MIS604 – REQUIREMENT ENGINEERING Case Study Assignment

MIS604 – REQUIREMENT ENGINEERING

(Assessment 1)

Individual Report

(Case Study)

Contents

Introduction 3

A Product Roadmap and a Product Backlog 3

Discussion 3

Power 4

Two actor within Organization 4

Story Mapping 4

Minimum Viable Product 5

Requirement engineering 5

Objective: 6

Foremost activities: 6

Key stakeholders: 6

Output: 6

Elicitation Plan 6

Elicitation strategies 7

Requirements Traceability Matrix to manage the requirements through each stage of the requirements lifecycle 7

Conclusion 8

References 9

Introduction

The process of identifying, recording and preserving specifications for engineering is important. Engineering requirements. In the engineering and software systems, the mechanism is extremely important. In order for companies that need short-term assistance to register on line in connection, the start-up student builds a Site and also a mobile app mix. The report focuses on the organizational approach of application Student Gigz Pty Ltd, which focuses on study completion. It focuses on the organisation and development of companies for different programming requirements. Student Gigz Pty Ltd will build the website to support the alignment between expertise and the integration of intelligent alignment (Chawla et al., 2017). Requirement engineering is the framework for developing complex managerial organizations to generate various programming needs. Various necessity planning steps are known as criteria for each project to close the gap between the recognition of customers and the engineering concept.

A Product Roadmap and a Product Backlog

The product roadmap and the product backlog are two major project management strategies. Every approach has its own strengths and limitations: The product roadmap, for example, shows how the product is planned, as a strategic product planning guide, to expand over the next 12 months. It provides consistency, encourages collaboration between interested parties, helps to secure funding and enables coordination of the development of different goods and the launch of them. The product backlog includes the excellent work required to produce a product with epics and user stories, workflow diagrams, user interface design drawings and funny information. It provides the basis for monitoring development progress using a release burndown map, for example, and is a tool that guides the work of the development team (Dias and Cordeiro, 2020). The key interface for students is the smartphone application. Students may build a profile to choose their skills from the list they already have and the positions they can work. Project assistance, accounting, wireframing, prototyping and highly reliable marketing could involve typical tasks.

Discussion

Business analysts should make an effort to consider and encourage their partners and sell their benefits voluntarily. You must inform partners as to how the market review cycle should be assessed and how. The presence of stakeholders is one of the excellent issues of business analysts. The main goal of creating a web and moving application combination is to concentrate Students Gigz Pty Ltd. The application combination should allow the registration of the service online by other organisations needing short-term aid, which provides students with the required skills. The student start-up company also aims to ensure that organisations can invite students to fulfil their short-term vacancies with the appropriate skills in a short time.

Business needs are the basic activities of an enterprise to meet its operational objectives. Business specifications describe a project business solution, including documentation of consumer needs and preferences. New software is to be introduced by business requirements. That is why the company needs it. New software is to be introduced by business requirements. The company therefore requires a documentation of business needs (BRD) to describe the corporate solution of the business project, such as customer information about its requirements and expectations. This means that the organising partners reach consensus, provide feedback into the next stage and explain how the solution can meet the needs of the students. Furthermore, the BRD will provide Students from Gigz Pty Ltd with information on what to do to address student and business needs to the technology provider.

Power

Even though its main area on a player’s chart is the critical and oral analysis of the partner’s power, it is vital to feel the partner’s impact. For example, an administrative office is normally extremely capable of stopping the job, of maintaining its support and immediately stopping the company. The mission’s achievement depends largely on ongoing training.

Two actor within Organization

The actors are model elements in a system process organisation. Either an individual or some other external system can be the model feature. There is also an actor in the management of the company enterprise as a prerequisite for the design and workflow of technical processes (Yu et al., 2016). Actor operators are generally outside the process of the organisational framework and thus communicate directly with the system’s results or inputs. Therefore, actors are used in the management of specifications in Students Gigz Pty Ltd. Students, organisations and more are part of the start-up business.

• The student plays an important role in the process of the system. A primary student gui is the smartphone application. Students may build a profile to pick their skills from a previous list and where they can work.

• All contracts and companies and postal listings for short-term work needs shall be signed by Organizations. They can send job alerts in their listing to students who have adequate skills to work in their location by broadcasting message. The web system also allows organisations to examine the student profiles and exchange targeted messages in a particular field to the students.

Story Mapping

A Functional Requirement (FR) is also functional specifications that describe the software process’s service. It outlines the software system and its components (Becker et al., 2019, p. 154). The function in the software system includes; its behavior, inputs, outputs, and more. It can be a business process, calculation, user interaction, data manipulation or any system functionality (Young, 2004, p. 4). As in the requirements engineering, functional specifications defines specific outcomes of the system. In requirement engineering, Functional Requirements ranges from either a higher abstract statement or senders requirement to the applicable requirement mathematical specifications (Faily and Flechais, 2016). Therefore functional software engineering helps the organization to access the required behavior of the system. The following is the requirements engineering Functional Requirements (FR);

  • User registration- the students will be able to create a profile by registering their biodata to the web system, where they will be able to select their skills from a pre-existing list and the location suitable for them to work from.
  • Posting/ sharing temporary jobs- the organizations can send job alerts to the students with appropriate skills in their listing, who can work in their location via a message broadcast.
  • Rating and reviewing- the organizations can review students profiles and send targeted messages to students with experiences in a particular area. The organizations will also rate the student’s job offering based on their profiles.
  • Signing online contracts/ undertakings- the organizations will use the web portal to sign all contracts and undertakings and post listings for their short-term employment needs.
  • Online payment- the organization will securely make payment for the students upon job completion through the app.

Minimum Viable Product

Lean Startup’s idea is a minimally viable product (MVP), which highlights the effect of learning on new product growth. Eric Ries described the MVP as a new product version which allows a team to gather as much validated customer knowledge as possible with the slightest effort. The validated learning is whether your customers actually buy your product (Mabkhot et al., 2018). A main concept behind the idea from MVP is that you create an actual product that you can sell to your clients and observe their actual conduct using the product or service (which may be no more than a Landing Page or a service with an appearance of automation, but is fully manually operated behind the scenes). It is much more accurate to see what people are doing with a product than to ask people what they are going to do.

Requirement engineering

To achieve requirement engineering, the knowledge exchange is already created to create results to complete this project based on the objectives and objectives of goods. This is the most critical stage of the life cycle of software creation (Macleod & Hewitt, 2018). It is available in requirement engineering approaches that translate the imprecise requirements and possible requirements. It is considered during the software creation process of software and demand engineering.

Objective: 

In this case, Student Gigz Pty Ltd’s main objectives of this work are to produce a particular software that includes many important features also including employment generation for multiple people and job creation by various customers.

Foremost activities:

  • This application’s first job is to take care of the users
  • Another activity of this application is to provide the individual who tends to do the work with the correct information.

Key stakeholders:

Three main players, such as the applications administrator, the customer, and the managed user, are here in this case.

Output: 

This app takes customers to work on the one hand and sends the work to the person in care; two different results come from each other; one is the work performed by the customer, and the other one is, here many people get the job and can earn money.

Elicitation Plan 

The elicitation plan is to establish an effective and efficient elicitation plan consisting of the information produced, the response, effective negotiation, and decision-making. The defined elicitation plan describes every stage of requirement engineering.

Diverse key activities are considered and the project goals and the results of each phase are discussed:

  • Set of information sources
  • Organization of information sources
  • Set of criteria
  • Criteria for the indication and analysis
  • Mapping requirements for particular elements
  • Project requirements division
  • Description of new requirements-based objectives 
  • Validation Requirements

The recovery plan is designed to describe the plan by the inclusion of key activities and components, based on requirements (Thew and Sutcliffe, 2018). The knowledge can be developed at business elicitation sessions through the determination of processes to interfere with. It can be found as stakeholders can bid to attract people worldwide. For example, the physical meeting of stakeholders and the implementation of meetings with improved audience involvement can be encouraged. The strategy explains the scope of the projects to identify the integration of the borders to be delivered.

Elicitation strategies 

Strategies for elicitation comprise surveys and interviews focusing on the technique to evoke requirements. The stakeholder or customer interviews can be linked by using the mobile contact mechanism. Survey questions are designed to be processed during the application period, while survey responses are provided. The strategies are useful in concentrating on stakeholder calendars that participate in a meeting to finish the project (Khan et al., 2016). Techniques that are referred to during the elicitation sessions may be useful to address stakeholder growth and knowledge management systems. Interviews: The related stakeholders are consumers and business people. An interview with the professionals will be asked to include the list of questions including the contact protocol, the discussion of working opportunities, and the recommendation for a mobile application. Here the interviewer is the administrator and the respondent is the entity who applied for the job. 

Surveys: The questions will cover the time the application is being processed, how the whole work is completed and how happy you are with this mobile app. All these issues are therefore classified based on (very probable, likely, and unlikely) choices.

Requirements Traceability Matrix to manage the requirements through each stage of the requirements lifecycle

A traceability Matrix (RTM) is a document used by organizations to co-relate two forms that need many relationships to confirm the relationship completeness. Its main significance in an organization is to validate every requirement evaluated by the test cases such that each functionality is established during the software test  (Khan et al., 2016).

IDAss. IDRequirements DescriptionBusiness Need, JustificationsProject ObjectivesRequested ByDepartmentsWBS ElementSpecificationsDesignTest Cases
11.1User registrationFor login purposesRequire project featuresStudents Gigz technical teamContent3FinishedIn progress4.1
11.2Posting and sharing temporary jobsFor the skilled students to selectRequire project featuresStudents Gigz technical teamContent3.1FinishedFinished4.3
11.3Rating and reviewingTo consider job allocationRequire project featuresStudents Gigz technical teamContent3.2Not startedIn progress4.4
11.4Signing online contractsTo access initial informationRequire project featuresStudents Gigz technical teamContent3.3FinishedOn progress4.7
11.5Online paymentPayment for the complete tasksRequire project featuresStudents Gigz technical teamContent3.4Not startedNot started4.9

Conclusion

It could be concluded that the whole project has to boost global specifications for the mobile application. The web interface would successfully defend the application against possible losses. However, the unsuitable planning phase will influence the overall needs of the organisation. On the other hand, important factors have been taken into account and a high success rate has been established. In this particular section it was concluded that many of the requirements considered were considered necessary for the development of the application in various aspects. Each emphasis and perspective are therefore central to the development of an effective product. Furthermore, it was concluded that it requires association of the needs that combine each of the exciting places, thus linking different focuses with views. This creates a plus for device developer association specifications. For both software and hardware to operate together, association specifications are defined in system engineering.

References

Chawla, S., Srivastava, S., & Bedi, P. (2017). Improving the quality of web applications with web specific goal driven requirements engineering. International Journal of System Assurance Engineering and Management8(1), 65-77.

Dias Canedo, E., & Cordeiro Mendes, B. (2020). Software Requirements Classification Using Machine Learning Algorithms. Entropy22(9), 1057.

Faily, S., & Fléchais, I. (2016). Finding and resolving security misusability with misusability cases. Requirements Engineering21(2), 209-223.

Khan, F., Jan, S. R., Tahir, M., Khan, S., & Ullah, F. (2016). Survey: dealing non-functional requirements at architecture level. VFAST Transactions on Software Engineering4(1), 27-33.

Mabkhot, M. M., Al-Ahmari, A. M., Salah, B., & Alkhalefah, H. (2018). Requirements of the smart factory system: A survey and perspective. Machines6(2), 23.

Macleod, C., & Hewitt, R. (2018). Developing an outcome-based web application: principles and requirements specification.

Thew, S., & Sutcliffe, A. (2018). Value-based requirements engineering: method and experience. Requirements engineering23(4), 443-464.

Yu, Y., Au, M. H., Ateniese, G., Huang, X., Susilo, W., Dai, Y., & Min, G. (2016). Identity-based remote data integrity checking with perfect data privacy preserving for cloud storage. IEEE Transactions on Information Forensics and Security12(4), 767-778.

Get the used solution for MIS604 – REQUIREMENT ENGINEERING Case Study and many more or order a fresh one. Click here to download now!

Universal Assignment (September 27, 2022) MIS604 – REQUIREMENT ENGINEERING Case Study Assignment. Retrieved from https://universalassignment.com/mis604-requirement-engineering-case-study-assignment/.
"MIS604 – REQUIREMENT ENGINEERING Case Study Assignment." Universal Assignment - September 27, 2022, https://universalassignment.com/mis604-requirement-engineering-case-study-assignment/
Universal Assignment May 14, 2022 MIS604 – REQUIREMENT ENGINEERING Case Study Assignment., viewed September 27, 2022,<https://universalassignment.com/mis604-requirement-engineering-case-study-assignment/>
Universal Assignment - MIS604 – REQUIREMENT ENGINEERING Case Study Assignment. [Internet]. [Accessed September 27, 2022]. Available from: https://universalassignment.com/mis604-requirement-engineering-case-study-assignment/
"MIS604 – REQUIREMENT ENGINEERING Case Study Assignment." Universal Assignment - Accessed September 27, 2022. https://universalassignment.com/mis604-requirement-engineering-case-study-assignment/
"MIS604 – REQUIREMENT ENGINEERING Case Study Assignment." Universal Assignment [Online]. Available: https://universalassignment.com/mis604-requirement-engineering-case-study-assignment/. [Accessed: September 27, 2022]

Please note along with our service, we will provide you with the following deliverables:

Please do not hesitate to put forward any queries regarding the service provision.

We look forward to having you on board with us.

Get 45%* OFF on Assignment Help

Popular Assignments

VU22977 – Practice in a Legal Environment

Advanced Diploma of Legal Practice – 22565VIC PORTFOLIO- CLIENT MATTER FILE Assessment task 1 Prepare a comprehensive portfolio of documents to create a Client Matter File which must include: Element 1 Area of law Cover sheet stating client name and short description of legal matter Client Instruction Sheet, Costs Agreement

Read More »

KIT714 ICT Research Principles: Assignment 1

Practical Qualitative Research Exercise                                                                                                                                         Type:                 In-Semester, Individual Assignment Task Length:   minimum 2,000 words Weighting:     20% of total assessment for this unit Due Date:       Friday 5 August 2022 – 11:55 pm (Week05) Submission:    electronic submission on MyLO (WORD or PDF) Description:    This practical exercise will engage students in a qualitative research

Read More »

MODULE 44-704463 Dissertation Help

ASSESSMENT CRITERIA Dissertation (12,500 words) Deadline: JULY 29th 2022, 3pm Introduction and abstract  Situates the research question within the, theory, and concepts Explains the value of the study.  Relevance of the research question, to the field of study is fully justified. Leads logically into the Literature Review. Abstract of professional

Read More »

ITECH1103-Assignment: Assignment 2: Analytics Report

Overview The purpose of this task is to provide students with practical experience in writing a data analytical report to provide useful insights, patterns, and trends in a chosen dataset in the light of a set of tasks required within this document. This dataset will be chosen from the UC

Read More »

PBHL20001 Term 1, 2022 – Supplementary Assessment

PBHL20001 Term 1, 2022 Supplementary Assessment The influenza pandemic that followed World War I and took place over the period from 1918-1920 resulted in an estimated 100 million deaths worldwide and 500 million infections. In addition, this pandemic had a significant impact on public health practice throughout the 20th century

Read More »

Community Health Project 1 (HLTH 3058): Assessment 2: Portfolio Task 2

Community Health Project 1 (HLTH 3058) Assessment 2: Portfolio Task 2 – Evaluative Framework Marking Guide Weighting: 15% the total grade for the course   Criteria Outstanding performance (75-100%) Exceeds core requirements (65-74%) Meets core requirements (50-64%) Does not meet requirements (<50%) Comments Content (70%) Demonstrates adequate knowledge of integrating

Read More »

Community Health Project 1 (HLTH 3058): Assessment 2: Portfolio Task 1

Community Health Project 1 (HLTH 3058)Assessment 2: Portfolio Task 1 – Ethical Considerations Marking GuideWeighting of 15% the total grade for the course Criteria Outstanding performance (75-100%) Exceeds core requirements (65-74%)   Meets core requirements (50-64%) Does not meet requirements (<50%) Comments CONTENT (80%) Ethical Considerations   Demonstrates adequate knowledge

Read More »

SAM 11486/SAM G 6677: Assignment 1 – Individual

Assignment 1 – Individual (25%) Report Due: 11:59pm Sunday Week 5 04/09/2022 This assignment will be marked out of 25 marks and is worth 25% of the overall mark for the unit. Please check the unit outline for late penalties and restrictions on late submissions. This assignment is an individual

Read More »

11486 Systems Analysis and Modelling

Assignment Case Study C – Feed Me Now Disclaimer: The situation described in the following case study is fictional, and bears no resemblance to any persons, businesses, or organisations, living or dead. Any such resemblance, if exists, is merely co-incidental in nature, and is not intentional. Feed Me Now is

Read More »

MAA703 – Accounting for Management

Trimester 2 2022 Assessment Task 2 Part B – Teamwork Reflection (Individual) DUE DATE AND TIME:                        Wednesday, 7 September 2022 by 8:00pm (AEST) PERCENTAGE OF FINAL GRADE:    10% WORD COUNT:                                   750 – 800 words Description Teamwork is one of the vital components of many workplaces and the ability to demonstrate

Read More »

Research project assessment proforma and marking schemes

BSc Biomedical Sciences with Health, Exercise and Nutrition (HEN6004) and BSc Biomedical Science (APS6022) Instructions for use All forms must be completed electronically and uploaded to the student submission point in  turnitin. Please note the literature review assessment will be completed in January whereas the assessment of the paper/poster and

Read More »

XERO and Spotlight reporting software Report Assignment

Case facts – Read me carefully please City Infrastructure Holdings Ltd (CIH) and Network Maintenance Services Ltd (NMS) City Infrastructure Holdings Ltd (CIH) acquired 100% of the 300,000 issued shares in Network Maintenance Services (NMS) on 1 July 2021.  The consideration provided to shareholders of NMS consisted of $1.20 in cash plus 1

Read More »

KIT103 Computational Science

School of Information and Communication Technology College of Sciences and Engineering Unit Outline KIT103 Computational Science Semester 2, 2022 Sandy Bay Campus, Hobart Newnham Campus, Launceston COVID-19 (Coronavirus Information) For information on how you can help keep us all safe, please review the Coronavirus updates page here: https://www.utas.edu.au/about/safety-security-and-wellbeing/coronavirus Sections that

Read More »

SEN725 Urban Stormwater Asset Design

Assessment Task -4 Final Report – Analysis of CoGG Stormwater Network Weight 50% This is an individual assessment task. Plagiarism and collusion is unacceptable practice at Deakin University. You must appropriately reference your work. Failure to do so will result in disciplinary action. For more information on plagiarism and collusion,

Read More »

PSY3PRP 2022 Assignment 2: Research Project Report

PSY3PRP 2022 Assignment 2: Research Project Report Guidelines and Marking Rubric Individual Research Report due Wednesday 19th October 11.59pm (50% of total grade) For this assignment—with support through structured tutorial work across much of the semester— you will produce an individually-written report on the broad topic of feeding difficulties in

Read More »

Increasing Demand for assignment help in Namibia

With the growing population, the demand for clean energy, advanced technology, new structures, and better healthcare is escalating day by day which makes engineering the most popular degree for the youth. As more people pursue engineering nowadays, it also makes it one of the most difficult and competitive degrees also.

Read More »

Online Assignment Help in Germany

How Could You Do Exam Preparation Effectively? Exam time is full of challenges and difficulties. You have to juggle exams even in high school, college, or higher education. It defines your knowledge of a specific subject and how well you know the curriculum. The exam also tests how much you

Read More »

Get Excellent Human Values Assignment Help Immediately

Get Excellent Human Values Assignment Help Immediately: Expert Solutions to all your Queries Instant Human Values Assignment Help Online Students can get Human Values assignment help online in a fast and simple way from the experts at Universal Assignment Help Service. Their team of over 172+ subject experts works every

Read More »

Get Top Modern History Assignment Help Online

Order Modern History Assignment Help immediately Students often need modern history assignment help for many reasons. Getting immediate online help for assignments helps students boost their academics in incredible ways. Sometimes, the pressure of studies is too much to take for students. This causes them to score poor grades and

Read More »

Get Instant Assignment Help in the United Arab Emirates

How Can Assignments Help Students? Whatever the definition of homework is, one thing is certain: it helps students thoroughly learn the concepts they have studied in class. The number of such assignments may cause stress or a burden. It means students and tutors are both correct in their type of

Read More »

Assignment Help in Mexico

How to Gain Awesome Grades in Your Chemistry Subject? Whether you are pursuing a technical degree or studying in the science stream, chemistry is always at the forefront. If you love to observe reactions, molecules, acids, condensation, evaporation, and dilution, chemistry will prove a resource for getting outstanding academic marks.

Read More »

Assignment Help in Kenya

How Could You Find the Best Biology Homework Website? Getting online homework help from an expert is neither embarrassing nor unauthentic. The vast majority of students around the world believe that doing online assignments and tutoring is beneficial. The Standard Graduate School of Education revealed that 56% of students suffer

Read More »

Assignment Help in Bangladesh

The Best 6 Hacks to Shortlist the Top Civil Engineering Assignment Tutor? Finding a homework expert for civil engineering assignments is a hectic task. As civil engineering has several fields, getting expertise is difficult for tutors. You may struggle to receive civil engineering assignment help in Bangladesh due to this

Read More »

Assignment Help in Pakistan

What Will Unethical Occur from Getting Homework? Homework looks like a mode of learning in most cases. But what happens to its quantity? Its quantity should be more than enough for students. Such circumstances may be detrimental to the health of the pupils. Sometimes, college faculties or teachers forget to

Read More »

Assignment Help in Malaysia

The Best 4 Skills You Should Learn For Making Your Career in 2022 As technological innovations leap forward daily, new skills are entering our market. Sticking to one skill set enables you to lose lucrative job opportunities. That is why it gives importance to having diverse skills, which should be

Read More »

MKT200 Marketing Principles: Infographic

Assessment 2 Information Subject Code: MKT200 Subject Name: Marketing Principles Assessment Title: Infographic Assessment Type: Individual infographic Length: Two pages Weighting: 30% Total Marks: 100 Submission: Online Due Date: Week 9 Your task Individually, you are required to create a two-page infographic outlining the communications process of two competitor brands.

Read More »

MMP-223, Property and Real Estate Law and Practice

MMP-223, Property and Real Estate Law and Practice, Trimester 2, 2022 Assignment 2, Client Report, Individual Assignment 25% of Unit Assessment (1,250 words*) Due Date: September 16, 2022, 8-pm AEST Assignment Brief: Clyde, being a real estate agent, loves property. With his share of the sale of the Sorrento property

Read More »

NUR1398 – Foundations of Nursing Practice Theory

Assessment: Care Plan Report Task overview Course NUR1398 – Foundations of Nursing Practice Theory Brief task description Written care plan addressing nursing care requirements for older patients with degenerative conditions. Rationale for assessment task Registered Nurses are required to think through the different aspects of patient care to arrive at

Read More »

MBA641 Project Strategy Framework

Assessment 1 Information Subject Code: MBA641 Subject Name: Strategic Project Management Assessment Title: Project Strategy Framework Assessment Type: Length: Individual video recording and supporting Infographic Video: 10-minute (no more) Supporting infographic: 1 page (no more) Weighting: 30% Total Marks: Submission: 100 Online Due Date: Week 4 Your task You are

Read More »

SEJ201 Structural Design Assessment

SEJ201 Structural Design Assessment Task 5 FINAL PROJECT REPORT Summary The Final Project Report is an individual task which builds on teamwork completed earlier in the trimester. This report shall clearly explain and justify the design solution proposed. In this report students you should identify project scope, inputs and constraints,

Read More »

42907 Design for Durability

Introduction Overall, explain what readers will find in the report, general information about the structure, location, climatic conditions, detail which specific parts of the structure will be designed according to which Australian standard. Which type of foundation, why? You can use figures in this section. Provide the scope of the

Read More »

Can't Find Your Assignment?

Open chat
1
Free Assistance
Universal Assignment
Hello 👋
How can we help you?