What do I need to do?
Refer to the site plans provided in Appendix B: Site plans and drawings (Click here to download) download in order to complete the tasks below relating to site preparation.
- Create a sketch plan (min. A4 size) that includes the address and location of the site noting significant trees and other features that may affect the construction of the dwelling on the site. Sketch can be hand drawn or electronically produced
- As part of your organisational safety policy, list the site facilities you would need to provide in order to meet Work Health and Safety and environmental requirements. Note the location of these facilities on the site sketch drawn approximately to scale.
How will I be assessed for this task?
For this task, you are required to submit the following:
- Completed sketch plan (min A4 size) covering above requirements. Sketch can be hand drawn or electronically produced
Part B
What do I need to do?
As part of your organisational safety policy, outline a procedure which Supervisors can follow to ensure materials are unloaded and inspected in a safe manner. Please note any documentation relevant to this procedure.
Create a five (5) step safety policy checklist (dot points are fine) that outlines the safety precautions which workers must follow while unloading and inspecting a delivery.
How will I be assessed for this task?
For this task, you are required to submit the following:
- Completed procedure covering safe unloading and inspection of materials
- Completed safety policy checklist
- Procedure and safety policy checklist must be typed and formatted
Rubric
Module 4 – Assessment Task 1 – Activity 1.1 – Site Plans and Facilities
Module 4 – Assessment Task 1 – Activity 1.1 – Site Plans and Facilities | ||
Criteria | Ratings | Pts |
This criterion is linked to a Learning Outcome1. Created a sketch plan (min. A4 size) that includes the address and location of the site noting significant trees and other features that may affect the construction of the dwelling on the site | 1 pts Satisfactory 0 pts Unsatisfactory | 1 pts |
This criterion is linked to a Learning Outcome2. Listed site facilities to be provided in order to meet Work Health and Safety and environmental requirements | 1 pts Satisfactory 0 pts Unsatisfactory | 1 pts |
This criterion is linked to a Learning Outcome3. Noted location of facilities on the site sketch drawn approximately to scale | 1 pts Satisfactory 0 pts Unsatisfactory | 1 pts |
This criterion is linked to a Learning Outcome4. Outlined a process which Supervisors can follow to ensure materials are unloaded and inspected in a safe manner and listing any documentation relevant to this procedure | 1 pts Satisfactory 0 pts Unsatisfactory | 1 pts |
This criterion is linked to a Learning Outcome5. Created a five (5) step safety policy checklist that outlines the safety precautions which workers must follow while unloading and inspecting a delivery | 1 pts Satisfactory 0 pts Unsatisfactory | 1 pts |
Total Points: 5 |
Module 4 – Project Task 1.1 – Site Plans and Facilities Part B