16HRM201 Human Resources ManagementSemester 1, 2026Assessment 2 – Individual Case Study Analysis ReportSubmission Deadline: This Week,

Read More »

ASSESSMENT 2 BRIEF HPSYSD101 The Evolution of Psychology

HPSYSD101_Assessment 2_20240603 Page 1 of 7ASSESSMENT 2 BRIEFSubject Code and TitleHPSYSD101 The Evolution of PsychologyAssessment TaskAnnotated BibliographyIndividual/GroupIndividualLength2,000 words (+/- 10%)Learning OutcomesThe Subject Learning Outcomes demonstrated by successful completion of the task below include:b) Examine the significant figures, events and ideas present in the history of psychology.c) Identify and relate the

Read More »

Assessment 1 – Individual Case Study Analysis Report

HOS203 Contemporary Accommodation ManagementSemester 1, 2026Assessment 1 – Individual Case Study Analysis Report (10%)Submission Deadline: This Week, at 11:59 pm (Week 4)Overview of this AssignmentFor this assessment, students are required to analyse an assigned case study about hospitality industry relevant regulations and/or operational and accreditation failures of a hospitality organisation.

Read More »

Assessment Brief PBHL1003FOUNDATIONS OF HEALTH AND HEALTH CARE SYSTEMS

Assessment BriefPBHL1003FOUNDATIONS OF HEALTH AND HEALTH CARE SYSTEMSTitleAssessment 2 TypeEssay Due DateWeek 6 Monday 14 April 2025, 11:59pm AEST Length1000 words Weighting60% Academic IntegrityNO AI SubmissionUse Word Document – submit to Blackboard / Assessments Tasks & Submission / Assessment 2 Unit Learning OutcomesThis assessment task maps to the following Unit

Read More »

Assignment 4 – Intersection Upgrades and Interchange Station Design

CIVL5550: Civil Infrastructure DesignAssignment 4 – Intersection Upgrades and Interchange Station DesignDue: This WeekSubmission Instructions:1.Submit a report of approximately 10 pages, covering the following:Part 1: Intersection Upgrade Design•Propose upgrade schemes for two sign-controlled intersections and one signalized intersection•Use SIDRA to evaluate the performance of both the original and upgraded intersections•Use

Read More »

Assessment Brief 1

1 of 14Assessment Brief 1Assessment DetailsUnit Code Title NURS2018 Building Healthy Communities through Impactful PartnershipsAssessment Title A1: Foundations of Community Health Promotions ProjectAssessment Type ProjectDue Date Week 4, Monday, 22nd of September 2025, 11:59pm AESTWeight 40%Length / Duration 1200 wordsIndividual / Group IndividualUnit Learning Outcomes(ULOS)This assessment evaluates your achievement of

Read More »

Assignment 1 – Digital Stopwatch

Assignment 1 – Digital StopwatchThis assessment is an individual assignment. For this assignment, you are going to implement the functionality for a simple stopwatch interface as shown above. The interface itself is already provided as a Logisim file named main.circ . Your assignment must be built using this file as

Read More »

Assessment Background Country Profile

BackgroundCountry ProfileKiribati is an island nation situated in the central Pacific Ocean, consisting of 33 atolls2 and reef islands spread out over an area roughly the size of India (see Figure 1).i Yet, Kiribati is also one of the world’s smallest and most isolated country. A summary of Kiribati’s key

Read More »

Assessment 3: PHAR2001 INTRODUCTORY PHARMACOLOGY

PHAR2001 INTRODUCTORY PHARMACOLOGYAssessment 3: Case StudyASSESSMENT 1 BRIEFAssessment Summary Assessment titleAssessment 3: Case study Due DateThursday Week 6, 17 April at 11:59 Length•The suggested number of words (not a word limit) for the individual questions within the case study is as indicated at the end of each individual question. Weighting50%

Read More »

Assessment Module 1 Healthcare Systems Handout

Module 1Healthcare Systems HandoutGroup AgendasHealth Professionals: You got into health to help people. However, as an owner and operator of a multidisciplinary practice, you need to see many patients to cover the cost of equipment, technology, office and consumables, and pay your staff. The Medicare benefit doesn’t cover the rising

Read More »

Assessment 2 – Case study analysis 

Assessment 2 – Case study analysis  Description  Case study analysis  Value  40%  Length  1000 words  Learning Outcomes  1, 2, 3, 4, 5, 6, 7  Due Date  Sunday Week 9 by 23:59 (ACST)  Task Overview  In this assessment, you will choose ONE case study presenting a patient’s medical history, symptoms, and relevant test

Read More »

Assessment NURS2018: BUILDING HEALTH COMMUNITIES

NURS2018: BUILDING HEALTHCOMMUNITIES THROUGH IMPACTFULPARTNERSHIPSAssessment 1 Template: Foundation of Community Health Promotion projectOverall word count excluding the template wording (63 words) and reference list:Introduction to health issue:The case study, increase breast screening in Muslim women living in Broadmeadows,Melbourne, focuses on addressing the low participation rates in breast cancer screening amongMuslim

Read More »

Assessment EGB272: Traffic and Transport Engineering (2025-s1)

EGB272: Traffic and Transport Engineering (2025-s1)ashish.bhaskar@qut.edu.auPage 1 of 8Assessment 1A (15%) Cover PageIndividual component: 5%Group component: 10%You are expected to submit two separate submissions:Individual Submission (5%): Each student must submit their own individual report. Details of the individual report are provided in Section 3.1, and the marking rubric is in

Read More »

Assessment 3 – Essay: Assessment 3 Essay rubric

Unit: NUR5327 – Management and leadership in healthcare practice – S1 2025 | 27 May 2025Assessment 3 – Essay: Assessment 3 Essay rubricLearning Objective 5:Differentiate drivers forchange and proactively leadhealth professionalresponses to changing anddynamic environmentsFails toidentify aclear plannedchange ordoes not linkit to thestrategic plan.0 to 7 pointsIdentifies aplannedchange, butthe link

Read More »

Assessment 2 – Case study analysis 

Assessment 2 – Case study analysis  Description  Case study analysis  Value  40%  Length  1000 words  Learning Outcomes  1, 2, 3, 4, 5, 6, 7  Due Date  Sunday Week 9 by 23:59 (ACST)  Task Overview  In this assessment, you will choose ONE case study presenting a patient’s medical history, symptoms, and relevant test

Read More »

Assessment 1 PPMP20009 (Leading Lean Projects)

Term 1, 2025PPMP20009 (Leading Lean Projects)1Assessment 1 – DescriptionAssessment title Case study reportAssessment weight 40% of the unit marksReport length 3000 wordsMaximum 8 pages excluding references and appendicesReport format MS Word or PDFSubmission type IndividualSubmission due by Friday, Week 6Assessment objectiveThe purpose of this assessment item is to help you

Read More »

Assignment Maternity – Paramedic Management

Title-Maternity – Paramedic ManagementCase Study – Home Birth Learning outcomes1. Understand the pathophysiology and prehospital management of a specific obstetric condition.2. Develop a management plan for a maternity patient.3. Examine models of care available for maternity patients.4. interpret evidence that supports paramedic care of the maternity patient and neonate.5. Demonstrate

Read More »

Assignment Guidelines for Cabinet Submissions

Guidelines for Cabinet SubmissionsGENERALThe purpose of a Cabinet submission is to obtain Cabinet’s approval for a course of action. Ministers may not have extensive technical knowledge of the subject matter -and may have competing calls on their time. It is, therefore, important that Cabinet submissions are presented in a consistent

Read More »

Assignment Secondary research structure

Dissertation – Secondary Research – Possible Structure and Content GuideA front cover stating: student name, module title, module code, Title of project moduleleader, supervising tutor and word count.Abstract (optional and does not contribute to your word count)This should be an overview of the aim of the critical review, the methodology

Read More »

Assignment E-Business and E-Marketing

Module HandbookFaculty of Business, Computing and DigitalIndustriesSchool of Business(On-campus)E-Business and E-MarketingModule.2025-26􀀀Contents Module Handbook 1Contents 2Module Introduction 3Module Leader Welcome 3Module Guide 5Module Code and Title 5Module Leader Contact Details and Availability 5Module Team Tutors Contact Details and Availability 5Module Teaching 5Module Intended Learning Outcomes 5Summary of Content 6Assessment and Deadlines

Read More »

Assignment II: Computational Fluid Dynamics (CFD) Analysis of

CRICOS Provider 00025B • TEQSA PRV12080 1MECH3780: Computational MechanicsAssignment II: Computational Fluid Dynamics (CFD) Analysis ofGeneralised Cardiovascular Medical DevicesIntroduction:In this assignment, you will develop your CFD capability by analysing a benchmark casefrom a validation study sponsored by the U.S. Food & Drug Administration (FDA) and fundedby the FDA’s Critical Path

Read More »

LCRM301 Researching criminology

LCRM301 Researching criminology Worksheet 1 This worksheet will be disseminated to students in Week 3 and will assist them in the planning and development of the second assessment task: literature review. PART 1: Refining your topic The topic I am interested in is: I am interested in this topic because:

Read More »

ASSESSMENT TASK 2 – COURT APPLICATION

APPENDIX B: ASSESSMENT TASK 2 – COURT APPLICATION (30% OF FINAL MARK)General informationThis Assessment task is worth 30 marks of your final mark.The task is either making (Applicant) or opposing (Respondent) an application before the Supreme Court in your respective state based on a fact scenario, which will be uploaded

Read More »

Can't Find Your Assignment?