Assignment Task (Assignment Number: UA508)
PROJ6016 Project Management Capstone Proposal Solved
Student Personal Details, please complete all fields:
Student ID Number | A000 |
Family Name | |
Given Name/s | |
Preferred Name | |
Date of Birth (dd/mm/yyyy) | |
Torrens Email Address | |
Program Name | |
Work History |
PROPOSED CAPSTONE PROJECT
- Describe the problem / issue you propose to address.
- Why is the problem / issue of interest to you and why are you addressing this problem issue?
- Describe the key question you propose to answer via this project?
- Are you proposing to Research the problem OR carry out a project for your Employer? Do you have permission from your Employer?
- Describe the impact of the problem / issue to key stakeholders (including your Employer if you are undertaking an Employer based project). Please include a list of key stakeholders here.
- Describe how key stakeholders will benefit from your proposed project.
- Describe the key deliverables for which you will be accountable.
- How do you propose to carry out the project? (Workplace arrangement if Employer-based project, OR Research processes if Research-based project)
- How long will the project take to deliver in full?
- Which areas of Project Theory will be addressed in the project that you propose to deliver?
Please list any references you may have used in preparing this Proposal. This includes any references that you may have used to consider your initial Capstone Problem and Question.
Please submit this document into your Weekly Log. Your Academic Supervisor will review and discuss your Capstone Proposal before you can complete and submit your Application Form.
REFERENCES
PROJ6016 Project Management Capstone Proposal Solved
Assignment Solution/Sample Answer
Student Personal Details, please complete all fields:
Student ID Number | A000 |
Family Name | XXXX |
Given Name/s | XXXX |
Preferred Name | XXXX |
Date of Birth (dd/mm/yyyy) | XXXX |
Torrens Email Address | XXXX |
Program Name | XXXX |
Work History | XXXX |
PROPOSED CAPSTONE PROJECT
- Describe the problem / issue you propose to address.
This Air Quality Control Sub Plan (AQMP or Plan) is part of the M4-M5 Link Mainline Tunnels Construction Management Plan (CEMP) (the Project). The Dust Deposition Continuous Monitoring (DDMP) created for the Project is also included in this Plan.
The purpose of this AQMP is to meet the requirements of the Minister’s Conditions of Approval. Approval (CoA), the WestConnex M4-M5 Link Environmental Impact Statement (EIS), and the updated WestConnex M4-M5 Link Environmental Impact Statement (EIS)
Environment protection measures (REMM) are specified in the WestConnex M4-M5 Link’s environmental management plan. WestConnex M4-M5 Link Mainline Submission and Preferred Infrastructure Report (SPIR) Tunnel Modification Report (September 2018), as well as any relevant recommendations or legislation.
- Why is the problem / issue of interest to you and why are you addressing this problem issue?
For employees working regularly on construction sites, there is an increased risk of them developing health complications as a result. Poor air quality due to pollution can cause the following health problems: Coughs, wheezing and shortness of breath. Cardiovascular and respiratory diseases.
- Describe the key question you propose to answer via this project?
How to reduce air pollution while construction in westconnex.
- Are you proposing to Research the problem OR carry out a project for your Employer? Do you have permission from your Employer?
I am proposing to research about the problem of Air pollution in construction site.
- Describe the impact of the problem / issue to key stakeholders (including your Employer if you are undertaking an Employer based project). Please include a list of key stakeholders here.
Effects of air pollution in construction site upon health.
The majority of dust clouds comprise particles of varied sizes. Dangerous dust isn’t usually obvious.
Respirable or inspirable dust particles are bigger particles that can be breathed in. Dust particles that can be inhaled are visible to the human eye and settle in the nose, throat, and upper respiratory tract. Respirable dust is made up of microscopic dust particles that are invisible to the naked eye and penetrate deep into the lungs.
- Describe how key stakeholders will benefit from your proposed project.
The money invested on pollution reduction does not evaporate, which is one reason why environmental conservation and a high standard of living can go hand in hand. It is given to businesses that create, construct, install, manage, and operate pollution-reduction procedures and equipment. The importance of the pollution control business to earnings and growth should not be underestimated.
- Describe the key deliverables for which you will be accountable.
- At the proper managerial level, the formulation of goals in the AQMP is usually made clear in legislative or advisory documents, and may include:
- Identifying the major and secondary contaminants in the environment
- Concerns: a) health, b) impact on the environment
- related to climate change, and c) climate change-related.
- Evaluating urban or local issues, such as traffic congestion.
- Industrial facilities have a local impact on air quality.
- Evaluating regional issues, including acid rain, regional pollution, and transnational issues.
- Global challenges such as greenhouse gas emissions and global warming
- Organic contaminants that are persistent.
• Exposure to the inside.
- How do you propose to carry out the project? (Workplace arrangement if Employer-based project, OR Research processes if Research-based project)
Actions You Can Take to Help Clean Up the Air
- For optimum vapour recovery, follow the gasoline refilling instructions, being cautious not to spill fuel and tightening your gas cap securely.
- If you can find them, portable fuel containers branded “spill-proof” are a good option.
- Maintain the proper tuning of your automobile, boat, and other engines.
- Make sure your tyres are filled appropriately.
- When feasible, use ecologically friendly paints and cleaning products.
- Leaves and yard garbage should be mulched or composted.
- Instead using firewood, consider utilizing gas logs.
The project takes to deliver in full around 2 months.
- Which areas of Project Theory will be addressed in the project that you propose to deliver?
In a health effects analysis of mixtures, we suggested Bayesian kernel machine regression (BKMR) methods as a way to simultaneously achieve the multifaceted goals of selecting features, flexible visibility relationship estimation, and inference on the strength of the association between personal pollutants and health outcomes. To estimate such a potentially complex exposure-response function, we first developed a BKMR variable-selection strategy, which we name component-wise variable selection, that effectively uses two types of penalization (or regularisation) of the multivariate visibility surface.
REFERENCES
- Hughes, K. (2019). Designing post-visit action resources for families visiting wildlife tourism sites. Visitor Studies, 14(1), 66-83.
- Knaus, Christopher; Karp, Paul (14 February 2017). “Canberra gave WestConnex $3.5bn without proper assessment, audit finds”. Guardian Australia. Retrieved 1 June 2018.
- O’Sullivan, Matt (12 October 2017). “NSW Auditor-General to inquire into WestConnex for a second time”. The Sydney Morning Herald. Retrieved 1 June 2018.
- Partridge, E. (2018). From ambivalence to activism: young people’s environmental views and actions. Youth Studies Australia, 27(2), 18-25.
- Public Accountability Committee (17 December 2018). “Impact of the WestConnex project Final Report” (PDF). NSW Legislative Council. Parliament of New South Wales.
- Wakefield, S. E., Elliott, S. J., Cole, D. C., & Eyles, J. D. (2020). Environmental risk and (re) action: air quality, health, and civic involvement in an urban industrial neighborhood. Health & place, 7(3), 163-177.