INTRODUCTION:

Many specialists studying tall buildings may be found in works on social science, architecture, and editing. These concepts, however, are dispersed and do not adhere to any single program or conceptual framework. This study aims to identify, integrate, and integrate the fragmented and crucial aspects of tall building construction and present them in an easily accessible manner. Therefore, this study constitutes a vital information foundation for learning and examining unsustainable behaviors in tall structures. Provides a thorough “checklist” of subjects and concerns critical for long-term sustainable development. It either warns of severe fears that have not yet been examined or acts as a warning of the hazards and pitfalls of immorality. This study utilizes sustainability to integrate criticism and the dangers of long-term development. It guides the conversation via three pillars of sustainability (social, economic, and environmental) (Lowenstein, 2018).

A “constant” research study promises that, given the severe issues with traditional high-rise structures, any advances in their design, construction, and contextual interactions with their cities will be significant. Because towering buildings benefit many people while putting a strain on the environment and the neighboring transportation, sewage, and energy grids, a “sustainable” design may benefit renters while reducing environmental consequences and improving city cohesion. As a result, any design and construction advancements will help cities and citizens as architects develop high-rise structures that cater to more people and need more environment and infrastructure (Braun, 2020). Whether we are applying for new buildings or upgrading existing ones, the life cycle of a skyscraper requires rigorous and intelligent design. These accumulated characteristics have produced a significant demand for sustainable tall structures.

PROBLEM CONTEXT:

The city’s urban fabric expresses events such as expansion, change, and transition. Buildings transmit messages by the way they are interwoven into the notion of architecture. When considering development, it is critical to examine design policy since development must respond correctly to its context. Still, that context must be specified to integrate the physical, social, operational, and environmental components (Bust, 2020). Architecture is concerned with culture, society, the economy, and the environment. These components are interdependent and play a crucial role in establishing spatial characteristics. The city results from its socio-cultural and political settings, influencing both the architectural and planning sectors. Tall structures can be clustered or clustered independently. The appropriateness of a specific site for the erection of a tall structure will be determined by the conditions surrounding the area and the plan under consideration.

The tall building design has evolved swiftly; today, architectural design is an essential component of a complicated process. The random location and detailing of towering buildings create virtually frigid conditions in many American and Canadian cities (Eini et al., 2021). Problems arose due to gloomy caverns caused by tall buildings’ shadows: employees were agitated due to a lack of sunshine, congestion, overcrowded “winter” streets, and the threat of fire—the surrounding air movement, which affects their cleaning capabilities.

Many big cities require that all plans for new multistorey buildings study sunshine access and private investigator influence. According to research recommendations, new constructions should not cast long shadows in public parks, plazas, rivers, beaches, or play areas. Each structure is evaluated based on its form, height, and shape, emphasizing natural elements to improve interactions and agreement between constructions and their municipal and ecological environments. (Luo et al., 2021)

Sustainability remains a significant challenge to prevent alterations in descriptions, ideas, and priorities. Sustainability and the goal that expansion must benefit the environment are new in drawing design on national quality, background, sound, natural energy, pollution control, and public transportation operation. The goal of sustainability is to improve a person’s quality of life while living in a supportive environment. Continuous design, addressing energy efficiency while employing cutting-edge intelligent building technology, is now an integral component of every development. Construction consumes more energy and resources than any other activity, and discussing the quality of the home environment should be one of the essential things to debate in terms of environmental sustainability. In addition to technology, alternate energy sources are required.

There are three fundamental groups of strategies for environmental sustainability. The first method is what we refer to as a low-cost design project. That includes active energy, building materials, and efficiency in design by design in idle ways that have a minimal environmental effect. The second level is intended to reduce fire expenses. That implies having energy assets and integrating them in a way that provides you the lowest possible cost while still having a minimal environmental impact. Finally, assuming we have adequate data, we must design efficient end prices and end-uses.

MATERIALS, METHODS, AND MANAGEMENT:

Mismanagement of building materials impacts the entire presentation of building developments in terms of time, budget (cost), excellence, and efficiency. Thus, it is critical to do everything from the design phase through the project construction phase. To avoid losses on the part of building businesses, waste losses should be reduced throughout the building. Asset management operations begin before production begins by supplying the necessary resources and ensuring their availability at various production phases.

The planning phase necessitates forecasting a company’s sales and purchase of numerous items necessary in manufacturing.

Asset management functions include acquiring, obtaining building ingredients, transportation, storage, inventory control, quality control and inspection of goods, inventory management, packaging, storeroom planning, book-keeping, disposal, excess, and disposal of archaic items, security of finished goods, and maintenance. Material management aims to regulate the flow of material properly—material, such as things acquired from third-party vendors.

An organization that used to manufacture completed goods. Building materials may be classified based on their construction and how they can be touched on-site, and they are as follows:

Bulk materials are transported in large quantities and placed in a container.

Bagged materials: These are products given in bags for ease of handling and management.

Palleted material: These are packaged supplies that are delivered on pallets.

Packaged material: These are products bundled together to prevent harm during transportation and degradation when kept.

Loose materials: These are light-weight building resources that should be handled individually. Building materials play a significant part in today’s modern period; while their primary application is in building, no engineering discipline can be regarded without their use. The construction materials business is critical to our national economy. Its outcome mutually influences the quantity and superiority of building work.

MATERIAL MANAGEMENT:

The primary role of supply chain management is asset management, which entails designing and managing supply networks to fulfill a firm’s or organizational asset demands. Among these principles are working and controlling the flow of commodities simultaneously with flexible evaluations such as petition, price, obtainability, excellence, and conveyance schedules. (Igere et al., 2020)

Asset managers assess the number of items required and held in stock, schedule their completion, develop account stages for each thing (immature goods, continuing work, or finished goods), and interconnect statistics and necessities to obtaining operations. As well as a more extensive supplier network, Material management also comprises material quality assurance to guarantee that it satisfies client needs on time and at the lowest possible cost.

Asset organization schemes combine all construction material-related operations and are a core business purpose that enhances value to the final merchandise. It may also take in the obtaining of equipment and other equipment necessary for manufacturing operations, in addition to the remaining components.

Asset experts, list control managers, asset managers, asset planners, and expediters are typical jobs in Asset Management and combined roles such as buyer/editors.

Whatever the position, the primary goal of Resource Management is to assure the provision of products with advanced inventory levels and a slight variance between planned and actual outcomes.

Material management goals are rarely known as the “Five Rs of Asset Management:

  1. The suitable material
  2. At the right time
  3. In the right amount

And of the worth that is:

  1. At the right price
  2. From the suitable sources

BUILDING REGULATIONS:

A set of authorized papers provides primary direction on how particular building design and construction parts might meet Building Guidelines.

Part A: Structure

Buildings must be deliberate, built, or altered so that they are mechanically safe and robust and do not put at risk the structural stability of neighboring structures. Part A specifies design ethics for all buildings and provides simple design principles for typical residential structures’ features. It comprises physical diagrams such as roof frames, brick walls, and physical strength charts.

Part B: Fire safety

It covers all preventive measures required to protect building populations, people in the neighborhood of houses, and firefighters from flames. The necessities address seepage routes, fire recognition and cautionary schemes, structural fire confrontation, fire parting, guard, compartmentation, and parting to avoid fire spread, flammable material control, and access and services for firefighting.

Part C: Site preparation and resistance to contaminants and moisture

Building weather- and water-tightness, subsurface drainage, site training, and procedures to cope with the polluted ground, radon, methane, and other site-related dangerous chemicals are all included.

Part D: Toxic substances

This controls threats from the poisonous chemicals used in inlining and tells the use of urea-formaldehyde (UF) foam.

Part E: Resistance to the passage of sound

Concerns about the guidelines for sound lining amongst buildings and new houses and building alterations to yield homes. It addresses sound dropping between inhabited and chosen rooms in dwellings and audile circumstances in shared spaces in flats and schools.

Part F: Ventilation

All constructions must see airing and air superiority guidelines. It also takes in norms for concentration preclusion.

Part G: Sanitationhot water safety , and water efficiency

Begins necessities for sanitary and washing facilities, restrooms, and hot water supply. It also speeches the needs for unvented hot water systems in safety.

Part H: Materials and artistry

There is a need for construction work to be done correctly and skillfully.

BUILDING MANAGEMENT SYSTEM & APPLICATIONS:

To ensure sustainability, a building management system (BMS), also known as a building automation system (BAS), must be placed within buildings to display and normalize electrical and mechanical systems such as electricity, lighting, and ventilation. An essential BMS is made up of software, a server-based server, and intelligent sensors that are linked to an Internet-based network. The intelligent sensors placed around the building collect data and send it to the BMS, which stores it on a website. If the sensor returns data outside of the prescribed parameters, the BMS will raise the alarm. In a data center, for example, if the temperature in the server room reaches the maximum limit, the BMS may sound an alert.

INSTALLATION PROCEDURES OF VERTICAL TRANSPORTATION, HVAC, AND LIGHTING-ACOUSTICS:

The essential functions of a Heating, Ventilation and Air-Conditioning (HVAC) scheme are to help preserve acceptable interior air superiority over proper aeration with percolation and provide warm air ease. HVAC systems are amongst the most energy-intensive school components (Wright & Zhang, 2019).

Designers should consider using usual airing and treatable openings to enhance mechanical ventilation. 

• If usable windows are going to be used to complement the HVAC system, make sure that:

o Outdoor ventilation is located within 3-6 meters from the ground (head height);

o windows are adjustable and can close securely and securely;

o windows are positioned to use the operation of the wind and contain holes on contradictory sides for increased airflow.

• Include a second filter section in ventilation systems.

• Think about putting an essential pressure separation gauge on each filter bank.

• Include a measurement station that entirely regulates the quantity of external airflow by simulating an external air conditioner and a return (re-rotator) if necessary to overcome air and stack effects.

• Take extra precautions to keep moisture out of the piping.

• When selecting a plumbing boarding or internal pipeline for warm air and acoustic controls, keep in mind the possibility of uncontrolled moisture entering the pipe during the system’s lifespan.

• To avoid air leaks from the HVAC system, turn off the air ducts.

PERFORMANCE OF THERMAL AND COMFORT CONDITIONS AND INDOOR AIR QUALITY:

Thermal insulation research is a multifaceted topic heavily influenced by the set indoor temperature, residual temperature, and recovery, among other factors. The forecast model is particularly significant in better understanding the interplay between the elements controlling and raising the temperature. Two basic ways of assessing thermal comfort are utilized globally, including the Fanger temperature balance model and the dynamic model. According to Fanger’s temperature model, residents are essentially idle recipients of indoor heating, which a flexible model has challenged. The inhabitant may modify their activity to adapt to the interior climate.

Indoor air quality (IAQ) significantly impacts people’s health, particularly in kindergartens and primary schools.

Furthermore, due to population expansion and employment, the pollution level created by 591 15 out of 30 students in high schools and universities may be higher than in specific locations. As a result, experimental testing, IAQ analysis representations, and arithmetical analysis are essential to offer apprentices with hale and hearty settings and recover their academic performance. In general, there are two methods for measuring IAQ-related metrics. The initial stage is to monitor IAQ for a length of time continually. It monitors IAQ parameters such as CO2, CO, SO2, NO2, H2S, PM2.5, PM10, and total volatile organic compounds (TVOCs) for many hours or longer. The dimension outcomes are significantly related to community activities (Spitler, 2019).

The second approach is an IAQ measurement that is done, which does not exhibit altered concentration profiles over time, in limitations such as volatile organic compounds (VOCs), aldehydes, toluene, and aldehydes. Notably, PM2.5 and CO2 are primary sources of air pollution among all home pollutants.

Make a Construction Schedule:

Construction managers are in charge of a variety of duties. To mention a few responsibilities, they must create a day-to-day building account, achieve the labor force, bow to bids, and manage building documents. The most critical aspect, though, is making a timetable.

The nine steps to creating a building project agenda:

  • Choose a structure development tool
  • Conduct investigates
  • List subcontractors
  • List errands
  • Fix a predictable time for each task
  • Create a work breakdown structure (WBS)
  • Go over the plan with shareholders
  • Implement
  • Appraisal

DISCUSSION:

BIM (Building Information Modelling) is fetching a vital constituent of the building sector. Despite its brief existence, BIM has grown knowingly in the last period. This is primarily due to its capability to build systems (Landsberger et al., 2020). BIM may help all parties and system divisions in a project develop an integrated team by creating a shared language. The BIM approach works well with combined project delivery schemes. The job of BIM as a project scheme manager is the same to that of a project manager. BIM takes part in multiple sectors via efficient communication, evaluates construction project plans, calculates project costs and time at any moment using cost-cutting, creates a giant image of projects using visualization, and forms collaborative teams (Mitchell, 2019).

The project manager does all of this at varying rates during the project’s life cycle. For project managers to be successful, it is critical to have the appropriate BIM expertise and experience. This study also examines BIM information needs and mentorship experience in project management.

Order Now

Get expert help for BUILDING SERVICES: MATERIAL, METHOD, AND MANAGEMENT and many more. 24X7 help, plag free solution. Order online now!

Universal Assignment (February 2, 2023) BUILDING SERVICES: MATERIAL, METHOD, AND MANAGEMENT. Retrieved from https://universalassignment.com/building-services-material-method-and-management/.
"BUILDING SERVICES: MATERIAL, METHOD, AND MANAGEMENT." Universal Assignment - February 2, 2023, https://universalassignment.com/building-services-material-method-and-management/
Universal Assignment June 26, 2022 BUILDING SERVICES: MATERIAL, METHOD, AND MANAGEMENT., viewed February 2, 2023,<https://universalassignment.com/building-services-material-method-and-management/>
Universal Assignment - BUILDING SERVICES: MATERIAL, METHOD, AND MANAGEMENT. [Internet]. [Accessed February 2, 2023]. Available from: https://universalassignment.com/building-services-material-method-and-management/
"BUILDING SERVICES: MATERIAL, METHOD, AND MANAGEMENT." Universal Assignment - Accessed February 2, 2023. https://universalassignment.com/building-services-material-method-and-management/
"BUILDING SERVICES: MATERIAL, METHOD, AND MANAGEMENT." Universal Assignment [Online]. Available: https://universalassignment.com/building-services-material-method-and-management/. [Accessed: February 2, 2023]

Please note along with our service, we will provide you with the following deliverables:

Please do not hesitate to put forward any queries regarding the service provision.

We look forward to having you on board with us.

Get 90%* Discount on Assignment Help

Most Frequent Questions & Answers

Universal Assignment Services is the best place to get help in your all kind of assignment help. We have 172+ experts available, who can help you to get HD+ grades. We also provide Free Plag report, Free Revisions,Best Price in the industry guaranteed.

We provide all kinds of assignmednt help, Report writing, Essay Writing, Dissertations, Thesis writing, Research Proposal, Research Report, Home work help, Question Answers help, Case studies, mathematical and Statistical tasks, Website development, Android application, Resume/CV writing, SOP(Statement of Purpose) Writing, Blog/Article, Poster making and so on.

We are available round the clock, 24X7, 365 days. You can appach us to our Whatsapp number +1 (613)778 8542 or email to info@universalassignment.com . We provide Free revision policy, if you need and revisions to be done on the task, we will do the same for you as soon as possible.

We provide services mainly to all major institutes and Universities in Australia, Canada, China, Malaysia, India, South Africa, New Zealand, Singapore, the United Arab Emirates, the United Kingdom, and the United States.

We provide lucrative discounts from 28% to 70% as per the wordcount, Technicality, Deadline and the number of your previous assignments done with us.

After your assignment request our team will check and update you the best suitable service for you alongwith the charges for the task. After confirmation and payment team will start the work and provide the task as per the deadline.

Yes, we will provide Plagirism free task and a free turnitin report along with the task without any extra cost.

No, if the main requirement is same, you don’t have to pay any additional amount. But it there is a additional requirement, then you have to pay the balance amount in order to get the revised solution.

The Fees are as minimum as $10 per page(1 page=250 words) and in case of a big task, we provide huge discounts.

We accept all the major Credit and Debit Cards for the payment. We do accept Paypal also.

Popular Assignments

Medical Sciences Question-Answers

. Describe the nursing assessment and management for the person with hypoglycaemia • Clinical assessment skills for the renal system• Clinical plans for people with common urinary tract disorders• Clinical plans for people with common kidney disorders Get expert help for Medical Sciences Question-Answers and many more. 24X7 help, plag

Read More »

NRSG367 Transition to Professional Nursing Assessment Task 2 Case Study

Assessment Task Overview Transitioning to professional practice is a critical phase for the novice Registered Nurse. Managing professional role requirements, organisational technologies and team dynamics while on shift can be challenging. This is often accompanied by changed personal circumstances, with graduates balancing shift work, working full time and socialisation with

Read More »

MIS607 Cybersecurity Threat Model Report

ASSESSMENT 2 BRIEF Subject Code and Title MIS607 Cybersecurity Assessment Threat Model Report Individual/Group Individual Length 1500 words (+/- 10%) Learning Outcomes The Subject Learning Outcomes demonstrated by successful completion of the task below include: Explore and articulate cyber trends, threats and staying safe in cyberspace, plus protecting personal and

Read More »

SOC 103A Developing Social Policy

  Assessment Brief Program   Bachelor of Applied Social Science   Subject   Developing Social Policy   Subject code   SOC 103A   Name of assessment   Assessment 2: Report on Policy Process   Length   1500 words Learning outcomes addressed by this assessment: This assessment examines students on learning

Read More »

ACE 0340 ACADEMIC LITERACY AND COMMUNICATION SKILLS

ACE 0340 ACADEMIC LITERACY AND COMMUNICATION SKILLS ASSIGNMENT BRIEF Social Sciences and Humanities QUOTING and CITING ASSESSMENT NUMBER 2 The WEIGHTING (the proportion this contributes to your module mark) is 25% The DEADLINE for this assessment is 01.11.21 Provided the work is submitted by the deadline, we will give you

Read More »

Assessment 2 Research Analysis

Assessment Task 2 Guide This assessment must be completed and submitted as a word document. Assessment 2 Research Analysis ERA Report Research Focus: Investigating the impact of social distancing on international students’ health and coping during the COVID-19 pandemic. Background Context, Aim and Survey Completion Stress refers to the body’s

Read More »

1007ICT / 1807ICT / 7611ICT Assignment

Due Date: 11:59pm Sunday 5th February 2023 1.   Individual Assessment This is an individual assignment. All work submitted must be your own work. Be careful not to use the work of others as your own nor have others use your work as their own. 2.   Software Requirement In this assignment,

Read More »

BSBINS407 Consolidate and Maintain Library Industry Knowledge

Student Name   Student Number Unit Code/s & Name/s BSBINS407 Consolidate and Maintain Library Industry Knowledge Cluster NameIf applicable N/A Assessment Name Portfolio of Evidence – Industry Discussion Assessment Task No. Assessment Due Date   Date submitted Assessor Name   Student Declaration:  I declare that this assessment is my own

Read More »

The best place to get Y diagram Chemistry Assignment Immediately

Struggling with Y diagram Chemistry Assignment? Many students need Y diagram chemistry assignment help to them learn the subject better.  The Y Diagram is a popular mnemonic aid for remembering certain concepts. This means that it helps us remember the relationship between the mole and other basic concepts of chemistry.

Read More »

Assessment 4: Tableau Dashboard and Report

Issued:                Monday of Week 4 Due:                     11:59PM (local Time) Wednesday of Week 7 Weight:                60% Report Length: 1500 – 4000 words + Tableau *.twbx file Overview During this assessment you will produce an interactive Tableau Dashboard and an accompanying report detailing the planning of the Tableau Dashboard. Background Tableau dashboards

Read More »

Assessment 3: Critical Review of a Tableau Dashboard

Issued:                Monday of Week 1 Due:                     11:59PM (local Time) Sunday of Week 5 Weight:                20% Length:               5-10 minutes (approx. 500-3000 words) Overview During this assessment you will produce a video presentation critically reviewing a Tableau dashboard from a design planning and communication perspective. Background Tableau dashboards are used extensively for

Read More »

Wireless Communication Engineering Assignment Help

Looking for Wireless Communication Engineering Assignment Help? If you are looking for wireless communication engineering assignment help, just get it quickly online! The good news is that you no longer need to chase your professors around with confusion about assignments. Nor do you have to stress out as chase that

Read More »

Assessment 2: Planning and Creating Static Visualisations

Due:                     11:59PM (local Time) Sunday of Week 3 Weight:                20% Length:                1000-2500 words Overview During this assessment you will produce written report detailing the planning and creation of three static visualisations derived from a data table. In this assessment, the quality of the presented visualisations is not assessed, only the

Read More »

Nursing Healthcare Case Study Assignment Help

ASSESSMENT ITEM 2: DESCRIPTION Shared decision-making is a model for clinical practice which includes patients’/clients’ values and preferences and supports them to make decisions about their own care and treatment options in collaboration with their healthcare team (Geddis-Regan et al., 2020). A patient’s/client’s culture affects the way they understand health

Read More »

BSBCRT311 Apply Critical Thinking Skills in a Team Environment

Table of Contents Table of Contents…………………………………………………………………………………………………………………. 3 About the Business Services Training Package…………………………………………………………………………………………………………………. 4 About this Unit of Competency……………………………………………………………………………………………………………… 6 Chapter 1: Prepare to Address Workplace Problem…………………………………………………………………………………………………………………. 7 ………………………………………………………………………………………………………………………………………… 8 Key Points: Chapter 1…………………………………………………………………………………………………………….. 30 Chapter 1 – ‘True’ or ‘False’ Quiz……………………………………………………………………………………………………………. 31 Chapter 2: Evaluate Solutions for Workplace Problem…………………………………………………………………………………………………………………

Read More »

BSBCRT311 Apply critical thinking skills in a team environment

WORKPLACE PROJECT TASK   Student details  Student name  Student email address  Assessment Details  About this task  This workplace project requires you to use critical thinking to resolve two typical problems in the workplace.   This assessment includes the following tasks:  Task 1: Workplace Problems  Task 2: Self-reflection  You will need 2 participants who

Read More »

BSBCRT512 Originate and Develop Concepts

Contents Section 1: Scoping a relevant issue. 5 Section 2: Generating and evaluating solutions. 8 Section 3: Concept finalisation. 11 Student name:   Assessor:   Date:   Business or Community/Social group this assessment is based on:   Documentation reviewed as preparation:   Job role assumed for this assessment:   Section

Read More »

EMS5RCE – Risk Engineering (2022)

Assignment 2 Due Date: 13th February 2023, 23:59PM 1        Outline You have been tasked to evaluate the risks associated with moving from a traditional construction method for constructing concrete formwork (such as precast), to an advanced method that will be designed to take advantage of additive and/or automated and digital

Read More »

NIT3171 ICT Business Analysis & Data Visualization

Individual Assignment – Business Analysis Case Study (Stage II – 35 marks weighing 35%) Report Submission Date (through the dropbox): (10% will be deducted for each day of delay) Presentation (5 minutes each) 10 Marks: In this assignment, a Melbourne housing dataset is given to you to apply data mining

Read More »

HSC ECONOMICS The Global Economy

HSC ECONOMICS  Assessment Notification: Task 1 Subject: Economics Topic The Global Economy Nature of Assessment Task Oral presentation with a written component Weighting 25% Teacher Ms R Ali Date of Notification Term :4 Week 5A  (2022) Due Date Term 1 (2022), Week 7A,Friday (written component) and Week 8B(Oral component)  

Read More »

Behaviour & Environment Case Study

Section 1: Overview of Issue of Human-Environment Relations & Proposed Intervention (Delete this and enter your text for this section here) Section 2: Identify all key stakeholders: (Delete this and enter your text for this section here) Section 3: Explain how the Intervention Strategy should be implemented (Delete this and

Read More »

Assignment BMSC Pharmacology Breakdown

  Section Word Limit Marks Research Time Writing Time Description Clarity N/A 5 10 mins 1 hr sentence structure; typographical errors; scientific style Reference N/A 5 20 mins 40 mins correct use of referencing style and in text citations; typically 5-10 references depending on the topic/experimental platform and drugs used

Read More »

Assessment Task 3: Portfolio Output 3

This task requires you to create a blog post and a 3-4 minute edited video that critically and creatively responds to one of the Digital Media Contexts from weeks 7-10 (this must be a different topic from what you chose for Portfolio Output 2). Your video is to be embedded

Read More »

Formulae Sheet

Formulae Sheet Current ratio Current assets Current liabilities     Quick ratio or acid test Cash + marketable securities + net receivables Current liabilities     Current cash debt coverage Net cash provided by operating activities Average current liabilities     Receivables turnover Net sales Average net trade receivables  

Read More »

Cashflow and Financial Analysis

Assessment Task: 20% Cashflow and Financial Analysis – Template IMPORTANT:  Preparing the cashflow statement and financial analysis template. The template is prepared to satisfy all the assignment business’s so there may be extra line items in the template. To submit the cash flow statement, you need to use the template

Read More »

Cashflow and Financial Analysis – Ship’em In&Out

Assessment Task: 20% Cashflow and Financial Analysis – Ship’em In&Out IMPORTANT:  Preparing the cashflow statement and Financial analysis To submit the cash flow statement, you need to use the template document in CANVAS. The template is prepared to satisfy all the assignment business’s so there may be extra line items

Read More »

Pros and Cons of Chat GPT Assignment Help

How great is Chat GPT Assignment Help? Chat GPT Assignment help is definitely an incredible possibility for students. It is a technological advancement that can generate essays and articles on a massive range of topics. Moreover, you can just ask any question, and you will get your answer right away.

Read More »

Can't Find Your Assignment?

Open chat
1
Free Assistance
Universal Assignment
Hello 👋
How can we help you?