CIVL4017: Surface Water Hydrology Assignment

CIVL4017: Surface Water Hydrology

Project Brief

(Autumn 2022)

Assessment tasksWeightingDue Date & Time

Project Report 1 (approx. 500 words per student)
Tasks 1 & 210%5:00 PM, Friday 08 April 2022
Project Report 2 (approx. 1000 words per student (includes improvements to 500 words per student from Progress Report 1)Tasks 3 & 410%5:00 PM, Friday 13 May 2022 (Online submission using Turnitin)
Project Report – final submission (1,500 words per student)Tasks 5 to 820%5:00 PM, Friday 10 June 2021 (Online submission using Turnitin)

Your final project report submission MUST include two-page (per member) self- reflection statement clearly identifying your contributions to the project and what you’ve learnt from the project. These pages will not count towards the word limit.

You will need to submit the report, all associated (Microsoft Excel) spreadsheets and all HEC-HMS files. Submissions is via Turnitin in vUWS. Make only one submission per team. If multiple submissions are made, only one of these submissions will be selected at random and marked. Submission will be via Turnitin in vUWS.

Make justifiable and meaningful engineering assumptions, where necessary.

Use the average of the last digits of your team members’ student ID to determine the catchment to be used for the project.

If the average is between 0 & 3 (0 ≀ π΄π‘£π‘’π‘Ÿπ‘Žπ‘”π‘’ < 3), use catchment A If the average is between 3 & 6 (3 ≀ π΄π‘£π‘’π‘Ÿπ‘Žπ‘”π‘’ < 6), use catchment B If the average is between 6 & 9 (6 ≀ π΄π‘£π‘’π‘Ÿπ‘Žπ‘”π‘’ ≀ 9), use catchment C

For example,

  • if the IDs of your team members are 12345678, 23456789 & 34567890, the average of the last three digits is .(8+9+0)/3=5.67. Use catchment B for your team project.
  • If the IDs of your team members are 34567891, 56738491, 33567885 &

123454321, the average of the last four digits is (1+1+5+1)/4=2. Use catchment A for your team project.

Estimates of all areas of the catchment can be made using either a software of your choice or any other standard engineering method you are familiar with, including the grid approach. Anapproximateestimatesuffices– use the scale shown in the figure (each grid is 1km x 1km) for estimation.

You can estimate channel length also using approximation. Catchments A, B & C are shown in Figures on the next two pages.




1000m
CatchmentA
3 sub-catchments 1, 2, & Outlet are outlets of the three sub-catchments Centroid of the catchment is at: 150o40’ E Longitude 33o25’ S Latitude
Use the scale shown in the figure to estimate areas

1000m
CatchmentB
3 sub-catchments 1, & Outlet are outlets of the three sub-catchments Centroid of the catchment is located at: 150o30’ E Longitude 33o’ 20’S Latitude



Use the scale shown in the figure to estimate areas



1000m
CatchmentC
3 sub-catchments 1, & Outlet are outlets of the three sub-catchments Centroid of the catchment is at: 150o20’ E Longitude 33o32’ S Latitude



Use the scale shown in the figure to estimate areas

Refer the learning guide for marking criteria.

Background

The project has been formulated to allow you to determine the differences in catchment responses before and after development. The catchment currently is undeveloped and one of the three sub-catchments is proposed for development. It is up to your team to decide which sub-catchment you want developed. You will need to identify the sub-catchment for development in your report.

Please note that the project has been formulated step-by-step (each task identified), the final report will need to be in a technical report format.

Task1.Estimationofphysicalparameters

Estimate the area of each sub-catchment. Compute the total catchment area.

Estimate the length of channels. This will be different for different catchments. For catchment A, you will need to estimate lengths of two channels (1 to 2 and 2 to outlet) whereas for catchments B & C, you only require one channel length (1 to outlet).

Task 2. Construction of rainfall hyetographs

Use the Bureau of Meteorology web site (http://www.bom.gov.au) to generate the family of IFD curves for your catchment. Use the 2016 IFD and the latitude and longitude stated in the figures (for your catchment) to generate IFD information for your site. Use1%AEP24-hrstormforfurtheranalysis. You will need to include both the IFD table and IFD curves in your report.

Use the ARR Data Hub web site (https://data.arr-software.org/) to generate total rainfall hyetograph for the storm generated in the above step. You will need to include the total rainfall hyetograph, both table and histogram, in your report.

Extract the initial and constant loss values from the ARR Data Hub web site. Make necessary adjustments and construct the rainfall excess hyetograph. You will need to explain how you achieved your result and include this in your report. Graphical representation suffices here.

For post-development condition, assume that both the initial loss and continuing loss will be reduced by 50% for the sub-catchment you’re proposing to develop. Remember you’re developing only one of the three sub-catchments, therefore loss values and rainfall excess will change only for one sub-catchment.

Task 3. Construction of unit hydrographs of desired duration

You will be generating 15-minute unit hydrographs for your sub-catchments using the 15-minute unit hydrograph for a 6.15km2 catchment given in the table below and making reasonable assumptions (explained below).

You may then be required to convert thus generated 15-min unit hydrograph to another duration unit hydrograph to meet the time interval of the rainfall excess hyetograph. You may need to follow S-hydrograph method to achieve this outcome.

Use of spreadsheet will save considerable time, as the process involves repetitive computations. You will need to include your spreadsheet.

A 15-minute unit hydrograph for a catchment of 6.15km2 is given in the table below.

Time(min)Discharge(m3/s) 0 5 10 15 20 25 30

0 0.50 1.80 3.50 4.0 3.75 2.26

Time(min)Discharge(m3/s) 35 40 45 50 55 60 65

1.60 1.04 0.70 0.50 0.30 0.18 0.12

Time(min)Discharge(m3/s) 70 75 80 85 90 95 100

0.09 0.06 0.04 0.03 0.02 0.01 0

Use the above 15-minute unit hydrograph to compute ordinates of the 15-min unit hydrographs for your sub-catchments using the catchment area as the scaling factor. For example, if the area of your sub-catchment is 3.075km2, each ordinate given in the above table will be half of what’s listed. The resulting 15-minute unit hydrograph will look like,

Time(min)Discharge(m3/s) 0 5 10 15 20 25 30

0 0.25 0.90 1.75 2.00 1.875 1.13

Time(min)Discharge(m3/s) 35 40 45 50 55 60 65

0.8 0.52 0.35 0.25 0.15 0.09 0.06

Time(min)Discharge(m3/s) 70 75 80 85 90 95 100

0.045 0.03 0.02 0.015 0.01 0.005 0

Similarly, if the area of your sub-catchment is 12.3km2, each ordinate will be double of what’s listed in the table. The resulting 15-minute unit hydrograph will look like,

Time(min)Discharge(m3/s) 0 5 10 15 20 25 30

0 1.00 3.60 7.00 8.00 7.50 4.52

Time(min)Discharge(m3/s) 35 40 45 50 55 60 65

3.20 2.08 1.40 1.00 0.60 0.36 0.24

Time(min)Discharge(m3/s) 70 75 80 85 90 95 100

0.18 0.12 0.08 0.06 0.04 0.02 0

Note that you may need to generate up to 3 unit hydrographs (this will depend on the areas of each sub-catchments).

Construct Ξ”t-hr unit hydrograph (where Ξ”t-hr is the time step of rainfall excess hyetograph) from the 15-minute unit hydrographs generated for your sub-catchments. You will need to use the S-hydrograph method to achieve this. You will need to explain the process you followed in your report. Make sure to verify your results by checking volumes after each computation.

Task 4. Construction of storm hydrographs

Construct the storm hydrograph for each sub-catchment using rainfall excess (task 2) and respective Ξ”t-hr unit hydrographs generated above (task 3). The 3 storm hydrographs you’ve generated are the responses at the outlet of respective sub-catchments for the catchment in natural condition. Let us call it predevelopment storm hydrographs.

Task 5. Construction of network diagram, routing through channels and hydrograph computation at the catchment outlet

Your team will need to construct the hydrologic network to show connectivity of sub-catchments, channels and reservoirs (if any).

Your team will require to extract channel properties for routing the hydrographs through channels using Muskingum routing method. For this, assume the following.

weighting factor, x= 0.2

Use average channel velocity of 1.2m/secto estimate average flow velocity in the channel. Use this average flow velocity to estimate travel time constant, K.

Use these values of x & K to route relevant hydrographs through respective channel(s) and compute the hydrograph at the outlet of the catchment.

Your team will need to discuss how you obtained these, include sample calculations and show the final result (both table and figure). All computations will be performed using a spreadsheet and the spreadsheet will also need to be submitted.

This completes generation of pre-development hydrograph at the catchment outlet.

Task 6. Post-development hydrographs

Your team will need to repeat the process, taking into account development of one of the sub-catchments. For the catchment being developed, use the following.

Both initial loss and continuing loss will be reduced by 50%.

  1. minute unit-hydrograph will have the following characteristics.
    • Peak discharge will increase by 25%
    • Time to peak will decrease by 10%
    • Time base will decrease by 20%

Use the above adjustments to scale and generate meaningful post-development 15-min unit hydrograph. Your team will have to ensure that the volume balance works out. This may require a few iterations.

Your team will then need to construct Ξ”t-hr unit hydrograph (post-development) for the sub-catchment being developed and use this to generate postdevelopment catchment response.

Task 7. Comparison of Pre- and Post-development hydrographs

You will need to compare the pre-development and post-development hydrographs. Present your results in graphical form and present salient values in a tabular form. Analyse and discuss your results.

You will then need to propose a solution that will ensure that the peak of the postdevelopment hydrograph at the outlet does not exceed the peak of the predevelopment hydrograph at the outlet. You may have to design a reservoir incorporating outlet structures to achieve this. If you’re to use this approach, you will need to route the post-development hydrograph through the reservoir.

You will need to discuss your strategy, provide the size of the reservoir and the details of outlet structures in your report.

Task 8. Use HEC-HMS to verify your results

This is the last step. You will use HEC-HMS (latest version) to verify your results. You will need to include all HEC-HMS files in your submission.

Universal Assignment (July 19, 2025) CIVL4017: Surface Water Hydrology Assignment. Retrieved from https://universalassignment.com/civl4017-surface-water-hydrology-assignment/.
"CIVL4017: Surface Water Hydrology Assignment." Universal Assignment - July 19, 2025, https://universalassignment.com/civl4017-surface-water-hydrology-assignment/
Universal Assignment April 14, 2022 CIVL4017: Surface Water Hydrology Assignment., viewed July 19, 2025,<https://universalassignment.com/civl4017-surface-water-hydrology-assignment/>
Universal Assignment - CIVL4017: Surface Water Hydrology Assignment. [Internet]. [Accessed July 19, 2025]. Available from: https://universalassignment.com/civl4017-surface-water-hydrology-assignment/
"CIVL4017: Surface Water Hydrology Assignment." Universal Assignment - Accessed July 19, 2025. https://universalassignment.com/civl4017-surface-water-hydrology-assignment/
"CIVL4017: Surface Water Hydrology Assignment." Universal Assignment [Online]. Available: https://universalassignment.com/civl4017-surface-water-hydrology-assignment/. [Accessed: July 19, 2025]

Please note along with our service, we will provide you with the following deliverables:

Please do not hesitate to put forward any queries regarding the service provision.

We look forward to having you on board with us.

Categories

Get 90%* Discount on Assignment Help

Most Frequent Questions & Answers

Universal Assignment Services is the best place to get help in your all kind of assignment help. We have 172+ experts available, who can help you to get HD+ grades. We also provide Free Plag report, Free Revisions,Best Price in the industry guaranteed.

We provide all kinds of assignmednt help, Report writing, Essay Writing, Dissertations, Thesis writing, Research Proposal, Research Report, Home work help, Question Answers help, Case studies, mathematical and Statistical tasks, Website development, Android application, Resume/CV writing, SOP(Statement of Purpose) Writing, Blog/Article, Poster making and so on.

We are available round the clock, 24X7, 365 days. You can appach us to our Whatsapp number +1 (613)778 8542 or email to info@universalassignment.com . We provide Free revision policy, if you need and revisions to be done on the task, we will do the same for you as soon as possible.

We provide services mainly to all major institutes and Universities in Australia, Canada, China, Malaysia, India, South Africa, New Zealand, Singapore, the United Arab Emirates, the United Kingdom, and the United States.

We provide lucrative discounts from 28% to 70% as per the wordcount, Technicality, Deadline and the number of your previous assignments done with us.

After your assignment request our team will check and update you the best suitable service for you alongwith the charges for the task. After confirmation and payment team will start the work and provide the task as per the deadline.

Yes, we will provide Plagirism free task and a free turnitin report along with the task without any extra cost.

No, if the main requirement is same, you don’t have to pay any additional amount. But it there is a additional requirement, then you have to pay the balance amount in order to get the revised solution.

The Fees are as minimum as $10 per page(1 page=250 words) and in case of a big task, we provide huge discounts.

We accept all the major Credit and Debit Cards for the payment. We do accept Paypal also.

Popular Assignments

Assignment Help in Jaipur – AI-Powered, Plagiarism-Free Academic Assistance

Are you a student in Jaipur looking for high-quality, plagiarism-free academic support? Whether you’re pursuing engineering at MNIT, management at Jaipuria Institute, or law at Amity University Jaipur, UniversalAssignment.com is your one-stop solution for top-rated assignment help in Jaipur. We deliver AI-enhanced assignments with Turnitin-style plagiarism reports, expert-level research, and

Read More Β»

Assignment Help in Pune – AI-Based, Plagiarism-Free Academic Solutions

Are you a student in Pune struggling to complete assignments on time? Whether you’re from Savitribai Phule Pune University, Symbiosis International University, MIT-WPU, or Bharati Vidyapeeth, UniversalAssignment.com offers the most reliable and affordable assignment help in Pune β€” with zero plagiarism and AI-enhanced quality checks. We specialize in delivering university-specific,

Read More Β»

Assignment Help in Mumbai – Trusted, AI-Powered & 100% Plagiarism-Free

Are you a student in Mumbai struggling with tight deadlines, complex assignments, or back-to-back submissions? Don’t worry β€” Universal Assignment offers the most trusted and professional assignment help in Mumbai, blending AI-powered tools with human expertise to deliver original, high-quality content every time. Whether you’re enrolled in Mumbai University, IIT

Read More Β»

Sociology Project: Case Analysis of Sarah

Assessment 3 – Final Project (35%)Final ProjectA 2000-word project consisting of three parts.Due: Sunday of Week 11Throughout the trimester, we discuss several serious social issues (e.g., family violence, inequality, poverty, mental health, addiction) and also examine various sociological perspectives (theories) that allow us to view these issues from different angles,

Read More Β»

ACC1AMD – Fundamentals of Accounting

GENERAL INFORMATION SUBMISSION: RELEVANT SUBJECT LEARNING INTENDED OUTCOMESSILO 1 – Explain the role of accounting in the business environmentSILO 2 – Apply fundamental accounting concepts and ethical principles in recording and reportingbusiness transactions.SILO 3 – Prepare basic financial statements and analyse financial reports for decision-making purposes.SILO 4 – Use information

Read More Β»

ICT504 IT Project Management

ICT504 IT Project ManagementActivity – Week 11Tech Innovate, a mid-sized technology firm specializing in software development, decided tooutsource its IT support services to a third-party provider, IT Assist Solutions, based in anothercountry. IT Assist Solutions was chosen for its competitive pricing, proven track record andability to provide 24/7 support. The

Read More Β»

EC502 Language and Literacy in the Early Years

Detailed Assessment Brief Assessment 1- Individual Assessment – Essay Unit Code/Description EC502 Language and Literacy in the Early Years Course/Subject Bachelor of Early Childhood Education Semester March 2025 Assessment Overview   Unit Learning Outcomes Addressed 1, 2, 3, 4 Assessment Objective Assessment 2: Essay Provide a critical review of relevant

Read More Β»

Examining the Factors Influencing Tourist Arrival

Assignment TaskYou are a strategist working for a major hospitality group based in Australia. The company is planninginternational expansion, and the board has asked you to compile a report to identify the most suitablelocation for the project. The board has shortlisted two international locations (which will be allocatedto you by

Read More Β»

Decision Making and Problem solving

Assignment Title:β€œWhat Are People Saying Online? Using Internet-Based Qualitative Research to SupportBusiness Decision-Making”OverviewIn this assignment, your group (2-4 students from same campus) will investigate howpeople talk online about a business, product, or issue. Using qualitative research techniques,you will collect online data, identify key themes, and recommend actions a business cantake

Read More Β»

HGA237|337 Juvenile Justice and Child Protection

InstructionsPlease read these instructions carefully. The submission time is Tuesday 10th of June 11:59pm. This is an open-book examination which should take no longer than2 hours to complete. You should set aside 15 minutes for readingtime in addition to these 2 hours. The total time therefore should be2 hours and

Read More Β»

Assignment Help in Romania – Boost Your Grades with AI-Powered, Plagiarism-Free Solutions

Are you a student in Romania looking for top-notch assignment help that’s fast, affordable, and 100% plagiarism-free? Universal Assignment blends expert academic guidance with AI-enhanced tools to deliver high-quality, original assignments tailored to your needs β€” available across Bucharest, Cluj‑Napoca, TimiΘ™oara, IaΘ™i, and beyond. Why Universal Assignment Is Romania’s Leading

Read More Β»

Assignment Help in Turkey – AI-Powered, Plagiarism-Free Solutions

Are you a student in Turkey seeking reliable assignment help that’s fast, affordable, and 100% original? Universal Assignment combines expert academic guidance with advanced AI tools to deliver top-quality, plagiarism-free workβ€”tailored for students in Istanbul, Ankara, Δ°zmir, and all over Turkey. Why Universal Assignment is Turkey’s #1 Choice Turkish students

Read More Β»

Assignment Help in Colombia – AI-Powered, 100% Plagiarism-Free Support

Are you a student in Colombia facing academic pressure and tight deadlines? Whether you’re studying in BogotΓ‘, MedellΓ­n, Cali, Barranquilla, or Cartagena, Universal Assignment provides expert, fast, and affordable assignment help in Colombia β€” powered by advanced AI tools and professional academic writers. βœ… Why Universal Assignment is Colombia’s Top

Read More Β»

Can't Find Your Assignment?