Mechanical design 1 (48600) 2021 Warman Prototype Designs Solved

Assignment Task (Assignment Number: UA514)

Mechanical design 1 (48600) 2021 Warman Prototype Designs

4 artefacts to be selected and analysis to be done for the task FRDPARRC format

Report and software analysis to be done, Report to be addressed in 3000 words and sample report attached Course material and lecture notes attached https://studentutsedu-my.sharepoint.com/:f:/g/personal/gopal-1_student_uts_edu_au/Ejnah7LDZkBDuFdy41PAfaEBb5RL1sRW5WM-xMQp9TViFQ?e=8DwhBu

Artefacts selected-
1)couplers Mechanical
2)locomotion part Mechanical
3)fasteners Mechanical
4)prototyping phase theoretical

Assignment Solution/Sample Answer

Note: For this assignment, All the Images will be provided along with the complete sample report once you will pay 6 USD charges.

2021 Warman Prototype Designs

Abstract

This paper offers a summary of the Warman Design and Build challenge project, as well as a look at and study the study and planning procedures that go into making a functional robot. For the purposes of this paper, the robot design process will be broken down into five artefacts: Base Assembly, Robot Motion Mechanisms, Track Width, and Wheels Motor. The reasoning, calculations, and investigation of the design will be studied throughout the artifacts to guarantee that the whole design process produces a product design that performs safely and reliably according the utilisation purpose as stated in its functionality. The investigation and brainstorming process will be used to back up the design judgments made on the basis of the functionality, providing additional clarity as to why each company intends and each alternative was chosen. The robot met the functional criteria relatively well, with possible hazards detected and remedies suggested as a consequence of the final results.

Abstract 2

Introduction 4

Objectives/Goals 5

Requirements 5

Acknowledgements: 6

Planning and research 6

Prototype Final 9

Artefact 1 – Couplers Mechanical 11

Parameters of Design: 11

Analysis: 12

Reference and Research: 12

Artefact 2 – locomotion part Mechanical 13

Selection and Ideation: 13

Artefact 3 – Fasteners Mechanical 14

Artefact 4 – Prototyping phase theoretical 15

Selection and Ideation: 16

Economic Analysis and Feasibility: 16

References: 18

Introduction 

The sections listed below in this chapter of the article will outline the details of the competing and the report in order to provide context for what this proposal and, by extension, the report is about, as well as what data and/or guidance are used as the foundation for the project develop – construct. Competition for Warman Engineers Australia hosts the Warman Contest, a design and build competition in which universities from all across Australia compete. This contest was created to provide students more hands-on experience with innovative thinking, real engineering design, and building. The challenge of the competition has always been to build a vehicle or robot to convey products in some form or another, with varied conditions and particular aims and needs that vary from year to year. The following are the particular specifics and background of the hypothetical circumstance in which students must create for this year’s contest, which would be the 34th Warman Design & Construct contest. A self-contained mechanism for the deployment of active ingredients is required. The device will distribute 10 pallets of chemically neutralized substances to four refining plant silos. Due to the differing chemical depths in the four silos, different amounts of pallets are required. The pallets must be deployed quickly and must not come into touch with the hazardous surfaces inside the bunded region, and the device must also be returned quickly to avoid irreversible damage.

Objectives/Goals

In a laboratory setting, design, develop, and demonstrate a pallet deployment system proof-of-concept scaled prototype. • When the autonomous system starts totally within the Start/End zone and distributes pellets to each of the four tubes, points will be awarded. • As shown in Figure 1, the number of pellets to be placed at each silo is 3 for Silo A, 1 for Silo B, 4 for Silo C, and 2 for Silo D. • Additional points will be awarded if the entire system returns to the Start/End zone side of the bright black line in less than 120 seconds, with quicker systems being preferable.

Requirements

The exact needs for the competitive system are enormous, wide, and specific at the same time. The following requirements will outline the most important factors that will influence how the robot’s design is understood. • The system must not be dangerous. (i.e., the use of any type of combustion system is prohibited.) • Prior to commencing motion with no payloads, robots must not exceed the dimensions of 500x500x500 mm (w x d x h). • The system’s operation must come to a halt in 120 seconds. • To be judged successful, the system must be floor (i.e. no flying/must stay in contact with the competition track), and all 10 payloads must be dropped.

Materials: • MDF Sheet 300x300x12mm • Aluminium square tubing, length 125mm • Aluminium Bracket • Necessary Screws.

Materials: • Steel supports x2, largest size 25.4×25.4 • Motor with rack and gear • Aluminium spacers

Components: • Cardboard slide • Alloy Scissor-type extension • Bolt and slot drive • Stepper motor Dimensions: • Retracted: 450mmx200mm • Extended: 1900mm.

Materials: • Storage container – abs plastic • Fins for fan – Balsa Wood • 12mm steel rod • Servo motor • Coupler.

Wheels Click to add text Arduino Dc motor with wheels and rubber tires • It comes with a SG90 servo motor which power up to 4.8 Volts. • Easy to program in prototype. • Cost effective.

Electrical Hardware: Control Unit and Power • The Arduino Uno is chosen as the control unit (left). • This is powered by an external power source in autonomous functionality, in the case of this project there at 2 9-volt batteries connected to the circuit.

Electrical Hardware: Motors The motors in charge of the precise movement are: • Servo motors (left) • Stepper motors (right).

Acknowledgements:

Although every team member participated and is accountable for various components and systems/sub-systems of the robot, they all worked together to make it a reality. This project can only be completed with the will and collaborative work of my fellow group members, and it is by no means an isolated endeavour. The group had put in a lot of time and effort to make this happen and push through obstacles in the project, especially given the present scenario when some of us are physically unable to attend (myself including). My other group members deserve a great thank you for making all of this achievable.

Planning and research

The above part of the report will highlight the key details in areas that are the foundation of the design specifications and go in-depth on several of the preliminary choices taken and the intestinal fortitude of the project structure in terms of the design metrics, risk assessment, and entire project making plans for the automaton build project. This part will include both original and shared information that will be the same everywhere members of a group.

FRDPARRC is an important design tool that is used to validate design decisions and serve as the foundation for a design stage that can be linked back and linked to each design phase of the project. The FRDPARRC table presented below is a shared resource that was created as a collaborative effort.

Analysis and Design

The crew created a number of designs in the early phases of the project that would eventually lead to the ultimate concept of the robot they are building. In terms of the robot design stage, this conception stage is a collaborative group effort that pulls together ideas and serves as the foundation of our thinking process.

So instead traveling sideways to line with the silos, the platform will be stationary in the middle and travel at an angle from the centre of the base, before extending the belt to discharge the balls.

Analysis of Prototypes As an early design idea for the robot functions, three prototypes were created. One design will be picked from these three prototypes utilising multiple filtering processes to honestly choose the finest design for the project. A PUGH assessment and a Pros and Disadvantages table will be utilised in this scenario to find the best solution for the

project.

Gantt chart:

The Gantt Chart that was used to keep the project on track and as a guideline for what needed to be done at any given point throughout the project is discussed in the next section

Prototype Final

Following the completion of the project’s stages of development. It was decided to employ a final prototype. Although the final prototype differed from the prototype 1 described in the preceding section of the report. The core mechanism remains the same, with the pellets delivery game’s mechanism being changed from a chain-based system to a scissor lift mechanism owing to the process difficulties and low resource availability.

Overall System Design:

System Architecture Individual parts and components are required for the robot to function, and these parts and components are present to perform any combination of functions required by the system. This section should ideally be divided into two parts: mechanical and electrical components. However, the robot’s parts and components are generally employed in conjunction with other connected parts to build a sub-system. As a result, the primary pieces with mechanical and electrical components are given below.

NEMA 23 Motor – Wheel Shaft The driving engine for the wheel shaft is a NEMA 23 motor, which allows the robot to move in a transverse manner.

Scissor Lift – NEMA 17 Motor

The NEMA 17 motor is used in the scissor list mechanism, which raises the scissor lift to let it to move ahead and reach the intended objective.

Ball Dispenser

Dispenser of Balls To get the ball to the designated position, the ball dispenser releases it to the scissor lift.

Individual Electrical Components

Electrical Components on Their Own This system’s electrical components include motors and an Arduino board, which serves as the robot’s brain and controls all of the robot’s electrical activities.

Artefact 1 – Couplers Mechanical

introduction and SLOs That Matter The robot’s foundation is the foundation of the entire robot. This assembly will hold all other subassembly components and will allow the robot to move about so that the payload can be dispensed in the proper order. Sections 2 and 3 are the most important SLOs for this artefact because it will hold all of the robot’s other components and subassemblies. Design intent is necessary to guarantee that everything fits together correctly, and dimensioning is also important to fulfil the dimension restrictions.

The goal is to maximise dimension within the size constraints so that the base assembly can fit all components required for the robot’s proper operation. The same materials will be used for the base as for the SHS steel. Square tubes will be simple to construct and process, which will cut down on the time it takes to put the robot together. To boost stability, the first concept consisted of simply building a box with wheels mounted on the exterior of the chassis. However, after discussing how the payload dispensing mechanism will operate, it is altered to a three-level box that will house the electrical components as well as the payload dispensing mechanism.

Parameters of Design:

The following are the relevant quantitative and qualitative design parameters that will satisfy the assembly’s functional requirements: 1. The base assembly’s overall dimensions must not exceed 500 x 500 x 500. 2. The entire base assembly must fit inside the components. 3. The competition track must be completely covered by the base. 4. It must be able to travel in only one direction.

Analysis:

1.The following analysis will support the above-mentioned design parameters. The numbers in the analysis correspond to the design parameters that they correspond to. 1. The wheels will be positioned outside the base frame to enhance stability. The wheel shaft will be 500 mm long in order to maximise the dimensions. The frame is also 500mm long from end to end to guarantee that the maximum amount of space is available for the robot’s electrical components. With a wheel diameter of 100mm, the wheels do not surpass the length of the frame, thus they do not add to the frame length, which is already 500mm long. When it comes to the height, it’s reduced to 350mm, leaving 150mm for the payload dispenser mechanism.

2. The lower section of the base assembly is divided into two sections to ensure that the components fit inside. The scissor lift mechanism will be put in the centre, and the electrical components of the robot will be housed in the area left on both sides.

3. The design is based on a moving chassis that stays on the ground, ensuring that the base is fully in contact with the competition track. Four wheels are employed to maximise stability and room for the robot’s components.

4. With the decision to use a scissor lift mechanism to transport the payloads to their designated silos, the base is constructed with fixed wheels that allow it to only move in one axis. The design and construction of the base assembly will be simplified as a result. This will also make programming the robot’s movement easier.

Reference and Research:

A wind-powered vehicle that my team and I developed in Introduction to Mechanical and Mechatronics Engineering a few semesters ago served as inspiration for this concept. I’ve demonstrated that the design is solid and can withstand a lot of pressure.

Artefact 2 – locomotion part Mechanical

Introduction and Key Performance Indicators (KPIs) The robot’s wheels and other components will allow it to navigate around the competition track, allowing it to reach the desired silos and drop the pellets. Sections 3, 4, and 5 are the most important SLOs for this artefact since the wheels and related components in the robot’s movement mechanism require precise dimensioning to meet the size limits. Requirements for Function ‘The robot shall represent a ground-based solution’ and ‘the robot shall not exceed 500 x 500 x 500 mm in dimension’ will be the primary functional requirements for this artefact.

Selection and Ideation:

The limits of the project come first when it comes to ideation and wheel selection. To make the robot straightforward to construct, parts for the robot’s movement mechanism must be easily accessible and not over-spec’d to prevent exceeding the project’s budgetary constraints. With these considerations in mind, the robot’s wheels were chosen as ‘Ambassador 100mm White Plastic Centre Wheel and Rubber Tyre,’ with four wheels as mentioned in the previous artefact. These wheels will then be attached to the base assembly using a 10mm threaded rod and six 10mm bolts to connect the two wheels. After that, the wheel sets will be attached to the base assembly.

The choice of this robot movement system is one of the controlling factors of the robot design because the parts contained in this assembly are something we have few controls over because they are all ready-made parts and the only part that can be altered in this assembly is the 10mm threaded rod, which can be cut to any desired length. The wheel shaft will be reduced to 500mm in order to maximise the vehicle’s dimensions while still adhering to the competition’s dimensions. Parameters of Design The following are the relevant quantitative and qualitative design parameters that will satisfy the assembly’s functional requirements:

1. Accessible parts and components are required.

2. Dimensions must not exceed the authorised maximum.

3. The robot must be able to move thanks to the movement system.

Artefact 3 – Fasteners Mechanical

Track Width Introduction and Relevant SLOs (Artefact 3) As shown in the preceding artefacts, the robot’s track width was set to be as far away from the robot base as feasible in order to maximise the robot’s dimensions. This was done because it provides stability. This object will have a justification. Because the track width design is based on logical reasoning and will be justified using theories and calculations, the most relevant SLOs for this item are sections 3, 4, and 7. Requirements for Function ‘Comply with dimension constraints,’ ‘the system must fit with the overall design of the robot,’ and ‘the system must offer stability’ will be the fundamental functional criteria of the track width. These functional requirements are critical to the system’s design in order to ensure that the track width of the system provides stability to the robot and that it can work with the robot without interfering with other systems in the robot.

Selection and Ideation The system of this object was inspired by high-performance automobiles. A difference in track width can be noted when comparing normal passenger cars versus performance cars. Performance cars always have a wide track width, which helps them maintain stability and manoeuvre at high speeds. Although our robot will not be designed to perform extreme manoeuvres or travel at high speeds, the concept of a wider track width providing stability can still be applied to this system. Parameters of Design The following are the relevant quantitative and qualitative design parameters that will satisfy the assembly’s functional requirements:

1. Comply with the system’s dimensions limits.

2. Ensure that the system is as stable as feasible.

3. It must be small enough to take up the least amount of space in the overall system.

The following analysis will support the above-mentioned design parameters. The numbers in the analysis correspond to the design parameters that they correspond to. 1. The system’s design is 500 mm in length. This indicates that the system adheres to the dimensional restrictions. 2. Any given body’s centre of gravity is in its geometric centre. As a result, placing the wheel’s tracks at the robot’s farthest point will provide the most stability because it will decrease the total robot’s centre of gravity. 3. Because the wheel diameter is 100 mm and the wheel centre is 50 mm, the design of the system will be minimally impacted.

Artefact 4 – Prototyping phase theoretical

The wheel motor is responsible for rotating the wheel shaft and allowing the robot to navigate the competition course. The motor chosen is critical since it will affect the robot’s capacity to move. A motor with insufficient torque will prevent the robot from moving, while a motor with excessive torque will make the robot difficult to control and expensive. Sections 5 and 6 are relevant SLOs for this artefact since the motor selection process necessitates estimates on how much torque is required for the robot.

Requirements for Function The wheel motor’s primary functional needs will be “to deliver appropriate torque for the robot” and “to be able to be integrated into the system.” These functional requirements will indicate the motor’s ability to work with the robot while remaining economical, ensuring that the project does not exceed its budget.

Selection and Ideation:

Selection and Ideation The concept for selecting a motor is similar to what is stated in item 2. This technology will transmit power to the wheels via a mechanism similar to that used in front-wheel-drive automobiles. With that in mind, it’s simply a matter of choosing the correct robot motor. Parameters of Design The following are the relevant quantitative and qualitative design parameters that will satisfy the assembly’s functional requirements: 1. Provide sufficient torque to the robot. 2. It’s possible to incorporate it into the robot’s design. 3. Be cost-effective.

The following analysis will support the above-mentioned design parameters. The numbers in the analysis correspond to the design parameters that they correspond to. 1. The motor provides appropriate torque to the system, as computed in item 2, thanks to the torque multiplication effect given by the gears. 2. The NEMA 23 motor fits perfectly in our robot and can be mounted just above the wheel set, allowing for more direct power transmission. 3. The NEMA 23 motor fits neatly inside our budget at A$ 33.95.

Economic Analysis and Feasibility:

The cost analysis is critical to the project because it shows how costs are properly controlled throughout the project and how it avoids becoming a theoretical design.

References:

Baconnier, Y., Dupin, J., Guinand, R., Kissler, K. H., Middelkoop, W. C., Paillard, G., … & Zanasco, J. P. (1984). High-frequency magnet for separating beams in colliders. Le Journal de Physique Colloques45(C1), C1-297.

Bulatewicz, T., Cuny, J., & Warman, M. (2020, December). The potential coupling interface: Metadata for model coupling. In Proceedings of the 2004 Winter Simulation Conference, 2004. (Vol. 1). IEEE.

Harris, J., & Rimell, J. (2020). Can rapid prototyping ever become a routine feature in general dental practice?. Dental update29(10), 482-486.

Molloy, O., Warman, E. A., & Tilley, S. (2019). Design for Manufacturing and Assembly: Concepts, architectures and implementation. Springer Science & Business Media.

Smith, W. F. (2020, August). A Pillar of Mechanical Engineering Design Education in Australia: 25 Years of the Warman Design and Build Competition. In International Design Engineering Technical Conferences and Computers and Information in Engineering Conference (Vol. 55843, p. V001T04A003). American Society of Mechanical Engineers.

Warman, J. M., de Haas, M. P., Luthjens, L. H., Yao, T., Navarro-Campos, J., Yuksel, S., … & Houter, J. (2019). FluoroTome 1: An apparatus for tomographic imaging of radio-fluorogenic (RFG) gels. Polymers11(11), 1729.

Mechanical design 1 (48600) 2021 Warman Prototype Designs

Download the sample solution for the above-mentioned assignment or order a fresh assignment. We are ready to do it for you.

Click on the below button and mention assignment ID UA514 to download the task after paying 6 USD only and support us.

Book now

Universal Assignment (March 28, 2024) Mechanical design 1 (48600) 2021 Warman Prototype Designs Solved. Retrieved from https://universalassignment.com/mechanical-design-1-48600-2021-warman-prototype-designs-solved/.
"Mechanical design 1 (48600) 2021 Warman Prototype Designs Solved." Universal Assignment - March 28, 2024, https://universalassignment.com/mechanical-design-1-48600-2021-warman-prototype-designs-solved/
Universal Assignment April 2, 2022 Mechanical design 1 (48600) 2021 Warman Prototype Designs Solved., viewed March 28, 2024,<https://universalassignment.com/mechanical-design-1-48600-2021-warman-prototype-designs-solved/>
Universal Assignment - Mechanical design 1 (48600) 2021 Warman Prototype Designs Solved. [Internet]. [Accessed March 28, 2024]. Available from: https://universalassignment.com/mechanical-design-1-48600-2021-warman-prototype-designs-solved/
"Mechanical design 1 (48600) 2021 Warman Prototype Designs Solved." Universal Assignment - Accessed March 28, 2024. https://universalassignment.com/mechanical-design-1-48600-2021-warman-prototype-designs-solved/
"Mechanical design 1 (48600) 2021 Warman Prototype Designs Solved." Universal Assignment [Online]. Available: https://universalassignment.com/mechanical-design-1-48600-2021-warman-prototype-designs-solved/. [Accessed: March 28, 2024]

Please note along with our service, we will provide you with the following deliverables:

Please do not hesitate to put forward any queries regarding the service provision.

We look forward to having you on board with us.

Categories

Get 90%* Discount on Assignment Help

Most Frequent Questions & Answers

Universal Assignment Services is the best place to get help in your all kind of assignment help. We have 172+ experts available, who can help you to get HD+ grades. We also provide Free Plag report, Free Revisions,Best Price in the industry guaranteed.

We provide all kinds of assignmednt help, Report writing, Essay Writing, Dissertations, Thesis writing, Research Proposal, Research Report, Home work help, Question Answers help, Case studies, mathematical and Statistical tasks, Website development, Android application, Resume/CV writing, SOP(Statement of Purpose) Writing, Blog/Article, Poster making and so on.

We are available round the clock, 24X7, 365 days. You can appach us to our Whatsapp number +1 (613)778 8542 or email to info@universalassignment.com . We provide Free revision policy, if you need and revisions to be done on the task, we will do the same for you as soon as possible.

We provide services mainly to all major institutes and Universities in Australia, Canada, China, Malaysia, India, South Africa, New Zealand, Singapore, the United Arab Emirates, the United Kingdom, and the United States.

We provide lucrative discounts from 28% to 70% as per the wordcount, Technicality, Deadline and the number of your previous assignments done with us.

After your assignment request our team will check and update you the best suitable service for you alongwith the charges for the task. After confirmation and payment team will start the work and provide the task as per the deadline.

Yes, we will provide Plagirism free task and a free turnitin report along with the task without any extra cost.

No, if the main requirement is same, you don’t have to pay any additional amount. But it there is a additional requirement, then you have to pay the balance amount in order to get the revised solution.

The Fees are as minimum as $10 per page(1 page=250 words) and in case of a big task, we provide huge discounts.

We accept all the major Credit and Debit Cards for the payment. We do accept Paypal also.

Popular Assignments

Bsc Public Health and Health Promotion (Top up) LSC LONDON

Health and Work Assignment Brief.                 Assessment brief: A case study of 4,000 words (weighted at 100%) Students will present a series of complementary pieces of written work that:   a) analyse the key workplace issues; b) evaluate current or proposed strategies for managing them from a public health/health promotion perspective

Read More »

6HW109 Environmental Management and Sustainable Health

ASSESSMENT BRIEF MODULE CODE: 6HW109 MODULE TITLE: Environmental Management and Sustainable Health MODULE LEADER: XXXXXXXXX ACADEMIC YEAR: 2022-23 1        Demonstrate a critical awareness of the concept of Environmental Management linked to Health 2        Critically analyse climate change and health public policies. 3        Demonstrate a critical awareness of the concept of

Read More »

PROFESSIONAL SECURE NETWORKS COCS71196

PROFESSIONAL SECURE NETWORKS– Case Study Assessment Information Module Title: PROFESSIONAL SECURE NETWORKS   Module Code: COCS71196 Submission Deadline: 10th May 2024 by 3:30pm Instructions to candidates This assignment is one of two parts of the formal assessment for COCS71196 and is therefore compulsory. The assignment is weighted at 50% of

Read More »

CYBERCRIME FORENSIC ANALYSIS – COCS71193

CYBERCRIME FORENSIC ANALYSIS – COCS71193 Assignment Specification Weighted at 100% of the module mark. Learning Outcomes being assessed by this portfolio. Submission Deadline: Monday 6th May 2024, 1600Hrs. Requirements & Marking Scheme General Guidelines: This is an individual assessment comprised of four parts and is weighted at 100% of the

Read More »

Social Media Campaigns (SMC) Spring 2024 – Winter 2024

Unit: Dynamic Websites Assignment title: Social Media Campaigns (SMC) Spring 2024 – Winter 2024 Students must not use templates that they have not designed or created in this module assessment. This includes website building applications, free HTML5 website templates, or any software that is available to them to help with

Read More »

ABCJ3103 NEWS WRITING AND REPORTING Assignment

ASSIGNMENT/ TUGASAN _________________________________________________________________________ ABCJ3103 NEWS WRITING AND REPORTING PENULISAN DAN PELAPORAN BERITA JANUARY 2024 SEMESTER SPECIFIC INSTRUCTION / ARAHAN KHUSUS Jawab dalam bahasa Melayu atau bahasa Inggeris. Jumlah patah perkataan: 2500 – 3000 patah perkataan tidak termasuk rujukan. Hantar tugasan SEKALI sahaja dalam PELBAGAIfail. Tugasan ini dihantar secara ONLINE. Tarikh

Read More »

ABCM2103 INFORMATION TECHNOLOGY, MEDIA AND SOCIETY Assignment

ASSIGNMENT/ TUGASAN _________________________________________________________________________ ABCM2103 INFORMATION TECHNOLOGY, MEDIA AND SOCIETY TEKNOLOGI MAKLUMAT, MEDIA DAN MASYARAKAT JANUARY 2021 SPECIFIC INSTRUCTION / ARAHAN KHUSUS Jawab dalam Bahasa Melayu atau Bahasa Inggeris. Jumlah patah perkataan : 2500 – 3000 patah perkataan tidak termasuk rujukan. Hantar tugasan SEKALI sahaja dalam SATU fail. Tugasan ini dihantar

Read More »

ABCR3203 COMMUNICATION LAW Assignment

ASSIGNMENT/ TUGASAN _________________________________________________________________________ ABCR3203 COMMUNICATION LAW UNDANG-UNDANG KOMUNIKASI JANUARY 2024 SEMESTER SPECIFIC INSTRUCTION / ARAHAN KHUSUS Jawab dalam Bahasa Melayu atau Bahasa Inggeris. Jumlah patah perkataan : 2500 – 3000 patah perkataan tidak termasuk rujukan. Hantar tugasan SEKALI sahaja dalam SATU fail. Tugasan ini dihantar secara ONLINE. Tarikh penghantaran        :

Read More »

ORGANISATIONAL STRATEGY PLANNING AND MANAGEMENT ASSIGNMENT

POSTGRADUATE DIPLOMA IN BUSINESS MANAGEMENT ORGANISATIONAL STRATEGY PLANNING AND MANAGEMENT ASSIGNMENT NOTE: At postgraduate level, you are expected to substantiate your answers with evidence from independent research. INTRODUCTION TO THE ASSIGNMENT • This assignment consists of FOUR compulsory questions. Please answer all of them. • When you answer, preferably use

Read More »

Solution: Scenario 1, Mirror therapy in patients post stroke

Title: Scenario 1, Mirror therapy in patients post stroke Part 1 : Summary Ramachandran and colleagues developed mirror therapy to treat amputees’ agony from phantom limbs. Patients were able to feel their amputated limb without experiencing any pain by presenting them a mirror image of their healthy arm. Since then,

Read More »

Solution: Exploring the Dominance of Silence

Slide 1: Title – Exploring the Dominance of Silence The title, “Exploring the Dominance of Silence,” sets the stage for a deep dive into the portrayal of silence in Philip K. Dick’s “Do Androids Dream of Electric Sheep?” Our presentation will dissect the literary techniques used by the author to

Read More »

Solution: Assessment: Critical Reflection S2 2023

The policies that hampered the cultural survival of Indigenous groups have a major effect on their health (Coffin, 2007). Cultural isolation can cause an identity crisis and a sense of loss, which can exacerbate mental health problems. Indigenous people have greater rates of chronic illness and impairment due to historical

Read More »

Solution: The Market – Product and Competition Analysis

Section 1: The Market – Product and Competition Analysis Industry and Competition Analysis: The baking mix market is very competitive, but My Better Batch is entering it anyhow. The prepackaged baking mixes sold in this market allow busy people to have bakery-quality products on the table quickly without sacrificing quality

Read More »

Solution: PDCA model for Riot

Student Name: Student ID: University Name: Date: Learning Outcome 1: Engage actively in recognizing a new product/service for Riot and detect the vital tasks required for its effective growth. In this comprehensive learning outcome, Riot’s progress towards innovation superiority is characterized by a deliberate scheme that draws on components from

Read More »

Solution: EDEN 100 – ASSIGNMENT 1

Part 1: Reflections on the Register Variables Use the questions in Column 1 and analyse the sample oral interactions provided under the assessment tile. The transcript for Viv’s conversation is provided on pages 4-5. Probe Questions  Link to readings and theory Interaction 1 Interaction 2 PART 1 – ANALYSING THE

Read More »

Solution: TCP/IP Questions

Table of Contents Question 1. 1 1. IPSec datagram protocol 1 2. Source and destination IP addresses in original IP datagram.. 1 3. Source and destination IP addresses in new IP header 2 4. Protocol number in the protocol field of the new IP header 2 5. Information and Bob.

Read More »

Solution: Fundamentals of Employment Assistance Program and Counselling

ASSESSMENT 3 Subject: Fundamentals of Employment Assistance Program and Counselling Case study Question 1 a)     Major Issues for Theo that could be addressed in counselling: b)    Issues to Address First in Short-Term Counselling:             The cognitive processes of memory, focus, and decision-making are all impacted by insufficient sleep. Such cognitive

Read More »

Solution: EQUITY AND INCLUSION IN EARLY CHILDHOOD IN AUSTRALIA

Written Policy Recommendation Name: Student Number: Email: Date: Introduction: The early years of a child’s life are important for their holistic development, making early childhood education a foundation for their future accomplishments. Nevertheless, guaranteeing equality and inclusion in early childhood education stays a major problem in our society. This policy

Read More »

Solution: Report Health Issue

Table of Contents Executive Summary                                                                                                   3 Introduction                                                                                                                5 Examination of the Chosen Health Issue in the Context of Lambeth                        5 Application of Health Inequality Framework and Analysis of Determinants: Psychotropic Drug Use in Lambeth                                                                           6 Exploration and Discussion of Strategies to Manage Psychotropic Drug Use in Lambeth                                                                                                                        7 Conclusion                                                                                                                  8

Read More »

Solution: Section III: Marketing

Section III: Marketing Channels for Advertising: Understanding Who Makes Baking Product Purchase Decisions is Crucial for My Better Batch’s Business Success (Sampson et al, 2017). Home bakers may make up a disproportionate share of the decision-makers in the UK. As a result, My Better Batch has to target people, especially

Read More »

Solution: Analytics Project Project Management Plan

Analytics Project Project Management Plan Date: 22-10-2023 Author: Name Here Version: 2.0 Project Management Plan (PMP) This project management plan will outline the strategies and plans used to manage ‘analytics project’ for the Style-Hub organization. It will include the tasks such as project governance, management, planning, budget and controlling. It

Read More »

Solution: Report Health Issue

Table of Contents Executive Summary                                                                                                   3 Introduction                                                                                                                5 Examination of the Chosen Health Issue in the Context of Lambeth                        5 Application of Health Inequality Framework and Analysis of Determinants: Psychotropic Drug Use in Lambeth                                                                           6 Exploration and Discussion of Strategies to Manage Psychotropic Drug Use in Lambeth                                                                                                                        7 Conclusion                                                                                                                  8

Read More »

Solution: Mirror therapy in patients post stroke

Title: Scenario 1, Mirror therapy in patients post stroke Part 1 : Summary Ramachandran and colleagues developed mirror therapy to treat amputees’ agony from phantom limbs. Patients were able to feel their amputated limb without experiencing any pain by presenting them a mirror image of their healthy arm. Since then,

Read More »

Can't Find Your Assignment?

Open chat
1
Free Assistance
Universal Assignment
Hello 👋
How can we help you?