ENV3105 Hydrology Assignment 2

Assignment 2

Due date:       04 October 2022

Weighting:   25% (250 marks)

1. Overview

This assessment is designed to test your achievement of selected learning objectives of Modules 6 to 9. In particular, the assignment involves estimation of urban design discharges, reservoir routing and water balance. It is intended to reinforce and extend your knowledge on urban hydrology, using a low density residential subdivision as a case study.

The assignment is divided into three parts:

  • Part 1 – Reservoir Routing.
    • Part 2 – Estimation of Minor and Major design flows for the urban subdivision
    • Part 3 –Water balance analysis .

Part-1: Reservoir Routing

A hypothetical project has been devised to demonstrate how hydrology may be incorporated in engineering practice. Although the project is hypothetical, the various hydrological tasks that are included in the project are representative of what you may encounter after you graduate.

The following is the scope of Part-1 and Part-3 with two separate exercises:

  • An investigation of the hydrological impact of the proposed onstream weir on downstream riparian habitats.
  • A preliminary water balance analysis of the proposed off-stream aquaculture pond to determine if acceptable water levels can be maintained by Caboolture River streamflows

Hydrological impact of the onstream weir

Description of impact analysis

An Environmental Impact Assessment is required to gain approval for construction of the diversion weir. Discussions with relevant authorities and an aquatic scientist working on the project team suggest that an initial analysis should be performed to quantify the likely hydrological impact of riparian habitats downstream of the proposed weir. The main outcomes of the discussions were:

  • The initial analysis can be based on a most recent flood event of February 2022 recorded in the Upper Caboolture River should be used for this purpose
  • To assess the potential ecological impact of the proposed weir, the aquatic scientist requested responses to the following questions:
    • Would the peak discharge during the selected representative flood significantly change after the weir is built?
    • Would the weir significantly prolong the duration of flood inundation of the downstream habitat?

To assist the aquatic scientist, you are tasked with undertaking a reservoir routing analysis to estimate how the February 2022 flood hydrograph may change due to the proposed weir.

Useful materials for impact analysis

A detailed topographic survey of the Upper Caboolture River at the weir site was prepared. From this information, the volume of water able to be stored upstream of the weir at different elevations were computed.  The details are:

  Elevation (mAHD)Storage Volume (ML)
55.719.3
57.733.1
60.564.6
61.584.9
62.1102.3
62.5117.1
63.5152.7
63.9172.2
64.9213.8
65.6248.9

For the purpose of the initial hydrological analysis, it was decided that the preliminary weir configuration is of 35m long with a crest elevation of 76.0 mAHD. The initial level at the start of the event is considered as 63m.

Methodology for impact analysis

It is recommended that you undertake the following activities to initially evaluate the hydrological impact of the proposed weir:

  • Setup an EXCEL spreadsheet to make the necessary reservoir routing computations
  • Determine an elevation – storage volume relationship for the proposed weir pondage. It is acceptable to fit a regression equation to the data that has been provided.
  • Determine an elevation- outflow discharge relationship based on the weir flow equation for the adopted weir configuration
  • Compute a lookup table needed for the reservoir routing analysis
  • Undertake the reservoir routing analysis for the February 2022 flood hydrograph. Report the effect of the proposed weir in terms of change in peak discharge and inundation duration.
  • Document your analysis in the report.

Part-2: Estimation of Minor and Major design flows for the urban subdivision

Proposed Amberley residential subdivision

A drainage scheme is to be designed for a 28 lot residential located at Amberley, near the city of Ipswich, Queensland. A copy of the subdivision layout plan can be downloaded from Studydesk (Subdivision Lots Layout.pdf). The subdivision includes a network of proposed internal roads (Roads 02, 03 and 04).

Your task is to prepare a Minor system design check of the stormwater system upstream and including Pit 04/01 based on the preliminary layout and then a Major system check. The Minor system is to cater for the 2 year ARI storm and the Major system for the 100 year ARI storm. The system includes stormwater line 1 (pits 01/01 to 04/01) and line 2 (pits 01/02 and 02/02).

Pits will be based on Brisbane City Council standard drawings. Initial surface levels at pit locations are given in Table 1.

Table 1: Initial design details at pit locations

Pit/LocationFinished Surface Level (m LD)
01/01304.9
02/01304.9
03/01304.87
04/01304.57
01/02304.47
02/02304.47

LD = Local datum

Use the following information:

  1. The location of the subdivision is 27.62° S, 152.66° E
  2. The road kerbs are BCC ‘Type D’ kerb and channel. Roads 03 and 04 will have a 6.5m wide road pavement (kerb to kerb). The width of Road 02 is 8m. All roads have a dual crossfall of 1:30 (i.e. roadway has a central crown).   Assume the road reserve is 50% impervious.
  3. Assume all road pits will be 2400 lintel ‘lip in line’. The pits along Road 02 are on grade and all other pits are in sag. Sag pits have different hydraulic capacities compared to on grade pits due to the effect of water ponding.
  4. The proposed lots will be developed to ‘low density residential’ with an expected percentage impervious within the lot area of 60%.
  5. Soil permeability can be classed as ‘Medium’. Pervious parts of the subdivision can be classed as ‘Medium density bush’ or “Good grass cover’.
  6. Assume no flow of stormwater runoff into lots from neighbouring lots (i.e no flow across shared lot boundaries). Once flow meets an internal shared lot boundary, assume ‘concentrated overland flow’ conditions. Assume flows across lot boundaries to the street can occur. Use the contours shown on the layout plan to identify the subcatchment boundaries draining to each pit. This may mean that the full area of some lots may not drain to the nominated pits.
  7. To simplify the analysis, assume that there is no stormwater entry to Roads 02, 03 and 04 from external areas outside of the proposed subdivision. It is assumed that there is existing drainage to service the existing main road on the eastern entry to the subdivision. The catchment boundary shown as the red line on the subdivision layout plan can be used on this basis.
  8. The minimum travel time to a pit is 5 minutes and the maximum is 20 minutes. Reminder: Partial Area check is based on the most remote, directly connected impervious area to the pit. The travel time may be longer than 5 minutes.
  9. In completing the Hydrologic Design Sheets, it is acceptable to combine together lot subcatchments that have the same fraction impervious, rather than report CA values for individual lots.
  10. It is acceptable to scale up the CA values based on the frequency factor ratio F100/F2– this will simplify the calculations for the Major Storm analysis
  11. Do not use standard inlet times
  1. For pipe flow travel times for Sheet 2, use a minimum pipe gradient of 0.3% otherwise the road slope.
  2. Gutter flows in the street during the Minor storm should be contained within the full roadway width with zero depth at the crown. The maximum flow depth at the road kerb during the Major storm should contain flooding to within the road reserve. This corresponds to a maximum water depth of 0.25m. dV product should not exceed 0.6 m2/s. At the sag pits, check both the ponded water width at the pit and the roadway flow hazard approaching the pit during the Minor Storm.
  3. Unless otherwise defined, the drainage design check will be in accordance to the 2017 edition Queensland Urban Drainage Manual which can be accessed from UniSQ library through ezproxy link. Suitable AR&R IFD data can be used to generate design rainfall intensities.
  4. Undertake the Major design flow check for Road 02 at just downstream of pit 04/01.

Scope of Part-2

The scope of Part 2 is to undertake a Minor and Major analysis of the proposed drainage system by completion of Hydrologic Design Sheets 1, 2 and 3 (as per Module 7 of the Study Book).

After completion of the Design Sheets, review the results and make suggestions on revisions to the proposed road drainage system (e.g. requirement for additional pits, if any). It is not required to reanalyse and update the Design Sheets.

The design sheets shall be supported by:

  1. A plan showing the boundaries of each pit subcatchment and the flowpath to each pit used in the time of concentration calculation.
  2. Design assumptions (refer to report template)
  3. A worked example of how an (arbitrarily) selected row of each design sheet was determined, by providing the calculations in more detail.
  4. An output summary – giving the pit size at each pit location, the Minor discharge in each pipe reach and the Major flow characteristics (discharge, flow width, dV product) at the selected road location.

Useful Material for Part-2

The following materials have been provided and can be downloaded from StudyDesk or from external websites:

  • Subdivision layout base plan
  • Final QUDM can be downloaded from Studydesk
  • Refer to Bureau of Meteorology website for online IFD tool for design rainfalls.

Part-3: Water balance analysis of a pond

Description of water balance analysis

Your next major task is to undertake a water balance analysis of a pond. For the purpose of the analysis, the following pond configuration applies:

  • A trapezoidal-shaped pond with base dimensions of 200m long by 100m wide. Assume that the pond base is flat.
  • The pond embankment has an internal batter of 2H:1V on all sides.
  • The maximum water depth in the pond is 2m.

A relatively constant water level in the pond is considered desirable for silver perch growth. Below a critical water level of 1.5m, the pond would need to be ‘topped up’ from an alternative water supply at considerable expense. Thus, to establish the overall viability of the aquaculture project, it is considered important to determine the frequency and time duration it is expected that the pond water depth will be below 1.5m.

River water will be pumped from the proposed weir pondage to supply the pond. This will be subject to a water allocation licence and initial discussions with the relevant authority suggest that the pumping of water is expected to be limited by the following pumping rules, based on flows at the weir site:

  • No pumping is allowed at Upper Caboolture River discharges of less than 200 ML/d
  • For Upper Caboolture River discharges exceeding 200 ML/d, the maximum water extraction shall be 10 ML/day.

The water balance analysis should be performed at a daily timestep and account for the following components:

  • Upper Caboolture River streamflows into the proposed weir. These shall be computed using the ‘cut-down’ AWBM described in Module 8. The pumped water from the weir to the pond can then be directly computed from these streamflow estimates based on the pumping rules listed above.
  • Evaporation from the pond surface. This water loss can be computed using daily pan evaporation data adjusted by an appropriate coefficient.
  • Direct rainfall onto the pond surface. The pond has no land catchment and thus local runoff draining into the pond can be ignored.
  • Seepage from the pond bed. Testing of the existing pond site indicates that a seepage loss equivalent to 0.002 m/day is expected to occur. The effect of this water loss is of concern and your analysis should factor in seepage in the pond water balance.
  • To simplify the computations, base the evaporation, direct rainfall and seepage estimates on the base area of the pond.
  • Pumping to the pond will cease when the full pond capacity is reached.
  • For the purpose of the feasibility assessment, provide an analysis of the pond with no topping up.

Hydrological data is available for the 5 year period from 1/3/2017 to 1/03/2022. A water balance analysis would normally be carried out over a longer timeframe, but has been reduced for the purpose of this assignment. The water balance should be performed in an EXCEL spreadsheet to determine the following measures of pond conditions during the 5- year simulation period:

  1. The number of separate occasions that the pond water depth would be critically low
  2. The average annual period of time that the pond water depth would be critically low (in days/yr)
  3. The average annual loss of water due to evaporation and seepage (in ML/yr)
  4. The average annual pumped extraction of water from the weir (in ML/yr) Useful materials for water balance analysis
  • The average pan evaporation data is provided below in Table-2. You can consider a constant daily evaporation rate for all the days in a month. A pan coefficient of 0.8 is applicable.

Table 2: Pan Evaporation data (mm/day)

MonthPan Evaporation (mm/day)MonthPan Evaporation (mm/day)
Jan6.7July1.7
Feb5.8Aug3.7
Mar5.0Sep5.0
Apr4.0Oct5.8
May2.7Nov7.0
Jun2.2Dec7.3

4. Submission

Your submission for Assignment 2 should include:

  • A detailed report that documents all the tasks required as part of the Assignment-1. A marking scheme is provided as Table 3. Use this marking scheme to check that you have addressed the full scope of the work. If an element of the assignment has not been documented in the file report than no marks will be given for that element.
  • An Excel sheet with all the calculations shall be submitted. Electronic submission of the report and excel sheet should be through the study desk.
    • Part of the available marks has been allocated to reward reporting that is well set out and easy to follow. Submissions that are untidy and/or poorly structured and thus difficult to assess will attract less marks for this element.

The following filename convention shall be used: YourName_Ass1.pdf and YourName_Ass1.xlsx,where Your Name is your first and last names.

Penalties for late assignment submission:

If an Assignment is submitted after the published deadline without an approved extension of time, the maximum Mark will be reduced as a consequence. In this case, the available Mark is reduced by 5% (of the original available Mark) for each Calendar Day or part day that the Assignment is late.

An Assignment submitted more than one (1) week after the due date will have a Mark of zero recorded.

For students with an approved extension, a zero Mark will be awarded for an Assessment Item if it is submitted after an approved extension date.

Table 3: Assignment 2 Marking Scheme

Assignment elementTotal
Part-1 Reservoir routing 
Lookup table based on elevation-storage and elevation-discharge relationships15
Correct setup of reservoir routing spreadsheet20
Calculated and plotted hydrographs10
Determination of changes to peak discharge and inundation time5
Part 2 Minor and Major Design Discharges 
Design assumptions and output summary 
Catchment plan showing subcatchment boundaries and flowpaths10
Table of pit subcatchment details5
Table of 2 year and 100 year ARI rainfalls5
Table of runoff coefficients5
Izzard table and hydraulic capacity charts5
Output summary table5
Suggestions for revisions to proposed drainage5
Sheet 1 and worked calculation 
Appropriate time of concentration estimates (Col 1 to 8)5
Full area CA values and Rational Q estimates (Col 9 to 14)5
Partial area CA values and Rational Q estimates (Col 9 to 14)5
Pit inlet analysis and road hazard (Col 15 to 25)5
Sheet 1 worked calculation5
Sheet 2 and worked calculation 
Full area calculations (Col 1 to 5)5
Partial area calculations (Col 6 to 11)5
Sheet 2 worked calculation5
Sheet 3 and worked calculation 
Appropriate time of concentration estimates (Col 1 to 8)5
Road Q and capacity check (Col 9 to 18)10
Sheet 3 worked calculation5
Part 3: Water Balance Analysis 
Selection of AWBM parameters and catchment data15
Computation of runoff using cut-down AWBM for full simulation period20
All water balance components taken into account and modelled20
Computation of pond water balance for full simulation period15
Computation of measures of pond conditions10
Reporting 
Assignment report10
Assignment EXCEL spreadsheet10
TOTAL MARKS250
Order Now

Get expert help for ENV3105 Hydrology Assignment 2 and many more. 24X7 help, plag free solution. Order online now!

Universal Assignment (June 27, 2025) ENV3105 Hydrology Assignment 2. Retrieved from https://universalassignment.com/env3105-hydrology-assignment-2/.
"ENV3105 Hydrology Assignment 2." Universal Assignment - June 27, 2025, https://universalassignment.com/env3105-hydrology-assignment-2/
Universal Assignment September 30, 2022 ENV3105 Hydrology Assignment 2., viewed June 27, 2025,<https://universalassignment.com/env3105-hydrology-assignment-2/>
Universal Assignment - ENV3105 Hydrology Assignment 2. [Internet]. [Accessed June 27, 2025]. Available from: https://universalassignment.com/env3105-hydrology-assignment-2/
"ENV3105 Hydrology Assignment 2." Universal Assignment - Accessed June 27, 2025. https://universalassignment.com/env3105-hydrology-assignment-2/
"ENV3105 Hydrology Assignment 2." Universal Assignment [Online]. Available: https://universalassignment.com/env3105-hydrology-assignment-2/. [Accessed: June 27, 2025]

Please note along with our service, we will provide you with the following deliverables:

Please do not hesitate to put forward any queries regarding the service provision.

We look forward to having you on board with us.

Most Frequent Questions & Answers

Universal Assignment Services is the best place to get help in your all kind of assignment help. We have 172+ experts available, who can help you to get HD+ grades. We also provide Free Plag report, Free Revisions,Best Price in the industry guaranteed.

We provide all kinds of assignmednt help, Report writing, Essay Writing, Dissertations, Thesis writing, Research Proposal, Research Report, Home work help, Question Answers help, Case studies, mathematical and Statistical tasks, Website development, Android application, Resume/CV writing, SOP(Statement of Purpose) Writing, Blog/Article, Poster making and so on.

We are available round the clock, 24X7, 365 days. You can appach us to our Whatsapp number +1 (613)778 8542 or email to info@universalassignment.com . We provide Free revision policy, if you need and revisions to be done on the task, we will do the same for you as soon as possible.

We provide services mainly to all major institutes and Universities in Australia, Canada, China, Malaysia, India, South Africa, New Zealand, Singapore, the United Arab Emirates, the United Kingdom, and the United States.

We provide lucrative discounts from 28% to 70% as per the wordcount, Technicality, Deadline and the number of your previous assignments done with us.

After your assignment request our team will check and update you the best suitable service for you alongwith the charges for the task. After confirmation and payment team will start the work and provide the task as per the deadline.

Yes, we will provide Plagirism free task and a free turnitin report along with the task without any extra cost.

No, if the main requirement is same, you don’t have to pay any additional amount. But it there is a additional requirement, then you have to pay the balance amount in order to get the revised solution.

The Fees are as minimum as $10 per page(1 page=250 words) and in case of a big task, we provide huge discounts.

We accept all the major Credit and Debit Cards for the payment. We do accept Paypal also.

Popular Assignments

Nursing Ethics and Law – Henry Pearson Case Study

Nursing Ethics and Law – Henry Pearson Case Study Course Code & NameNUR1103 |Context of Professional PracticeAssessment Item and NameAssessment THREE | Case StudyAssessment Item TypeEssay/ Case studyDue Date & TimeWeek 10 | 15th March 23:59 hrsLengthEssay is 1200 words + or – 10%Marks and WeightingOverall mark is out of

Read More »

NUR3397 – Complex Care Case Study Presentation

Course Code & NameNUR3397 |Complex Care AAssessment Item and NameAssessment TWO | PresentationAssessment Item TypeIndividual oral presentationDue Date & TimeWeek 10 | 22nd April 23:59 hrsResults data will be returned to you three weeks after your submission dateLength12-15 minute oral presentation recorded to ZOOM cloud + or – 10%Marks and

Read More »

AI in Recruitment: Legal and Ethical Implications for Harmony Haven

PurposeThis assessment helps you demonstrate report-writing skills essential for HR and other professional roles. It develops your research abilities, including sourcing, reviewing, and synthesizing academic and non-academic literature. Strong report-writing skills support informed business decisions, enhancing your ability to assist managers and advance your career. AI in Recruitment: Legal and

Read More »

Youth Justice Crisis: Indigenous Incarceration in Australia

issues During Impact Root  cause Youth justice crisis ongoing Disproportionate indigenous youth incarcerations reports of abuse eg Don Dale Low age of criminal responsibility (10) – Systemic racism and overpolicing – Lack of diversion and rehabilitation pathways Word: 1000 Topic selected: Youth Justic Crisis, Assessment 1: Conflict Analysis Exercise –

Read More »

PV System Design and Energy Analysis for Residential Use

Executive Summary Provide a brief summary of the key methods and key results, max 500 words. 1.         Introduction (aims and objectives and brief description of the system studied and methods of the next sections) approximately half a page 2.         Solar irradiation analysis Provide location and data used. Provide hourly GHI,

Read More »

Assignment 3: Statistical Analysis and Recommendations for Enhancing HDI

Student Name:               Your full name Student ID:                     Your Student ID Make sure to delete the instructions!! Introduction: Include a succinct introduction at the start of your report. You may write a few sentences about purpose of this report, the type of analysis, or any other relevant information (about 50 words).

Read More »

Brian Old Age Case study Assignment

Assessment 1 – Written AssessmentAssessment TypePurposeDescriptionWritten AssignmentThe purpose of this assessment is to broaden each student’s understanding of the modulecontent using a case study and assessment toolsCase Study: Brian is an 84-year-old retired farmer in a rural area in Northern Territory. Hewas recently assessed following a minor motor vehicle accident

Read More »

Assessment name: Portfolio of planning cycle

Assessment name: Portfolio of planning cycleDue Date: Friday 13 June 11:59pmWeighting: 50%Length: 2000 wordsTask Description: This Portfolio is comprised of two tasks. You must submit your assessment as onedocument. Task 1: Anecdotal record and learning experienceAnecdotal recordView the video of pre-schoolers provided under the link “Video for Assessment 2” andcomplete

Read More »

NUR5327 Assessment 3 Assignment Help

Name NUR5327 Assessment 3 (Essay)Purpose The purpose of this assessment is to demonstrate your understanding of therolesof leadership and management in healthcare by identifying and analysinga change you have actively participated in, and how it relates to key topicssuch as interprofessional communication, evidence-based practice, and staffdevelopment.LearningOutcomes NUR5327 Assessment 3 Assignment

Read More »

Mathematics Investigation and Reflection Assignment Help

Submission: Mathematics Investigation and Reflection Assignment Help TurnitinFormat:Individual written document.Uses the current APA referencing style correctly.Length:2,000 wordsThreshold Detail:For this assessment task you must obtain at least 50% of the overall result (i.e. 25 points). If the total result for this unit is at least 50 points but you scored less

Read More »

FASS Research Proposal Template Assignment

FASS Research Proposal Template Word length2000 to 3000 wordsTitleUse a concise and descriptive title that accurately reflects the content of the proposal.Background context and significanceThis section should explain the background and context of the proposed research work,indicating the main contribution to knowledge you wish to make.Aims and objectivesInclude a clear

Read More »

Evidence to Inform Nursing Practice Assignment Help

Unit Code:   NURS12165 Unit Title:    Evidence to Inform Nursing Practice Assessment Three Type:                               Written Assessment Due date:                         Week 11: Wednesday, 28 May 2025 at 1600 (AEST) Extensions:                     Available as per policy Return date:                    Results for this assessment will be made available on Wednesday, 18 June 2025 Weighting:                       50% Length:                           

Read More »

NUR1120 | Burden of Disease and Health Equity

Assessment Item Task SheetCourse code andnameNUR1120 | Burden of Disease and Health Equity Assessment itemand nameAssessment Three | ReportDue date and time Week 11 | 22/04/2025 at 2359 hours AESTLength 1400 words (+/- 10% in each section) – includes in-text references, but not reference list.Marks out of:Weighting:80 Marks50%Assessed CourseLearning Outcomes(CLO)CLO1,

Read More »

PSY1040 Portfolio: Cultural Responsiveness & Self-Awareness

Course Code and NamePSY1040: An Introduction to Cultural Safety in PracticeAssessment Item Number and NameAssessment 2: PortfolioAssessment Item TypePortfolio PSY1040 Portfolio: Cultural Responsiveness & Self-AwarenessDue Date & TimeTuesday, 29 April 2025 (Week 12), 11:59pmLength2000 words – an average of 400 words per task.Marks and WeightingMarked out of: 100Weighting: 50%Assessed Course

Read More »

Innovative Digital App Development Report

OVERALL DESCRIPTION OF TYPE OF ASSIGNMENT Assessment 1- Type of Assignment Individual Written Report Details Individual Written Report 3,000 words (500 words of the Report is Contextualisation) Weighting of Assessment : 70% INDIVIDUAL MARK Learning outcomes assessed by Assessment: 1, 2, 3 and 4 – See Module Listings of Learning

Read More »

Tourism Trends and Investment Decisions: A Comparative Study

Assignment TaskYou are a strategist working for a major hospitality group based in Australia. The company is planninginternational expansion, and the board has asked you to compile a report to identify the most suitablelocation for the project. The board has shortlisted two international locations (which will be allocatedto you by

Read More »

EC502 Language and Literacy in the Early Years

EC502 Language and Literacy in the Early Years Unit Code/Description EC502 Language and Literacy in the Early Years Course/Subject Bachelor of Early Childhood Education Semester March 2025 Assessment Overview   Unit Learning Outcomes Addressed 1, 2, 3 Assessment Objective Assessment 1: Poster Including an Invigilated stage in Week 3. Due

Read More »

EC501 Early Childhood Learning and Development

Unit Code/Description EC501 Early Childhood Learning and Development Course/Subject Graduate Diploma in Education (early childhood) Semester S 1, 2025 Assessment Overview   Unit Learning Outcomes Addressed 1, 2, 3 Assessment Objective In this assessment, student are required to select one of the case studies provided and critically analyze the child’s

Read More »

JSB172: Professional Academic Skills

JSB172: Professional Academic SkillsAssessment: Workplace Report and Presentation Weight: 50%Due date: Friday 30th May 11:59pm Length: 1,750 words (+/- 10 %) / 5minutesPurpose/Learning Objectives:This assessment relates to Learning Outcomes 1, 2, 3, and 4: Task:Your task is to write a Workplace Report identifying how to address the topic/issue chosen or

Read More »

2015PSY Developmental Psychology Assignment

2015PSY Developmental Psychology Assignment 2025 2015PSY Developmental Psychology Assignment Assignment MaterialsAssignment Information Sheet & Marking Criteria.pdf (this document)Assignment Template.docx (template)Example Assignment.pdf (HD exemplar)Due Date: Friday 16 May, 11:59PM (Week 10)Weighting: Marked out of 100 (worth 30% of course grade)Word Count: 1,500 words maximum(inclusive of main text, headings, in-text citations; excluding

Read More »

Principles of Economics Federal Budget

Principles of Economics Short-answer Assignment V1 (20% of final mark) The assignment consists of four questions.  You should allocate at least half a page (or 250 words) to each answer or 1000 words for all four answers depending on the nature of and/or marks allocated for the question/s. You may

Read More »

LML6003 – AUSTRALIA’S VISA SYSTEM 1 (FAMILY AND OTHERVISAS)

Graduate Diploma in Migration Law LML6003 – AUSTRALIA’S VISA SYSTEM 1 (FAMILY AND OTHER VISAS) Assessment Task 2 – Semester 1, 2025 LML6003 – AUSTRALIA’S VISA SYSTEM 1 (FAMILY AND OTHERVISAS) Instructions: 1. Students must answer all questions as indicated. Make certain all answers are clearly labelled. 2. Make certain

Read More »

Construction Cadetships in the Australian Construction Industry

REPORT TOPICPrepare an Academic Report on the following:‘Construction Cadetships in the Australian Construction Industry’.The report should encompass the following: Your personal evaluation and critique of the key findings in your report including your evaluation of construction cadetships, yourfindings in relation to potential issues/problems with cadetships and your recommendations to improve

Read More »

Assessing Corporate Governance and its Significance

Assessing Corporate Governance and its Significance: A Case Study Analysis Overview: Accounting irregularities have cost investors millions of dollars and, most importantly, adversely impacted their confidence in the financial system. While there have been remarkable improvements in regulatory supervision, auditing framework and reporting transparency, young graduates must assess major corporate

Read More »

Master of Professional Accounting and Accounting Advanced

Assessment 2 – Business Case (CVP) AnalysisUnit Code/Description ACC901 Accounting for Managerial DecisionsCourse/Subject Master of Professional Accounting and Master of Professional Accounting AdvancedSemester S1 2025 Assessment Overview Unit Learning OutcomesAddressed1,2,3,4 and 5Assessment Objective The primary objective of this assessment is to assess the students’ ability to apply CVPanalysis and relevant

Read More »

Urban Design Theory Essay writing

Essays are a major form of assessment at university. Through essays, you develop your understanding of discipline-specific content, strengthen your critical thinking, and develop your ability to translate that thinking into a persuasive written form. This assignment assesses your understanding of the following Unit Learning Outcomes: 1) understand the historic

Read More »

Statutory Interpretation of Disability Discrimination in NSW Law

Foundations of Law 70102 – Assessment Task 3 – Autumn 2025Statutory Interpretation and Research ExerciseDue: Thursday 22 May 2025 by 23.59Length: 2000 words (excluding the headings Part A, Part B and Part C, footnotes andbibliography. Any additional headings that you decide to use will be included in the wordcount)Weighting: 40%Task

Read More »

Can't Find Your Assignment?