CIVL4017: Surface Water Hydrology Assignment

CIVL4017: Surface Water Hydrology

Project Brief

(Autumn 2022)

Assessment tasksWeightingDue Date & Time

Project Report 1 (approx. 500 words per student)
Tasks 1 & 210%5:00 PM, Friday 08 April 2022
Project Report 2 (approx. 1000 words per student (includes improvements to 500 words per student from Progress Report 1)Tasks 3 & 410%5:00 PM, Friday 13 May 2022 (Online submission using Turnitin)
Project Report – final submission (1,500 words per student)Tasks 5 to 820%5:00 PM, Friday 10 June 2021 (Online submission using Turnitin)

Your final project report submission MUST include two-page (per member) self- reflection statement clearly identifying your contributions to the project and what you’ve learnt from the project. These pages will not count towards the word limit.

You will need to submit the report, all associated (Microsoft Excel) spreadsheets and all HEC-HMS files. Submissions is via Turnitin in vUWS. Make only one submission per team. If multiple submissions are made, only one of these submissions will be selected at random and marked. Submission will be via Turnitin in vUWS.

Make justifiable and meaningful engineering assumptions, where necessary.

Use the average of the last digits of your team members’ student ID to determine the catchment to be used for the project.

If the average is between 0 & 3 (0 ≀ π΄π‘£π‘’π‘Ÿπ‘Žπ‘”π‘’ < 3), use catchment A If the average is between 3 & 6 (3 ≀ π΄π‘£π‘’π‘Ÿπ‘Žπ‘”π‘’ < 6), use catchment B If the average is between 6 & 9 (6 ≀ π΄π‘£π‘’π‘Ÿπ‘Žπ‘”π‘’ ≀ 9), use catchment C

For example,

  • if the IDs of your team members are 12345678, 23456789 & 34567890, the average of the last three digits is .(8+9+0)/3=5.67. Use catchment B for your team project.
  • If the IDs of your team members are 34567891, 56738491, 33567885 &

123454321, the average of the last four digits is (1+1+5+1)/4=2. Use catchment A for your team project.

Estimates of all areas of the catchment can be made using either a software of your choice or any other standard engineering method you are familiar with, including the grid approach. Anapproximateestimatesuffices– use the scale shown in the figure (each grid is 1km x 1km) for estimation.

You can estimate channel length also using approximation. Catchments A, B & C are shown in Figures on the next two pages.




1000m
CatchmentA
3 sub-catchments 1, 2, & Outlet are outlets of the three sub-catchments Centroid of the catchment is at: 150o40’ E Longitude 33o25’ S Latitude
Use the scale shown in the figure to estimate areas

1000m
CatchmentB
3 sub-catchments 1, & Outlet are outlets of the three sub-catchments Centroid of the catchment is located at: 150o30’ E Longitude 33o’ 20’S Latitude



Use the scale shown in the figure to estimate areas



1000m
CatchmentC
3 sub-catchments 1, & Outlet are outlets of the three sub-catchments Centroid of the catchment is at: 150o20’ E Longitude 33o32’ S Latitude



Use the scale shown in the figure to estimate areas

Refer the learning guide for marking criteria.

Background

The project has been formulated to allow you to determine the differences in catchment responses before and after development. The catchment currently is undeveloped and one of the three sub-catchments is proposed for development. It is up to your team to decide which sub-catchment you want developed. You will need to identify the sub-catchment for development in your report.

Please note that the project has been formulated step-by-step (each task identified), the final report will need to be in a technical report format.

Task1.Estimationofphysicalparameters

Estimate the area of each sub-catchment. Compute the total catchment area.

Estimate the length of channels. This will be different for different catchments. For catchment A, you will need to estimate lengths of two channels (1 to 2 and 2 to outlet) whereas for catchments B & C, you only require one channel length (1 to outlet).

Task 2. Construction of rainfall hyetographs

Use the Bureau of Meteorology web site (http://www.bom.gov.au) to generate the family of IFD curves for your catchment. Use the 2016 IFD and the latitude and longitude stated in the figures (for your catchment) to generate IFD information for your site. Use1%AEP24-hrstormforfurtheranalysis. You will need to include both the IFD table and IFD curves in your report.

Use the ARR Data Hub web site (https://data.arr-software.org/) to generate total rainfall hyetograph for the storm generated in the above step. You will need to include the total rainfall hyetograph, both table and histogram, in your report.

Extract the initial and constant loss values from the ARR Data Hub web site. Make necessary adjustments and construct the rainfall excess hyetograph. You will need to explain how you achieved your result and include this in your report. Graphical representation suffices here.

For post-development condition, assume that both the initial loss and continuing loss will be reduced by 50% for the sub-catchment you’re proposing to develop. Remember you’re developing only one of the three sub-catchments, therefore loss values and rainfall excess will change only for one sub-catchment.

Task 3. Construction of unit hydrographs of desired duration

You will be generating 15-minute unit hydrographs for your sub-catchments using the 15-minute unit hydrograph for a 6.15km2 catchment given in the table below and making reasonable assumptions (explained below).

You may then be required to convert thus generated 15-min unit hydrograph to another duration unit hydrograph to meet the time interval of the rainfall excess hyetograph. You may need to follow S-hydrograph method to achieve this outcome.

Use of spreadsheet will save considerable time, as the process involves repetitive computations. You will need to include your spreadsheet.

A 15-minute unit hydrograph for a catchment of 6.15km2 is given in the table below.

Time(min)Discharge(m3/s) 0 5 10 15 20 25 30

0 0.50 1.80 3.50 4.0 3.75 2.26

Time(min)Discharge(m3/s) 35 40 45 50 55 60 65

1.60 1.04 0.70 0.50 0.30 0.18 0.12

Time(min)Discharge(m3/s) 70 75 80 85 90 95 100

0.09 0.06 0.04 0.03 0.02 0.01 0

Use the above 15-minute unit hydrograph to compute ordinates of the 15-min unit hydrographs for your sub-catchments using the catchment area as the scaling factor. For example, if the area of your sub-catchment is 3.075km2, each ordinate given in the above table will be half of what’s listed. The resulting 15-minute unit hydrograph will look like,

Time(min)Discharge(m3/s) 0 5 10 15 20 25 30

0 0.25 0.90 1.75 2.00 1.875 1.13

Time(min)Discharge(m3/s) 35 40 45 50 55 60 65

0.8 0.52 0.35 0.25 0.15 0.09 0.06

Time(min)Discharge(m3/s) 70 75 80 85 90 95 100

0.045 0.03 0.02 0.015 0.01 0.005 0

Similarly, if the area of your sub-catchment is 12.3km2, each ordinate will be double of what’s listed in the table. The resulting 15-minute unit hydrograph will look like,

Time(min)Discharge(m3/s) 0 5 10 15 20 25 30

0 1.00 3.60 7.00 8.00 7.50 4.52

Time(min)Discharge(m3/s) 35 40 45 50 55 60 65

3.20 2.08 1.40 1.00 0.60 0.36 0.24

Time(min)Discharge(m3/s) 70 75 80 85 90 95 100

0.18 0.12 0.08 0.06 0.04 0.02 0

Note that you may need to generate up to 3 unit hydrographs (this will depend on the areas of each sub-catchments).

Construct Ξ”t-hr unit hydrograph (where Ξ”t-hr is the time step of rainfall excess hyetograph) from the 15-minute unit hydrographs generated for your sub-catchments. You will need to use the S-hydrograph method to achieve this. You will need to explain the process you followed in your report. Make sure to verify your results by checking volumes after each computation.

Task 4. Construction of storm hydrographs

Construct the storm hydrograph for each sub-catchment using rainfall excess (task 2) and respective Ξ”t-hr unit hydrographs generated above (task 3). The 3 storm hydrographs you’ve generated are the responses at the outlet of respective sub-catchments for the catchment in natural condition. Let us call it predevelopment storm hydrographs.

Task 5. Construction of network diagram, routing through channels and hydrograph computation at the catchment outlet

Your team will need to construct the hydrologic network to show connectivity of sub-catchments, channels and reservoirs (if any).

Your team will require to extract channel properties for routing the hydrographs through channels using Muskingum routing method. For this, assume the following.

weighting factor, x= 0.2

Use average channel velocity of 1.2m/secto estimate average flow velocity in the channel. Use this average flow velocity to estimate travel time constant, K.

Use these values of x & K to route relevant hydrographs through respective channel(s) and compute the hydrograph at the outlet of the catchment.

Your team will need to discuss how you obtained these, include sample calculations and show the final result (both table and figure). All computations will be performed using a spreadsheet and the spreadsheet will also need to be submitted.

This completes generation of pre-development hydrograph at the catchment outlet.

Task 6. Post-development hydrographs

Your team will need to repeat the process, taking into account development of one of the sub-catchments. For the catchment being developed, use the following.

Both initial loss and continuing loss will be reduced by 50%.

  1. minute unit-hydrograph will have the following characteristics.
    • Peak discharge will increase by 25%
    • Time to peak will decrease by 10%
    • Time base will decrease by 20%

Use the above adjustments to scale and generate meaningful post-development 15-min unit hydrograph. Your team will have to ensure that the volume balance works out. This may require a few iterations.

Your team will then need to construct Ξ”t-hr unit hydrograph (post-development) for the sub-catchment being developed and use this to generate postdevelopment catchment response.

Task 7. Comparison of Pre- and Post-development hydrographs

You will need to compare the pre-development and post-development hydrographs. Present your results in graphical form and present salient values in a tabular form. Analyse and discuss your results.

You will then need to propose a solution that will ensure that the peak of the postdevelopment hydrograph at the outlet does not exceed the peak of the predevelopment hydrograph at the outlet. You may have to design a reservoir incorporating outlet structures to achieve this. If you’re to use this approach, you will need to route the post-development hydrograph through the reservoir.

You will need to discuss your strategy, provide the size of the reservoir and the details of outlet structures in your report.

Task 8. Use HEC-HMS to verify your results

This is the last step. You will use HEC-HMS (latest version) to verify your results. You will need to include all HEC-HMS files in your submission.

Universal Assignment (September 27, 2023) CIVL4017: Surface Water Hydrology Assignment. Retrieved from https://universalassignment.com/civl4017-surface-water-hydrology-assignment/.
"CIVL4017: Surface Water Hydrology Assignment." Universal Assignment - September 27, 2023, https://universalassignment.com/civl4017-surface-water-hydrology-assignment/
Universal Assignment April 14, 2022 CIVL4017: Surface Water Hydrology Assignment., viewed September 27, 2023,<https://universalassignment.com/civl4017-surface-water-hydrology-assignment/>
Universal Assignment - CIVL4017: Surface Water Hydrology Assignment. [Internet]. [Accessed September 27, 2023]. Available from: https://universalassignment.com/civl4017-surface-water-hydrology-assignment/
"CIVL4017: Surface Water Hydrology Assignment." Universal Assignment - Accessed September 27, 2023. https://universalassignment.com/civl4017-surface-water-hydrology-assignment/
"CIVL4017: Surface Water Hydrology Assignment." Universal Assignment [Online]. Available: https://universalassignment.com/civl4017-surface-water-hydrology-assignment/. [Accessed: September 27, 2023]

Please note along with our service, we will provide you with the following deliverables:

Please do not hesitate to put forward any queries regarding the service provision.

We look forward to having you on board with us.

Categories

Get 90%* Discount on Assignment Help

Most Frequent Questions & Answers

Universal Assignment Services is the best place to get help in your all kind of assignment help. We have 172+ experts available, who can help you to get HD+ grades. We also provide Free Plag report, Free Revisions,Best Price in the industry guaranteed.

We provide all kinds of assignmednt help, Report writing, Essay Writing, Dissertations, Thesis writing, Research Proposal, Research Report, Home work help, Question Answers help, Case studies, mathematical and Statistical tasks, Website development, Android application, Resume/CV writing, SOP(Statement of Purpose) Writing, Blog/Article, Poster making and so on.

We are available round the clock, 24X7, 365 days. You can appach us to our Whatsapp number +1 (613)778 8542 or email to info@universalassignment.com . We provide Free revision policy, if you need and revisions to be done on the task, we will do the same for you as soon as possible.

We provide services mainly to all major institutes and Universities in Australia, Canada, China, Malaysia, India, South Africa, New Zealand, Singapore, the United Arab Emirates, the United Kingdom, and the United States.

We provide lucrative discounts from 28% to 70% as per the wordcount, Technicality, Deadline and the number of your previous assignments done with us.

After your assignment request our team will check and update you the best suitable service for you alongwith the charges for the task. After confirmation and payment team will start the work and provide the task as per the deadline.

Yes, we will provide Plagirism free task and a free turnitin report along with the task without any extra cost.

No, if the main requirement is same, you don’t have to pay any additional amount. But it there is a additional requirement, then you have to pay the balance amount in order to get the revised solution.

The Fees are as minimum as $10 per page(1 page=250 words) and in case of a big task, we provide huge discounts.

We accept all the major Credit and Debit Cards for the payment. We do accept Paypal also.

Popular Assignments

Foundations of Communication Assessment 2 Instructions

Discussion task (Total grade – 10%)   Process Work (Steps to complete the task) Answer on the Assessment 2 Submission Document – Do not upload this instruction document. Requirements (important elements to include) lastname_firstname_studentID_COMS_Assess 2_semester_year. Process for Assessment discussion tasks NOTE: If you do not participate in the class discussions then

Read More Β»

Assessment Two Dos and Don’ts (Internal)

Do: Read the assessment instructions carefully Read the marking rubric carefully Understand the question – break it down Conduct research – record the reference details Read the topic materials about communication theories, forms and factors and refer to them Contribute to the discussions in class or no marks for the

Read More Β»

Unpacking the Question: Assessment Two

Studying at university requires you to become familiar with strategies to un-pack or breakdown a variety of assessment questions/tasks throughout your studies.  Task Example of integrating the discussion, research and theories. In the group discussion my group members (name them) stated that an advertisement for a beauty product would most

Read More Β»

MGMT0001 Introduction to Commerce Assessment

MGMT0001 Introduction to Commerce Assessment 2 (worth 30%) Due date:                  2:00pm (AWST) Friday 15th September 2023 Submission:              Via Turnitin assessment submission link (see β€˜Assessment 2’ folder in β€˜Assessments’ section of Blackboard). Additional Instructions: Part A (42 marks) Nathan is a well-known chef with years of experience cooking various cuisines. After

Read More Β»

ACCT5011: Accounting Systems in the Digital Age

Practical Assignment Guide, Semester 2, 2023 Due Date for Submission: Monday 11th September 2023 at 5.00 PM Please note that the Folio Assignment for ACCT5011 Accounting Systems in the Digital Age is an individual assessment task worth 30% of your total marks in the unit. Please refer to the online

Read More Β»

EC229- Review session

Assume two cities, A and B, that can’t trade between them. Each city produces its own coconuts for its local market. If suddenly trade is possible then: D) As we saw in class, the new price will be somewhere between the original price 𝑃_𝐴,𝑃_𝐡. Hence it is impossible for consumers

Read More Β»

Computing Theory COSC

Computing Theory COSC 1107/1105 Assignment 1: Fundamentals Assessment Type Individual assignment. Submit online via Canvas β†’ As- signments β†’ Assignment 1. Marks awarded for meeting re- quirements as closely as possible. Clarifications/updates may be made via announcements/relevant discussion forums. Due Date Week 6, Sunday 27th August 2023, 11:59pm Marks 125

Read More Β»

BE279 Applied Statistics and Forecasting

Strategy, Operations, & Entrepreneurship Group Essex Business School Module Code BE279 Module Title Applied Statistics and Forecasting Assessment Type Individual Report (2,000 word) Academic Year 2022/23, Spring Term Submission Deadline Refer to FASER Task Specific Guidance Please note that: Module Learning Outcomes On successful completion of the module, students will

Read More Β»

Learning Design Tool: Little Learners Level 1 sounds

Learning Design Tool: Little Learners Level 1 sounds. Prepared by Sara Hart Date 30th August, 2023 (feel free to leave this date as it is the AT2 due date) Brief description of Learning Design   Chooseit Maker: Create, edit and play personalised learning activities that can be used in your

Read More Β»

HUMN1041 PEOPLE, PLACE AND SOCIAL DIFFERENCE ASSIGNMENT

HUMN1041 PEOPLE, PLACE AND SOCIAL DIFFERENCE ASSIGNMENT 1 TEMPLATE This assignment is made up of three (3) parts, plus a reference list and appendix. Marks are allocated for each section, as follows: – 1 mark Please ensure that you provide your answers in this template, and provide a Reference list

Read More Β»

Model 3 Launch in Australia

Client Information Company Name Tesla Contact Name   Email   Phone Number   Address Level 14, 15 Blue St. North Sydney, NSW 2060 Australia Ad link & image Project Information Project Title Model 3 Launch in Australia Project Description (100 words) Highlight the uniqueness of the car. Show the superior

Read More Β»

MKT10009 Marketing and the Consumer Experience

School of Business, Law and Entrepreneurship Assessment Task – Assignment 2  MKT10009 Marketing and the Consumer Experience Semester 2, 2023. Assessment Type Analytical Report Associated Unit Learning Outcomes (ULO’s) 2, 3, 4 Group or Individual task Individual Value (%) 25% Due Date Monday 20th September at 10:00 AET – Enterthis

Read More Β»

ASSIGNMENT – 1st Evaluation

ASSIGNMENT – 1st Evaluation Date of Submission- 4TH SEP 2023 25 MARKS COMPARATIVE PUBLIC LAW Q. You are the new Central Minister for Urban Development who is keen to make major Indian cities as smart cities. You visit different countries like USA, UK, European Countries, Japan and other developed countries

Read More Β»

Corporate & Financial Due Diligence Report

[Name of the company] Note: Students should keep in mind that application of legal provisions (including Securities Regulations) and analysis of the same is important. Merely putting the facts and figures won’t fetch even a decent mark. Note: Students should only mention the broad area of business. This part should

Read More Β»

ECON1000 S2 2023 – Marking Guidance and FAQs on GTP

Students will be marked on the extent to which they specifically answer the question and provide clear, logical, well-reasoned and sufficient explanations. Here is a summary breakdown of how marks are allocated in this GTP: Part 1 [15 marks] Β§  Providing relevant observations from the information provided in the articles

Read More Β»

ECON1000 S2 2023 – GTP Brief

ECON1000 S2 2023 – GTP Brief A.  Context and Overview The Game Theory Presentation (GTP) is worth 30% of the final mark. GTP is a β€˜take-home’ exercise with a set of tasks to do. The GTP is based on Lecture Topics: L1 and L2. You will have twenty (21) days

Read More Β»

Order #35042 Human Rights Research Essay

Draft due 26th Aug 2,500 words (excluding references and bibliography) Instructions: Structure: Title – The Tigray War: A Critical Analysis of What the Future Holds for Human Rights in the Region What can be done to ensure human rights violations will cease and be prosecuted? Expand on different actors and

Read More Β»

PMC1000: Applied Pathology

Assessment Task Sheet: Poster Presentation Date: Thursday 31st August 2023 | Weighting: 30% Assessment Task 2 You are required to develop a handout style resource (pamphlet or brochure) on a selected pathological condition which is aimed at first year student paramedics. You will need to use high quality peer reviewed

Read More Β»

Detailed Information: Reflective Assignment

Indigenous Peoples, Law and Justice Detailed Information: Reflective Assignment Due Date:                   Tuesday 5th September 2023 at 4:00 pm (AWST). Marks:                       30% of the total marks for this unit. Assignment:              The assignment will comprise two questions. Students must answer all parts of both questions. Examinable topics: The cultural immersion exercise and/or

Read More Β»

Indigenous Peoples, Law and Justice

Indigenous Peoples, Law and Justice Reflective Assignment Questions Instructions: The assignment comprises two questions. Students must answer all parts of both questions. Question 1: The proposed Referendum Question is asking Australians whether the Voice should be established. What is meant by the Voice? In May 2019, Professor Anne Twomey, an

Read More Β»

Cultural immersion activity

Context of Carrolup To support fellow Australian and truth telling. Third space = a spiritual an mental place, meeting point of many cultures all over the world to communicate and feel safe to merge thought and aspects of everyone’s individual culture to create a sense of what they want the

Read More Β»

IMPLEMENT AND MONITOR ENVIRONMENTALLY SUSTAINABLE WORK PRACTICES

ASSESSMENT COVER SHEET (Please ensure this cover sheet is completed and attached on top of each assessment) QUALIFICATION CODE AND TITLE:  Certificate IV in Commercial Cookery UNIT CODE: BSBSUS401               TITLE: IMPLEMENT AND MONITOR ENVIRONMENTALLY SUSTAINABLE WORK PRACTICES               Student Number   Student Name   Assessor Name   Assessment Name and

Read More Β»

Data Analysis and Findings

Qualitative data analysis technique called thematic analysis includes reading the data collection and looking for patterns in the meaning of the data to determine the theme. Making sense of the data is an active reflexive process in which the researcher’s personal experience is important. On Instagram, though, any company can

Read More Β»

PHE5STL: Systems Thinking and Leadership

Assessment 2: Complex problem briefing paper instructions and submission link PHE5STL: Systems Thinking and Leadership Assessment 2: Complex, or messy, problem briefing paper Assignment type Briefing paper/policy advising paper Weighting 20% Word count / length 1,500 words Note: The word count does not included references however does include in-text citations

Read More Β»

Assessment 1 Week-6: UML Modelling for a shopping mall

Assessment 1(    ) Information and Rubric Subject Code  ICT505 Subject Name  Software Development Assessment Number and Title  Assessment 1 Week-6: UML Modelling for a shopping mall Assessment Type Lab Activity Length / Duration  45 Minutes Weighting %  10% Total Marks  100 Submission Online Submission Due Date Week-6 (Sunday 23:59) Mode

Read More Β»

The Geopolitical, Economic and Legal Environment Β 

Faculty of Business and Law Assignment Brief Mode E and R Regulations Module Title: The Geopolitical, Economic and Legal Environment     Assignment Number 2 Module Code: 7010SSL   Assignment Title Macro Analysis Report Module Leader: Dr. Bentil Oduro   Assignment Credits 10           Release Date:

Read More Β»

Paragraph Template: TEEL Structure

 With this example from the discussion board, you can see Courtney answered the question with all four elements very clearly. This gives a coherent answer using different kinds of information and academic integrity. Bias is a natural behaviour of tendency to be in favour or against something in particular. From

Read More Β»

Choosing the Perfect Event Theme

Choosing the Perfect Event Theme Theme selection is crucial to creating a memorable and meaningful graduation celebration for the class. This selection should reflect their accomplishments and identities. Graduation marks the end of a long period of hard work, commitment, and personal growth.  Therefore, choosing a theme that effectively captures

Read More Β»

Can't Find Your Assignment?

Open chat
1
Free Assistance
Universal Assignment
Hello πŸ‘‹
How can we help you?