Risk control measures and monitoring. 2
Appendices 1 Risk assessment Matrix. 3
Appendices 2 Record of work health and safety (WHS) meeting. 4
Appendices 3 Risk Assessment Form.. 7
Risk Assessment Analysis
Risk control measures and monitoring
No. | Hazard/risk | Control | Monitor |
1. | Pick up the 25 kg of flour | Train staff in manual handling | Training record |
Supervisor to observe staff | |||
Incident log | |||
Staff instructed to use the provided trolly | WHS audit- trolly included in the check list | ||
Supervisor to observe staff | |||
Asset register | |||
Purchase lighter bag of flour- 12kg | Check invoice | ||
Ordering history | |||
Stock take |
No. | Hazard/risk | Control | Monitor |
2. | Grill cleaner chemical left open | ||
No. | Hazard/risk | Control | Monitor |
3. | |||
Training session
Conclusion
Recommendations
Appendices
Appendices 1 Risk assessment Matrix
How dangerous is the risk you have found? | ||||
How severely could it hurt someone or how ill could it make someone? | What is the probability of it happening? | |||
VERY LIKELY Could happen at any time | LIKELY Could happen sometime | UNLIKELY Could happen but very rarely | VERY UNLIKELY Could happen but probably never will | |
Cleaning chemical left open | 1 | 1 | 2 | 3 |
Electrical cord broken | 1 | 2 | 3 | 4 |
Deep fryer left open whole night | 2 | 3 | 4 | 5 |
3 | 4 | 5 | 6 |
Appendices 2 Record of work health and safety (WHS) meeting
Record of work health and safety (WHS) meeting
Department: Kitchen
Time: ___1_:48____pm Location: ____________________________
Attendees: | |
Name: Mountain Joshi | Signature: Mountain |
Name: Arjun Tamang | Signature: Arjun |
Name: Chirag kandel | Signature: Chirag |
HSR Rep: | |
Name: | Signature: |
Ref # | What is the issue: | Discussion Points about issue: |
1 |
Ref # | What is the issue: | Discussion Points about issue: |
2 | ||
Ref # | What is the issue: | Discussion Points about issue: |
3 |
Ref # | What is the issue: | Discussion Points about issue: |
4 |
Ref # | What is the issue: | Discussion Points about issue: |
5 |
What decision/s have been made:
Action items | Person responsible | Due date | Due date met Y or N | Reason date not met | Date of completion |
1 | |||||
2 | |||||
3 | |||||
4 | |||||
5 |
Appendices 3 Risk Assessment Form
Workplace/section: | Date assessment conducted | |||||||
By whom | ||||||||
Ref # | Actual / Potential Risk | Risk Classification | Current Risk Control | Current risk rating | Suggested Risk Control | Person responsible | Date put into place | Revised risk rating |